Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Trường trung học cơ sở Mai Động as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Trường trung học cơ sở Mai Động as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Trường trung học cơ sở Mai Động are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 5 contractor selection plans, of which 0 were self-published, and 5 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Trường trung học cơ sở Mai Động announced the results of the bid package Providing maintenance cleaning services from January 2026 to December 2026 at Mai Dong Secondary School .
- Winning bidder: BINH AN CLEANING JOINT STOCK COMPANY
30/12/2025 09:31
Trường trung học cơ sở Mai Động announced the results of the bid package Providing and installing cameras at Mai Dong Secondary School .
- Winning bidder: CONG TY TNHH THUONG MAI VÀ CONG NGHE NGUYEN ANH
29/12/2025 19:14
Trường trung học cơ sở Mai Động announced the results of the bid package Supply and installation of outdoor sound sets for Mai Dong Secondary School .
- Winning bidder: CONG TY TNHH THUONG MAI VÀ CONG NGHE NGUYEN ANH
29/12/2025 19:09
Trường trung học cơ sở Mai Động publishes the plan Providing maintenance cleaning services from January 2026 to December 2026 at Mai Dong Secondary School with 1 bidding package .
26/12/2025 14:14
Trường trung học cơ sở Mai Động publishes the plan Providing and installing cameras at Mai Dong Secondary School with 1 bidding package .
24/12/2025 16:37
Trường trung học cơ sở Mai Động publishes the plan Supply and installation of outdoor sound sets for Mai Dong Secondary School with 1 bidding package .
24/12/2025 16:37
Trường trung học cơ sở Mai Động publishes the plan Providing and installing cameras at Mai Dong Secondary School with 1 bidding package .
24/12/2025 16:34
Trường trung học cơ sở Mai Động announced the results of the bid package Providing sanitary services maintained from September 2025 to December 2025 at Mai Dong Secondary School .
- Winning bidder: BINH AN CLEANING JOINT STOCK COMPANY
05/09/2025 12:22
Trường trung học cơ sở Mai Động publishes the plan Bidding contractor planning plan is estimated: Providing cleaning services from September 2025 to December 2025 at Mai Dong Secondary School with 1 bidding package .
05/09/2025 12:14
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Trường trung học cơ sở Mai Động has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Trường trung học cơ sở Mai Động has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects