Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND phường Nam Đồng as follows:
- Has relationships with 2 project owners.
- Has relationships with 21 contractor.
- Announced 10 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 28 contractor selection plans with a total of 70 bidding packages, of which 10 prequalification documents have not found the investment project.
- Has invited bids for 16 packages (with 18 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 24 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 16 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 46 packages that have not fully posted the contractor selection results. Of these 42 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 16.67%, Construction 77.78%, Consultancy 0%, Non-consultancy 5.56%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 20,538,006,000 VND, of which the total winning bid value is: 20,349,031,000 VND.
- The savings rate is: 0.92%.
Data analysis results of DauThau.info software for bid solicitors UBND phường Nam Đồng as follows:
- Has relationships with 21 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 16.67%, Construction 77.78%, Consulting 0%, Non-consulting 5.56%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 20,538,006,000 VND, in which the total winning value is: 20,349,031,000 VND.
- The savings rate is: 0.92%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND phường Nam Đồng are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 21 contractor selection plans, of which 17 were self-published, and 4 were published by other entities.
- Is the investor of 16 Tender Notices, of which 9 were self-invited, and 7 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND phường Nam Đồng announced the results of the bid package Package No. 06: Consulting on construction supervision and equipment installation .
01/12/2025 17:51
UBND phường Nam Đồng announced the results of the bid package Package 05: Project management consulting .
01/12/2025 17:49
UBND phường Nam Đồng announced the results of the bid package Package 04: Construction and equipment installation .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN XÂY DỰNG TH
01/12/2025 17:48
UBND phường Nam Đồng publishes the plan Plan for selecting construction contractors: Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city with 5 bidding package .
01/12/2025 17:45
Investor UBND phường Nam Đồng has posted an investment and development project Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city.
01/12/2025 17:17
UBND phường Nam Đồng announced the results of the bid package Package 02: Verification of construction drawing design and cost estimate .
- Winning bidder: DAM GIA CONSTRUCTION AND DESIGNING CONSULTANCY JOINT STOCK COMPANY
17/11/2025 11:14
UBND phường Nam Đồng announced the results of the bid package Package No. 03: Appraisal .
- Winning bidder: HFC Valuation joint stock company
17/11/2025 11:13
UBND phường Nam Đồng announced the results of the bid package Package No. 01: Making KTKT reports .
- Winning bidder: Công ty TNHH tư vấn đầu tư xây dựng và thương mại BG Group
17/11/2025 11:04
UBND phường Nam Đồng publishes the plan Contractor selection plan for the project investment preparation phase: Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city with 3 bidding package .
17/11/2025 10:59
UBND phường Nam Đồng announced the results of the bid package Package No. 03: Appraisal .
- Winning bidder: HFC Valuation joint stock company
06/10/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
UBND phường Nam Đồng announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG HẠ TẦNG 808
14/04/2025 09:02
UBND phường Nam Đồng announced the results of the bid package Tender package No 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG HẠ TẦNG 808
14/04/2025 08:58
UBND phường Nam Đồng announced the results of the bid package Package 01: Project Management .
- Winning bidder: Ban quản lý dự án đầu tư xây dựng cơ bản thành phố Hải Dương
14/04/2025 08:54
UBND phường Nam Đồng announced the results of the bid package Package 01: Project Management .
- Winning bidder: Ban quản lý dự án đầu tư xây dựng cơ bản thành phố Hải Dương
14/04/2025 08:50
UBND phường Nam Đồng publishes the plan Plan for selecting construction contractors: Construction of technical infrastructure, urban embellishment in Nhan Nghia 2 area, Nam Dong ward, Hai Duong city with 8 bidding package .
17/03/2025 10:11
UBND phường Nam Đồng publishes the plan Plan for selecting construction contractors: Construction of technical infrastructure, urban embellishment in Nhan Nghia 1 area, Nam Dong ward, Hai Duong city with 8 bidding package .
17/03/2025 09:46
UBND phường Nam Đồng publishes the plan Dredging canals, clearing the flow, repairing and repairing irrigation systems to serve agricultural production in Nam Dong Ward, Hai Duong city. with 4 bidding package .
28/11/2024 10:57
UBND phường Nam Đồng announced the results of the bid package Package 03: Project Management Consulting .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN XÂY DỰNG 7
26/06/2024 10:04
UBND phường Nam Đồng announced the results of the bid package Package No. 02: Bidding appraisal consultancy and contractor selection results .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN XÂY DỰNG 30-10
26/06/2024 10:01
UBND phường Nam Đồng announced the results of the bid package Tender package No 01: Consultancy on preparation of Bid Documents, Bid evaluation .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN XÂY DỰNG 7
26/06/2024 09:58
The data sheet has been partially hidden, to see the full information please Login or Register
UBND phường Nam Đồng announced the results of the bid package Package No. 06: Consulting on construction supervision and equipment installation .
01/12/2025 17:51
UBND phường Nam Đồng announced the results of the bid package Package 05: Project management consulting .
01/12/2025 17:49
UBND phường Nam Đồng announced the results of the bid package Package 04: Construction and equipment installation .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ TƯ VẤN XÂY DỰNG TH
01/12/2025 17:48
UBND phường Nam Đồng publishes the plan Plan for selecting construction contractors: Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city with 5 bidding package .
01/12/2025 17:45
Investor UBND phường Nam Đồng has posted an investment and development project Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city.
01/12/2025 17:17
UBND phường Nam Đồng announced the results of the bid package Package 02: Verification of construction drawing design and cost estimate .
- Winning bidder: DAM GIA CONSTRUCTION AND DESIGNING CONSULTANCY JOINT STOCK COMPANY
17/11/2025 11:14
UBND phường Nam Đồng announced the results of the bid package Package No. 03: Appraisal .
- Winning bidder: HFC Valuation joint stock company
17/11/2025 11:13
UBND phường Nam Đồng announced the results of the bid package Package No. 01: Making KTKT reports .
- Winning bidder: Công ty TNHH tư vấn đầu tư xây dựng và thương mại BG Group
17/11/2025 11:04
UBND phường Nam Đồng publishes the plan Contractor selection plan for the project investment preparation phase: Construction of auxiliary items at the Party Committee Headquarters - People's Council - People's Committee of Nam Dong ward, Hai Phong city with 3 bidding package .
17/11/2025 10:59
UBND phường Nam Đồng announced the results of the bid package Package No. 03: Appraisal .
- Winning bidder: HFC Valuation joint stock company
06/10/2025 14:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND phường Nam Đồng has posted 28 of the contractor selection plan, which contains 70 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND phường Nam Đồng has posted 18 Tender Notices in 16 bidding packages. Among these, 9 Tender Notices were self-invited, and 9 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND phường Nam Đồng has posted 24 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 24 package, canceled the bid 0 package (among the bidding packages above).
- There are 16 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND phường Nam Đồng has a relationship with 21 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND phường Nam Đồng has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND phường Nam Đồng has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects