Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND quận Long Biên as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 41 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 8 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 32 packages that have not fully posted the contractor selection results. Of these 31 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,297,688,434 VND, of which the total winning bid value is: 1,244,988,434 VND.
- The savings rate is: 4.06%.
Data analysis results of DauThau.info software for bid solicitors UBND quận Long Biên as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,297,688,434 VND, in which the total winning value is: 1,244,988,434 VND.
- The savings rate is: 4.06%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND quận Long Biên are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 7 contractor selection plans, of which 7 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 0 were self-invited, and 3 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the results of the bidding package Package No. 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên.
- Winning bidder: DIEN DEVELOPMENT CONSTRUCTION AND SERVICE JOINT STOCK COMPANY
28/06/2025 08:45
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Bidding package 08: Consulting on evaluation of Bidding Documents/HSYC, appraising the results of contractor selection Package 05, 09, 11 of the investor UBND quận Long Biên.
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
23/06/2025 14:20
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Bidding package 07: Consulting on making Bidding Bids/HSYC, evaluating Bidders/Bidding Bidding packages 05, 09, 11 of the investor UBND quận Long Biên.
- Winning bidder: VIET ROAD AND BRIDGE DESIGN CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
23/06/2025 14:16
The Bid solicitor UBND quận Long Biên has posted the request Plan for selecting project contractors Ingredients 1.2: Clearing ground in Long Bien area under the Tu Lien Bridge Construction Investment Project and the two ends of the bridge (from the intersection of Nghi Tam to the intersection with Truong Sa Street) of the investor UBND quận Long Biên with 7 bidding package.
14/06/2025 14:59
Investor UBND quận Long Biên has posted an investment and development project Component project 1.2: Sentiment clearance in Long Bien area under the project of investing in the construction of Tu Lien Bridge and the two ends of the bridge (from the intersection of Nghi Tam to the intersection with Truong Sa Street).
14/06/2025 14:14
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 16: Consulting on supervision of construction packages: 19,20,21 of the investor UBND quận Long Biên with the form Open bidding.
27/05/2025 11:19
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên with the form Open bidding.
12/05/2025 12:16
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Package No. 9: Consulting for setting up boundary markers, thick wedges, marking the boundaries, making and measuring land plots for site clearance work of the investor UBND quận Long Biên.
- Winning bidder: CADASTRAL AND SURVEY JOINT STOCK COMPANY
08/05/2025 10:46
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên with the form Open bidding.
22/04/2025 17:54
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Package No. 23: Surveying, preparing KTTC plans and estimates of the investor UBND quận Long Biên.
- Winning bidder: TIỂU ĐOÀN 544
22/04/2025 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
UBND quận Long Biên announced the results of the bid package Bidding package 08: Consulting on evaluation of Bidding Documents/HSYC, appraising the results of contractor selection Package 05, 09, 11 .
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
23/06/2025 14:20
UBND quận Long Biên announced the results of the bid package Bidding package 07: Consulting on making Bidding Bids/HSYC, evaluating Bidders/Bidding Bidding packages 05, 09, 11 .
- Winning bidder: VIET ROAD AND BRIDGE DESIGN CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
23/06/2025 14:16
UBND quận Long Biên publishes the plan Plan for selecting project contractors Ingredients 1.2: Clearing ground in Long Bien area under the Tu Lien Bridge Construction Investment Project and the two ends of the bridge (from the intersection of Nghi Tam to the intersection with Truong Sa Street) with 7 bidding package .
14/06/2025 14:59
UBND quận Long Biên announced the results of the bid package Package No. 9: Consulting for setting up boundary markers, thick wedges, marking the boundaries, making and measuring land plots for site clearance work .
- Winning bidder: CADASTRAL AND SURVEY JOINT STOCK COMPANY
08/05/2025 10:46
UBND quận Long Biên announced the results of the bid package Package No. 23: Surveying, preparing KTTC plans and estimates .
- Winning bidder: TIỂU ĐOÀN 544
22/04/2025 14:53
UBND quận Long Biên publishes the plan Contractor selection plan for the Project Project Project Investment Project Ingredier 1.2: Clearing ground in Long Bien district to serve the investment project to build Tu Lien Bridge and the two ends of the bridge (from the intersection with Nghi Tam Street to the intersection with Truong Sa Street) with 4 bidding package .
16/04/2025 09:38
UBND quận Long Biên publishes the plan Adjusting and supplementing the project contractor selection plan: Building Viet Hung-Cau ditches now and Ho Cu Block, Long Bien District with 12 bidding package .
31/03/2025 20:41
UBND quận Long Biên announced the results of the bid package Bidding package No. 2: Consulting on preparation of bidding documents and evaluation of bidding documents for consulting packages .
- Winning bidder: LAM GIANG CONSTRUCTION CONSULTING AND PROJECT MANAGEMENT JOINT STOCK COMPANY
21/03/2025 17:28
UBND quận Long Biên announced the results of the bid package Package No. 1: Consultancy, surveying, surveying, drawing and mapping the current state of scale 1/500 .
- Winning bidder: CADASTRAL AND SURVEY JOINT STOCK COMPANY
21/03/2025 17:27
UBND quận Long Biên publishes the plan Plan for contractor selection phase of project investment preparation: Investment in building Gia Thuong pumping station, air -conditioned lake and Thuong Thanh ditch, Long Bien district, Hanoi city with 8 bidding package .
21/03/2025 17:25
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted the results of the bidding package Package No. 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên.
- Winning bidder: DIEN DEVELOPMENT CONSTRUCTION AND SERVICE JOINT STOCK COMPANY
28/06/2025 08:45
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Bidding package 08: Consulting on evaluation of Bidding Documents/HSYC, appraising the results of contractor selection Package 05, 09, 11 of the investor UBND quận Long Biên.
- Winning bidder: JAPAN - VIET CONSTRUCTION INVESTMENT AND TRADING JOINT STOCK COMPANY
23/06/2025 14:20
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Bidding package 07: Consulting on making Bidding Bids/HSYC, evaluating Bidders/Bidding Bidding packages 05, 09, 11 of the investor UBND quận Long Biên.
- Winning bidder: VIET ROAD AND BRIDGE DESIGN CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
23/06/2025 14:16
The Bid solicitor UBND quận Long Biên has posted the request Plan for selecting project contractors Ingredients 1.2: Clearing ground in Long Bien area under the Tu Lien Bridge Construction Investment Project and the two ends of the bridge (from the intersection of Nghi Tam to the intersection with Truong Sa Street) of the investor UBND quận Long Biên with 7 bidding package.
14/06/2025 14:59
Investor UBND quận Long Biên has posted an investment and development project Component project 1.2: Sentiment clearance in Long Bien area under the project of investing in the construction of Tu Lien Bridge and the two ends of the bridge (from the intersection of Nghi Tam to the intersection with Truong Sa Street).
14/06/2025 14:14
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 16: Consulting on supervision of construction packages: 19,20,21 of the investor UBND quận Long Biên with the form Open bidding.
27/05/2025 11:19
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên with the form Open bidding.
12/05/2025 12:16
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Package No. 9: Consulting for setting up boundary markers, thick wedges, marking the boundaries, making and measuring land plots for site clearance work of the investor UBND quận Long Biên.
- Winning bidder: CADASTRAL AND SURVEY JOINT STOCK COMPANY
08/05/2025 10:46
Bid solicitor Ban quản lý dự án đầu tư xây dựng quận Long Biên has posted Tender Notice Tender package No 19: Construction of technical infrastructure of ditches and lakes of the investor UBND quận Long Biên with the form Open bidding.
22/04/2025 17:54
The Bid solicitor UBND quận Long Biên has posted the results of the bidding package Package No. 23: Surveying, preparing KTTC plans and estimates of the investor UBND quận Long Biên.
- Winning bidder: TIỂU ĐOÀN 544
22/04/2025 14:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND quận Long Biên has posted 7 of the contractor selection plan, which contains 41 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND quận Long Biên has posted 8 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 8 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND quận Long Biên has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND quận Long Biên has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects