Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TIỂU HỌC TRÙNG KHÁNH as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 9 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 0 packages that have not fully posted the contractor selection results. Of these 0 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 921,637,173 VND, of which the total winning bid value is: 909,784,000 VND.
- The savings rate is: 1.29%.
Data analysis results of DauThau.info software for bid solicitors TRƯỜNG TIỂU HỌC TRÙNG KHÁNH as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 921,637,173 VND, in which the total winning value is: 909,784,000 VND.
- The savings rate is: 1.29%.
This Bid solicitor is also an investor. The analysis results of data for the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 13 contractor selection plans, of which 10 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Providing meals for boarding meals from January 2026 to May 2026 .
- Winning bidder: CÔNG TY TNHH ĐẠI PHÚC
30/12/2025 17:02
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan for selecting contractors for procurement estimates: Providing meals for boarding meals from January 2026 to May 2026 with 1 bidding package .
24/12/2025 08:39
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan for selecting contractors for procurement estimates: Providing meals for boarding meals from January 2026 to May 2026 with 1 bidding package .
23/12/2025 09:42
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Repair and replace from wooden doors to aluminum and glass doors in area B of the classroom .
- Winning bidder: NGUYỄN THỊ HƯƠNG
10/12/2025 09:52
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan to select a contractor for the repair and replacement package from wood to aluminum and glass in area B of the classroom with 1 bidding package .
10/12/2025 09:48
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the results of the bidding package Bidding package for repairing plastic tiles inside the vice principal room and the Council room of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH.
- Winning bidder: PHẠM DUY HÀ
21/05/2025 09:21
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request The contractor selection plan, the package to repair the plastic tiles inside the Vice Principal's room and the Council room of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
21/05/2025 09:09
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the results of the bidding package Bidding package of window blinds, air -conditioning air conditioners of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH.
- Winning bidder: VŨ DUY KHANG
19/05/2025 12:27
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
19/05/2025 11:46
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
19/05/2025 11:17
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Bidding package for repairing plastic tiles inside the vice principal room and the Council room .
- Winning bidder: PHẠM DUY HÀ
21/05/2025 09:21
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan The contractor selection plan, the package to repair the plastic tiles inside the Vice Principal's room and the Council room with 1 bidding package .
21/05/2025 09:09
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Bidding package of window blinds, air -conditioning air conditioners .
- Winning bidder: VŨ DUY KHANG
19/05/2025 12:27
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area with 1 bidding package .
19/05/2025 11:46
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area with 1 bidding package .
19/05/2025 11:17
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Contractor selection plan, package: Repair replacement house brand .
- Winning bidder: VŨ DUY KHANG
05/05/2025 13:42
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Contractor selection plan, repair package for replacement house brand with 1 bidding package .
28/04/2025 14:18
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Bidding package repair replacing some tigraro bricks area of the school yard tanks .
- Winning bidder: PHẠM DUY HÀ
28/04/2025 11:26
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan The plan for contractor selection, repair package to replace some tigraro tiles in the school yard tank area with 1 bidding package .
25/04/2025 14:27
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Provide meals for semi -boarding students at Trung Khanh Primary School .
- Winning bidder: CÔNG TY TNHH ĐẠI PHÚC
10/04/2025 08:28
The data sheet has been partially hidden, to see the full information please Login or Register
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Providing meals for boarding meals from January 2026 to May 2026 .
- Winning bidder: CÔNG TY TNHH ĐẠI PHÚC
30/12/2025 17:02
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan for selecting contractors for procurement estimates: Providing meals for boarding meals from January 2026 to May 2026 with 1 bidding package .
24/12/2025 08:39
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan for selecting contractors for procurement estimates: Providing meals for boarding meals from January 2026 to May 2026 with 1 bidding package .
23/12/2025 09:42
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH announced the results of the bid package Repair and replace from wooden doors to aluminum and glass doors in area B of the classroom .
- Winning bidder: NGUYỄN THỊ HƯƠNG
10/12/2025 09:52
TRƯỜNG TIỂU HỌC TRÙNG KHÁNH publishes the plan Plan to select a contractor for the repair and replacement package from wood to aluminum and glass in area B of the classroom with 1 bidding package .
10/12/2025 09:48
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the results of the bidding package Bidding package for repairing plastic tiles inside the vice principal room and the Council room of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH.
- Winning bidder: PHẠM DUY HÀ
21/05/2025 09:21
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request The contractor selection plan, the package to repair the plastic tiles inside the Vice Principal's room and the Council room of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
21/05/2025 09:09
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the results of the bidding package Bidding package of window blinds, air -conditioning air conditioners of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH.
- Winning bidder: VŨ DUY KHANG
19/05/2025 12:27
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
19/05/2025 11:46
The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted the request Plan to select the house, bidding package to buy window blinds, to harmonize the atmosphere of the house area of the investor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH with 1 bidding package.
19/05/2025 11:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted 10 of the contractor selection plan, which contains 9 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity TRƯỜNG TIỂU HỌC TRÙNG KHÁNH has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects