Data analysis results of DauThau.info software for bid solicitors UBND xã Bản Nguyên as follows:
- Has relationships with 26 contractor.
- Announced 17 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 26 contractor selection plans with a total of 90 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 23 packages (with 26 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 36 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 17 packages with results that do not have tender notice or prequalification notice.
- There are 52 packages that have not fully posted the contractor selection results. Of these 51 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.18 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 128,419,276,318 VND, of which the total winning bid value is: 128,087,466,113 VND.
- The savings rate is: 0.26%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Bản Nguyên as follows:
- Has relationships with 26 contractor.
- The average number of contractors participating in each bidding package is: 1.18 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 128,419,276,318 VND, in which the total winning value is: 128,087,466,113 VND.
- The savings rate is: 0.26%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 17 investment and development projects.
- As the owner of 18 Contractor selection plan in which 18 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 20 bidding packages in which 19 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Bid package No. 04: Tu
Exam supervision advice
construction work of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY TNHH MTV ĐỨC TƯỜNG
17/10/2024 21:52
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Bidding package number 03: Examination
construction industry
submit of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG AN HUY
17/10/2024 13:36
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor UBND xã Bản Nguyên.
- Winning bidder: Công ty Cổ phần Tư vấn và Xây dựng Phú Thọ PLQ
11/10/2024 09:02
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Tender package No 01: Project management consulting of the investor UBND xã Bản Nguyên.
- Winning bidder: THT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
11/10/2024 08:25
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation of the investor UBND xã Bản Nguyên.
- Winning bidder: BINH MINH PHU THO CONSTRUCTION JOINT STOCK COMPANY
11/10/2024 08:19
The Bid solicitor UBND xã Bản Nguyên has posted the request Construction contractor selection plan: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) of the investor UBND xã Bản Nguyên with 4 bidding package.
11/10/2024 08:16
UBND xã Bản Nguyên Posted Development Investment Project Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10).
11/10/2024 08:08
The Bid solicitor UBND xã Bản Nguyên has posted the request Contractor selection plan for the project investment preparation phase: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) of the investor UBND xã Bản Nguyên with 1 bidding package.
11/10/2024 07:56
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Package No. 1: Survey and prepare technical and economic reports for construction: Renovating and upgrading rural roads from area 11 to area 12 in Ban Nguyen commune of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG THÀNH CHUNG
12/09/2024 09:51
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Project management consultancy of the investor UBND xã Bản Nguyên.
- Winning bidder: TST NORTHERN CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
12/09/2024 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Bản Nguyên announced the results of the bid package Bid package No. 04: Tu
Exam supervision advice
construction work .
- Winning bidder: CÔNG TY TNHH MTV ĐỨC TƯỜNG
17/10/2024 21:52
UBND xã Bản Nguyên announced the results of the bid package Bidding package number 03: Examination
construction industry
submit .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG AN HUY
17/10/2024 13:36
UBND xã Bản Nguyên announced the results of the bid package Consulting, surveying, making economic - technical reports .
- Winning bidder: Công ty Cổ phần Tư vấn và Xây dựng Phú Thọ PLQ
11/10/2024 09:02
UBND xã Bản Nguyên announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: THT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
11/10/2024 08:25
UBND xã Bản Nguyên announced the results of the bid package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation .
- Winning bidder: BINH MINH PHU THO CONSTRUCTION JOINT STOCK COMPANY
11/10/2024 08:19
UBND xã Bản Nguyên publishes the plan Construction contractor selection plan: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) with 4 bidding package .
11/10/2024 08:16
UBND xã Bản Nguyên publishes the plan Contractor selection plan for the project investment preparation phase: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) with 1 bidding package .
11/10/2024 07:56
UBND xã Bản Nguyên announced the results of the bid package Package No. 1: Survey and prepare technical and economic reports for construction: Renovating and upgrading rural roads from area 11 to area 12 in Ban Nguyen commune .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG THÀNH CHUNG
12/09/2024 09:51
UBND xã Bản Nguyên announced the results of the bid package Project management consultancy .
- Winning bidder: TST NORTHERN CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
12/09/2024 09:44
UBND xã Bản Nguyên announced the results of the bid package Prepare tender documents and evaluate bids. .
- Winning bidder: PHUONG DONG JSC JOINT STOCK COMPANY
12/09/2024 09:41
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Bid package No. 04: Tu
Exam supervision advice
construction work of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY TNHH MTV ĐỨC TƯỜNG
17/10/2024 21:52
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Bidding package number 03: Examination
construction industry
submit of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ XÂY DỰNG AN HUY
17/10/2024 13:36
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Consulting, surveying, making economic - technical reports of the investor UBND xã Bản Nguyên.
- Winning bidder: Công ty Cổ phần Tư vấn và Xây dựng Phú Thọ PLQ
11/10/2024 09:02
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Tender package No 01: Project management consulting of the investor UBND xã Bản Nguyên.
- Winning bidder: THT CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
11/10/2024 08:25
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Package 02: E-HSMT preparation consultancy, E-HSDT evaluation of the investor UBND xã Bản Nguyên.
- Winning bidder: BINH MINH PHU THO CONSTRUCTION JOINT STOCK COMPANY
11/10/2024 08:19
The Bid solicitor UBND xã Bản Nguyên has posted the request Construction contractor selection plan: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) of the investor UBND xã Bản Nguyên with 4 bidding package.
11/10/2024 08:16
UBND xã Bản Nguyên Posted Development Investment Project Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10).
11/10/2024 08:08
The Bid solicitor UBND xã Bản Nguyên has posted the request Contractor selection plan for the project investment preparation phase: Renovating and upgrading the Dike rural road from area 7 to area 14, Ban Nguyen commune (Section from QL2D to area 10) of the investor UBND xã Bản Nguyên with 1 bidding package.
11/10/2024 07:56
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Package No. 1: Survey and prepare technical and economic reports for construction: Renovating and upgrading rural roads from area 11 to area 12 in Ban Nguyen commune of the investor UBND xã Bản Nguyên.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG THÀNH CHUNG
12/09/2024 09:51
The Bid solicitor UBND xã Bản Nguyên has posted the results of the bidding package Project management consultancy of the investor UBND xã Bản Nguyên.
- Winning bidder: TST NORTHERN CONSTRUCTION AND INVESTMENT JOINT STOCK COMPANY
12/09/2024 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Bản Nguyên has posted 26 of the contractor selection plan, which contains 90 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND xã Bản Nguyên has posted 26 Tender Notice in the 23 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Bản Nguyên has posted 36 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 36 package, canceled the bid 0 package (among the bidding packages above).
- There are 17 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Bản Nguyên has a relationship with 26 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND xã Bản Nguyên has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND xã Bản Nguyên is the investor of 20 package, of which 19 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND xã Bản Nguyên is the owner of 18 contractor selection plan. In which, they self-invite 18 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor UBND xã Bản Nguyên is an investor with 26 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND xã Bản Nguyên is the investor of 17 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register