Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường tiểu học Quang Phục as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 3 contractor selection plans with a total of 10 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 33.33%, Consultancy 66.67%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 3,394,902,000 VND, of which the total winning bid value is: 3,387,955,000 VND.
- The savings rate is: 0.20%.
Data analysis results of DauThau.info software for bid solicitors Trường tiểu học Quang Phục as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 33.33%, Consulting 66.67%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 3,394,902,000 VND, in which the total winning value is: 3,387,955,000 VND.
- The savings rate is: 0.20%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường tiểu học Quang Phục are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 5 contractor selection plans, of which 3 were self-published, and 2 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường tiểu học Quang Phục announced the results of the bid package Bidding package to buy pure drinking water for students of Quang Phuc Primary School in 2026 .
- Winning bidder: Công ty TNHH Sản xuất và Dịch vụ Thương mại Việt Á
30/12/2025 16:23
Trường tiểu học Quang Phục publishes the plan Bidding package to buy pure drinking water for students of Quang Phuc Primary School in 2026 with 1 bidding package .
26/12/2025 16:20
Trường tiểu học Quang Phục announced the results of the bid package Providing boarding meals for students at Quang Phuc Primary School for the 2025 - 2026 school year .
- Winning bidder: CÔNG TY TNHH CHẾ BIẾN VÀ CUNG CẤP THỰC PHẨM HOA PHƯỢNG
31/10/2025 08:57
Trường tiểu học Quang Phục publishes the plan Providing boarding meals for students at Quang Phuc Primary School for the 2025 - 2026 school year with 1 bidding package .
28/10/2025 16:50
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package 04: Construction supervision consultancy of the investor Trường tiểu học Quang Phục.
- Winning bidder: TTA CONSULTANT DESIGN AND CONSTRUCTION COMPANY LIMITED
04/02/2025 14:51
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 03: Construction of the investor Trường tiểu học Quang Phục.
- Winning bidder: THANH DUC GENERAL BUILDING JOINT STOCK COMPANY
27/12/2024 15:54
Bid solicitor Trường tiểu học Quang Phục has posted Tender Notice Package 04: Construction supervision consultancy of the investor Trường tiểu học Quang Phục with the form Open bidding.
23/12/2024 17:03
Bid solicitor Trường tiểu học Quang Phục has posted Tender Notice Tender package No 03: Construction of the investor Trường tiểu học Quang Phục with the form Competitive Offer.
18/12/2024 15:01
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 02: Consulting on appraisal of bidding documents and results Selecting construction supervision and construction consulting contractor of the investor Trường tiểu học Quang Phục.
- Winning bidder: DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY
17/12/2024 15:05
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 01: Consulting on preparation of bidding documents and evaluation of bidding documents for bidding packages of construction supervision and construction consultancy of the investor Trường tiểu học Quang Phục.
- Winning bidder: KIEN AN TRADING AND CONSTRUCTION DESIGN CONSULTING JOINT STOCK COMPANY
17/12/2024 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
Trường tiểu học Quang Phục announced the results of the bid package Package 04: Construction supervision consultancy .
- Winning bidder: TTA CONSULTANT DESIGN AND CONSTRUCTION COMPANY LIMITED
04/02/2025 14:51
Trường tiểu học Quang Phục announced the results of the bidding package Package 04: Construction supervision consultancy with 1 participating contractors .
10/01/2025 10:13
Trường tiểu học Quang Phục announced the results of the bid package Package No. 03: Construction .
- Winning bidder: THANH DUC GENERAL BUILDING JOINT STOCK COMPANY
27/12/2024 15:54
Trường tiểu học Quang Phục announced the results of the bidding package Tender package No 03: Construction with 1 participating contractors .
25/12/2024 16:04
Trường tiểu học Quang Phục publishes Tender Notice Package 04: Construction supervision consultancy in the form Open bidding .
23/12/2024 17:03
Trường tiểu học Quang Phục publishes Tender Notice Tender package No 03: Construction in the form Competitive Offer .
18/12/2024 15:01
Trường tiểu học Quang Phục announced the results of the bid package Package No. 02: Consulting on appraisal of bidding documents and results Selecting construction supervision and construction consulting contractor .
- Winning bidder: DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY
17/12/2024 15:05
Trường tiểu học Quang Phục announced the results of the bid package Package No. 01: Consulting on preparation of bidding documents and evaluation of bidding documents for bidding packages of construction supervision and construction consultancy .
- Winning bidder: KIEN AN TRADING AND CONSTRUCTION DESIGN CONSULTING JOINT STOCK COMPANY
17/12/2024 15:03
Trường tiểu học Quang Phục publishes the plan Project contractor selection plan: Repairing 2-story classrooms in area B of Quang Phuc Primary School with 5 bidding package .
14/12/2024 15:58
Trường tiểu học Quang Phục announced the results of the bid package Package No. 04: Consulting on preparing economic and technical reports .
- Winning bidder: HOANG PHAT ARCHITECTURAL DESIGN JOINT STOCK COMPANY
02/07/2024 09:52
The data sheet has been partially hidden, to see the full information please Login or Register
Trường tiểu học Quang Phục announced the results of the bid package Bidding package to buy pure drinking water for students of Quang Phuc Primary School in 2026 .
- Winning bidder: Công ty TNHH Sản xuất và Dịch vụ Thương mại Việt Á
30/12/2025 16:23
Trường tiểu học Quang Phục publishes the plan Bidding package to buy pure drinking water for students of Quang Phuc Primary School in 2026 with 1 bidding package .
26/12/2025 16:20
Trường tiểu học Quang Phục announced the results of the bid package Providing boarding meals for students at Quang Phuc Primary School for the 2025 - 2026 school year .
- Winning bidder: CÔNG TY TNHH CHẾ BIẾN VÀ CUNG CẤP THỰC PHẨM HOA PHƯỢNG
31/10/2025 08:57
Trường tiểu học Quang Phục publishes the plan Providing boarding meals for students at Quang Phuc Primary School for the 2025 - 2026 school year with 1 bidding package .
28/10/2025 16:50
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package 04: Construction supervision consultancy of the investor Trường tiểu học Quang Phục.
- Winning bidder: TTA CONSULTANT DESIGN AND CONSTRUCTION COMPANY LIMITED
04/02/2025 14:51
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 03: Construction of the investor Trường tiểu học Quang Phục.
- Winning bidder: THANH DUC GENERAL BUILDING JOINT STOCK COMPANY
27/12/2024 15:54
Bid solicitor Trường tiểu học Quang Phục has posted Tender Notice Package 04: Construction supervision consultancy of the investor Trường tiểu học Quang Phục with the form Open bidding.
23/12/2024 17:03
Bid solicitor Trường tiểu học Quang Phục has posted Tender Notice Tender package No 03: Construction of the investor Trường tiểu học Quang Phục with the form Competitive Offer.
18/12/2024 15:01
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 02: Consulting on appraisal of bidding documents and results Selecting construction supervision and construction consulting contractor of the investor Trường tiểu học Quang Phục.
- Winning bidder: DUC THAI CONSTRUCTION CONSULTING AND INVESTMENT LIMITED COMPANY
17/12/2024 15:05
The Bid solicitor Trường tiểu học Quang Phục has posted the results of the bidding package Package No. 01: Consulting on preparation of bidding documents and evaluation of bidding documents for bidding packages of construction supervision and construction consultancy of the investor Trường tiểu học Quang Phục.
- Winning bidder: KIEN AN TRADING AND CONSTRUCTION DESIGN CONSULTING JOINT STOCK COMPANY
17/12/2024 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Trường tiểu học Quang Phục has posted 3 of the contractor selection plan, which contains 10 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Trường tiểu học Quang Phục has posted 3 Tender Notices in 3 bidding packages. Among these, 3 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường tiểu học Quang Phục has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Trường tiểu học Quang Phục has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường tiểu học Quang Phục has a relationship with 5 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường tiểu học Quang Phục has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects