Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Hạnh Lâm as follows:
- Has relationships with 1 project owners.
- Has relationships with 6 contractor.
- Announced 10 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 31 bidding packages, of which 3 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 5 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 20 packages that have not fully posted the contractor selection results. Of these 19 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 909,436,000 VND, of which the total winning bid value is: 904,436,000 VND.
- The savings rate is: 0.55%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Hạnh Lâm as follows:
- Has relationships with 6 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 909,436,000 VND, in which the total winning value is: 904,436,000 VND.
- The savings rate is: 0.55%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Hạnh Lâm are as follows:
- Is the investor of 10 development investment projects.
- Is the investor of 15 contractor selection plans, of which 9 were self-published, and 6 were published by other entities.
- Is the investor of 9 Tender Notices, of which 1 were self-invited, and 8 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Hạnh Lâm announced the results of the bid package Package No. 1: Consulting on preparing first-time documents on forest protection for households, individuals, and communities in 2025 in Hanh Lam commune .
- Winning bidder: Đoàn điều tra quy hoạch Lâm nghiệp
10/01/2026 09:20
UBND xã Hạnh Lâm publishes the plan Sustainable forestry development program in 2025 in Hanh Lam commune with 1 bidding package .
10/01/2026 09:17
UBND xã Hạnh Lâm announced the results of the bid package Tender package No 03: Construction supervision consultancy .
31/12/2025 14:58
UBND xã Hạnh Lâm announced the results of the bid package Package 02: The entire construction and installation part of the work .
- Winning bidder: Công ty TNHH xây dựng và phát triển Phú Quang
31/12/2025 14:56
UBND xã Hạnh Lâm announced the results of the bid package Package No. 01: Construction project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP THANH HUY
31/12/2025 14:53
UBND xã Hạnh Lâm publishes the plan Sustainable forestry development program in 2025 in Hanh Lam commune with 1 bidding package .
31/12/2025 14:36
UBND xã Hạnh Lâm publishes the plan Repair (Damage and damage caused by storm No. 5 and Storm No. 10) Thanh Duc kindergarten, Hanh Lam commune, Nghe An province with 3 bidding package .
23/12/2025 16:26
Investor UBND xã Hạnh Lâm has posted an investment and development project Repair (Damage and damage caused by storm No. 5 and Storm No. 10) Thanh Duc kindergarten, Hanh Lam commune, Nghe An province.
23/12/2025 16:16
UBND xã Hạnh Lâm announced the results of the bid package Buy 05-seat car, 01 bridge to serve general work of the People's Committee of Hanh Lam commune, Nghe An province .
- Winning bidder: CÔNG TY TNHH Ô TÔ TRUNG ĐÔ
16/12/2025 09:09
UBND xã Hạnh Lâm announced the results of the bid package Bidding package for examining technical economic reports .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP THANH HUY
10/12/2025 15:19
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Hạnh Lâm publishes the plan Building a versatile house and auxiliary item of Hanh Lam Primary School with 5 bidding package .
09/06/2025 14:36
UBND xã Hạnh Lâm announced the results of the bid package Bidding package 01: Consulting on setting up HSYC, E-HSMT and evaluating HSDX, E- Bid Bids of bidding packages that have not yet organized LCNT. .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ DỊCH VỤ AN PHÚC
14/04/2025 17:07
UBND xã Hạnh Lâm announced the results of the bid package Package 02: Consulting for evaluation of HSYC, E-BSMT and LCNT results of bidding packages .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XD PHÚ CƯỜNG
14/04/2025 17:05
UBND xã Hạnh Lâm publishes the plan Renovating and upgrading the route of 359 University from Ho Chi Minh road to Thanh Son section through Hanh Lam commune, Thanh Chuong district with 5 bidding package .
14/04/2025 17:03
UBND xã Hạnh Lâm announced the results of the bidding package Package 04: The entire construction and installation part of the work with 1 participating contractors .
10/03/2025 15:45
UBND xã Hạnh Lâm publishes Tender Notice Package 04: The entire construction and installation part of the work in the form Competitive Offer .
03/03/2025 14:24
UBND xã Hạnh Lâm publishes the plan Building the main ditch of Dong Mon, Hanh Lam commune with 5 bidding package .
19/02/2025 10:41
UBND xã Hạnh Lâm announced the results of the bid package Package No. 01: Surveying and preparing economic and technical reports .
- Winning bidder: DAI NAM CONSTRUCTION & DESIGN CONSULTANT JOINT STOCK COMPANY
20/12/2024 17:00
UBND xã Hạnh Lâm publishes the plan Consulting on surveying and preparing project feasibility study report: construction of inter-commune road No. 359 from Ho Chi Minh road to Thanh Son, Hanh Lam commune, Thanh Chuong district with 1 bidding package .
20/12/2024 16:58
UBND xã Hạnh Lâm publishes the plan Support planting a number of tree varieties to build and replicate bright, green, clean, beautiful and safe villages and hamlets in Hanh Lam commune in 2024 with 3 bidding package .
07/11/2024 11:07
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Hạnh Lâm announced the results of the bid package Package No. 1: Consulting on preparing first-time documents on forest protection for households, individuals, and communities in 2025 in Hanh Lam commune .
- Winning bidder: Đoàn điều tra quy hoạch Lâm nghiệp
10/01/2026 09:20
UBND xã Hạnh Lâm publishes the plan Sustainable forestry development program in 2025 in Hanh Lam commune with 1 bidding package .
10/01/2026 09:17
UBND xã Hạnh Lâm announced the results of the bid package Tender package No 03: Construction supervision consultancy .
31/12/2025 14:58
UBND xã Hạnh Lâm announced the results of the bid package Package 02: The entire construction and installation part of the work .
- Winning bidder: Công ty TNHH xây dựng và phát triển Phú Quang
31/12/2025 14:56
UBND xã Hạnh Lâm announced the results of the bid package Package No. 01: Construction project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP THANH HUY
31/12/2025 14:53
UBND xã Hạnh Lâm publishes the plan Sustainable forestry development program in 2025 in Hanh Lam commune with 1 bidding package .
31/12/2025 14:36
UBND xã Hạnh Lâm publishes the plan Repair (Damage and damage caused by storm No. 5 and Storm No. 10) Thanh Duc kindergarten, Hanh Lam commune, Nghe An province with 3 bidding package .
23/12/2025 16:26
Investor UBND xã Hạnh Lâm has posted an investment and development project Repair (Damage and damage caused by storm No. 5 and Storm No. 10) Thanh Duc kindergarten, Hanh Lam commune, Nghe An province.
23/12/2025 16:16
UBND xã Hạnh Lâm announced the results of the bid package Buy 05-seat car, 01 bridge to serve general work of the People's Committee of Hanh Lam commune, Nghe An province .
- Winning bidder: CÔNG TY TNHH Ô TÔ TRUNG ĐÔ
16/12/2025 09:09
UBND xã Hạnh Lâm announced the results of the bid package Bidding package for examining technical economic reports .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY LẮP THANH HUY
10/12/2025 15:19
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Hạnh Lâm has posted 10 of the contractor selection plan, which contains 31 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor UBND xã Hạnh Lâm has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Hạnh Lâm has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 5 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Hạnh Lâm has a relationship with 6 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Hạnh Lâm has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Hạnh Lâm has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects