Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND Thị Trấn Chợ Mới as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 17 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 18 contractor selection plans with a total of 15 bidding packages, of which 18 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 9 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 530,101,000 VND, of which the total winning bid value is: 522,849,717 VND.
- The savings rate is: 1.37%.
Data analysis results of DauThau.info software for bid solicitors UBND Thị Trấn Chợ Mới as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 530,101,000 VND, in which the total winning value is: 522,849,717 VND.
- The savings rate is: 1.37%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND Thị Trấn Chợ Mới are as follows:
- Is the investor of 17 development investment projects.
- Is the investor of 18 contractor selection plans, of which 18 were self-published, and 0 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit of the investor UBND Thị Trấn Chợ Mới.
- Winning bidder: VIETNAM POSTS AND TELECOMMUNICATIONS GROUP
25/06/2025 18:02
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
24/06/2025 16:06
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request New installation of street lights on the embankment of Sao Mai residential area of the investor UBND Thị Trấn Chợ Mới with 4 bidding package.
07/01/2025 14:45
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Repair and replace public lighting of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:06
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Repairing the welcome gate bordering Long Dien A commune of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:05
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Artistic lamp decoration at Sao Mai Residential Park, Khom Thi 2, Cho Moi town of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:03
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Dismantle the artistic flower lights on the route from Ong Chuong bridge to COOPMART Supermarket, Nguyen Huu Canh street, Le Loi route and check, repair, upgrade the still usable artistic flower light system to reinstall the route. Road section from Ong Chuong Bridge to green light - red light and inspection and repair of Tran Hung Dao street of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 16:59
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Decorative artistic lights at Sao Mai Residential Park, Thi 2 hamlet, Cho Moi town of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:52
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Repair and replace public lighting of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:49
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Repairing the welcome gate bordering Long Dien A commune of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
UBND Thị Trấn Chợ Mới announced the results of the bid package Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit .
- Winning bidder: VIETNAM POSTS AND TELECOMMUNICATIONS GROUP
25/06/2025 18:02
UBND Thị Trấn Chợ Mới publishes the plan Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit with 1 bidding package .
24/06/2025 16:06
UBND Thị Trấn Chợ Mới publishes the plan New installation of street lights on the embankment of Sao Mai residential area with 4 bidding package .
07/01/2025 14:45
UBND Thị Trấn Chợ Mới announced the results of the bid package Repair and replace public lighting .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN XÂY DỰNG VÀ DỊCH VỤ TOÀN PHÚ
06/01/2025 17:06
UBND Thị Trấn Chợ Mới announced the results of the bid package Repairing the welcome gate bordering Long Dien A commune .
- Winning bidder: NGUYỄN VĂN THANH
06/01/2025 17:05
UBND Thị Trấn Chợ Mới announced the results of the bid package Artistic lamp decoration at Sao Mai Residential Park, Khom Thi 2, Cho Moi town .
- Winning bidder: CÔNG TY TNHH MTV TM DV TK QUẢNG CÁO ĐÔNG NGUYÊN
06/01/2025 17:03
UBND Thị Trấn Chợ Mới announced the results of the bid package Dismantle the artistic flower lights on the route from Ong Chuong bridge to COOPMART Supermarket, Nguyen Huu Canh street, Le Loi route and check, repair, upgrade the still usable artistic flower light system to reinstall the route. Road section from Ong Chuong Bridge to green light - red light and inspection and repair of Tran Hung Dao street .
- Winning bidder: Thiết bị văn phòng - quảng cáo Lê Thành Tính
06/01/2025 16:59
UBND Thị Trấn Chợ Mới publishes the plan Decorative artistic lights at Sao Mai Residential Park, Thi 2 hamlet, Cho Moi town with 1 bidding package .
06/01/2025 16:52
UBND Thị Trấn Chợ Mới publishes the plan Repair and replace public lighting with 1 bidding package .
06/01/2025 16:49
UBND Thị Trấn Chợ Mới publishes the plan Repairing the welcome gate bordering Long Dien A commune with 1 bidding package .
06/01/2025 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit of the investor UBND Thị Trấn Chợ Mới.
- Winning bidder: VIETNAM POSTS AND TELECOMMUNICATIONS GROUP
25/06/2025 18:02
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Installation of infrastructure, information technology equipment, internal network systems at the People's Committee and the Public Administration Service Center after arranging and organizing the commune -level administrative unit of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
24/06/2025 16:06
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request New installation of street lights on the embankment of Sao Mai residential area of the investor UBND Thị Trấn Chợ Mới with 4 bidding package.
07/01/2025 14:45
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Repair and replace public lighting of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:06
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Repairing the welcome gate bordering Long Dien A commune of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:05
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Artistic lamp decoration at Sao Mai Residential Park, Khom Thi 2, Cho Moi town of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 17:03
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the results of the bidding package Dismantle the artistic flower lights on the route from Ong Chuong bridge to COOPMART Supermarket, Nguyen Huu Canh street, Le Loi route and check, repair, upgrade the still usable artistic flower light system to reinstall the route. Road section from Ong Chuong Bridge to green light - red light and inspection and repair of Tran Hung Dao street of the investor UBND Thị Trấn Chợ Mới.
06/01/2025 16:59
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Decorative artistic lights at Sao Mai Residential Park, Thi 2 hamlet, Cho Moi town of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:52
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Repair and replace public lighting of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:49
The Bid solicitor UBND Thị Trấn Chợ Mới has posted the request Repairing the welcome gate bordering Long Dien A commune of the investor UBND Thị Trấn Chợ Mới with 1 bidding package.
06/01/2025 16:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND Thị Trấn Chợ Mới has posted 18 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND Thị Trấn Chợ Mới has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND Thị Trấn Chợ Mới has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND Thị Trấn Chợ Mới has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects