Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND THỊ TRẤN ĐẦM DƠI as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 9 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 8 contractor selection plans with a total of 50 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 2 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 42 packages that have not fully posted the contractor selection results. Of these 42 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,346,079,057 VND, of which the total winning bid value is: 4,054,734,524 VND.
- The savings rate is: 6.70%.
Data analysis results of DauThau.info software for bid solicitors UBND THỊ TRẤN ĐẦM DƠI as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 3.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,346,079,057 VND, in which the total winning value is: 4,054,734,524 VND.
- The savings rate is: 6.70%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND THỊ TRẤN ĐẦM DƠI are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 7 contractor selection plans, of which 7 were self-published, and 0 were published by other entities.
- Is the investor of 12 Tender Notices, of which 2 were self-invited, and 10 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted the results of the bidding package Construction of works: lining the sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN ĐẦU TƯ XÂY DỰNG BẢO HÂN
11/04/2025 16:41
The Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted the results of the bidding package Package No. 07: Construction of works: lined with sidewalk bricks, upgrading embankments and roads from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI.
01/04/2025 10:48
The Bid solicitor HOP NHAT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted the results of the bidding package Package No. 07: Construction of works: sidewalk brick lining and road drainage system 30/4, pineapple 1, Dam Doi town (west) (section from Tran Van Phan street with road 30 /4 to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI.
- Winning bidder: CÔNG TY TNHH MTV ĐẦU TƯ VÀ XÂY DỰNG NAM VIỆT CÀ MAU
21/03/2025 16:09
Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted Tender Notice Construction of works: lining the sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
19/03/2025 14:07
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
17/03/2025 10:53
Investor UBND THỊ TRẤN ĐẦM DƠI has posted an investment and development project Sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house.
17/03/2025 10:10
Bid solicitor HOP NHAT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted Tender Notice Tender package No 07: Construction of works: sidewalk brick lining and road drainage system 30/4, pineapple 1, Dam Doi town (west) (section from Tran Van Phan street with road 30 /4 to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
25/02/2025 16:46
Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted Tender Notice Tender package No 07: Construction of works: lined with sidewalk bricks, upgrading embankments and roads from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
20/02/2025 10:47
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Tiles on the sidewalk, upgrading embankments and revealing sections from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
18/02/2025 09:09
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Sidewalk tiles and road drainage systems 30/4, pineapple 1, Dam Doi town (West) (section from Tran Van Phan street with 30/4 street to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
17/02/2025 10:53
The data sheet has been partially hidden, to see the full information please Login or Register
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house with 7 bidding package .
17/03/2025 10:53
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Tiles on the sidewalk, upgrading embankments and revealing sections from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street with 7 bidding package .
18/02/2025 09:09
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Sidewalk tiles and road drainage systems 30/4, pineapple 1, Dam Doi town (West) (section from Tran Van Phan street with 30/4 street to Thay Chuong Bridge) with 7 bidding package .
17/02/2025 10:53
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Phan Ngoc Hien Bridge (starting from Truong Phung Xuan street, group 5 through Phan Ngoc Hien street, group 2, Dam Doi town) with 8 bidding package .
02/07/2024 21:18
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Overcoming landslides on Highway 1, Dam Doi town with 6 bidding package .
27/06/2024 12:06
UBND THỊ TRẤN ĐẦM DƠI announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH ĐẠT THÀNH
24/04/2024 10:54
UBND THỊ TRẤN ĐẦM DƠI announced the results of the bidding package Civil Works with 3 participating contractors .
11/04/2024 16:01
UBND THỊ TRẤN ĐẦM DƠI publishes Tender Notice Civil Works in the form Competitive Offer .
05/04/2024 16:48
UBND THỊ TRẤN ĐẦM DƠI publishes Tender Notice Civil Works in the form Competitive Offer .
03/04/2024 16:41
UBND THỊ TRẤN ĐẦM DƠI publishes the plan Upgrading and expanding Le Khac Xuong road, cluster 5, Dam Doi town with 5 bidding package .
29/03/2024 14:58
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted the results of the bidding package Construction of works: lining the sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN TƯ VẤN ĐẦU TƯ XÂY DỰNG BẢO HÂN
11/04/2025 16:41
The Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted the results of the bidding package Package No. 07: Construction of works: lined with sidewalk bricks, upgrading embankments and roads from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI.
01/04/2025 10:48
The Bid solicitor HOP NHAT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted the results of the bidding package Package No. 07: Construction of works: sidewalk brick lining and road drainage system 30/4, pineapple 1, Dam Doi town (west) (section from Tran Van Phan street with road 30 /4 to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI.
- Winning bidder: CÔNG TY TNHH MTV ĐẦU TƯ VÀ XÂY DỰNG NAM VIỆT CÀ MAU
21/03/2025 16:09
Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted Tender Notice Construction of works: lining the sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
19/03/2025 14:07
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
17/03/2025 10:53
Investor UBND THỊ TRẤN ĐẦM DƠI has posted an investment and development project Sidewalk tiles from Mr. Le Thuy Hang's house to Mr. Le Bao Truong's house.
17/03/2025 10:10
Bid solicitor HOP NHAT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED has posted Tender Notice Tender package No 07: Construction of works: sidewalk brick lining and road drainage system 30/4, pineapple 1, Dam Doi town (west) (section from Tran Van Phan street with road 30 /4 to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
25/02/2025 16:46
Bid solicitor CA MAU CONSTRUCTION SUPERVISION CONSULTANTS COMPANY LTD has posted Tender Notice Tender package No 07: Construction of works: lined with sidewalk bricks, upgrading embankments and roads from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI with the form Open bidding.
20/02/2025 10:47
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Tiles on the sidewalk, upgrading embankments and revealing sections from Phan Ngoc Hien bridge to agricultural bridge, Truong Phung Xuan street of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
18/02/2025 09:09
The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted the request Sidewalk tiles and road drainage systems 30/4, pineapple 1, Dam Doi town (West) (section from Tran Van Phan street with 30/4 street to Thay Chuong Bridge) of the investor UBND THỊ TRẤN ĐẦM DƠI with 7 bidding package.
17/02/2025 10:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND THỊ TRẤN ĐẦM DƠI has posted 8 of the contractor selection plan, which contains 50 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted 2 Tender Notices in 1 bidding packages. Among these, 2 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has posted 2 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 2 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND THỊ TRẤN ĐẦM DƠI has a relationship with 4 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND THỊ TRẤN ĐẦM DƠI has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects