Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Lê Lợi as follows:
- Has relationships with 1 project owners.
- Has relationships with 9 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Lê Lợi as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Lê Lợi are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 4 contractor selection plans, of which 0 were self-published, and 4 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Lê Lợi announced the results of the bid package Package 04: Consulting on examining the project feasibility study .
- Winning bidder: THD THAI BINH CONSULTANT AND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
12/01/2026 15:01
UBND xã Lê Lợi announced the results of the bid package Bidding package No. 03: Consulting on preparing a proposal report for project environmental licensing .
- Winning bidder: CÔNG TY TNHH CÔNG NGHIỆP & MÔI TRƯỜNG HOA NAM
12/01/2026 14:58
UBND xã Lê Lợi announced the results of the bid package Bidding package: Consulting on appraisal of contractor selection results for project management consulting bidding package .
12/01/2026 14:55
UBND xã Lê Lợi announced the results of the bid package Bidding package: Consulting on preparing Bidding Documents, preparing Bid Evaluation Report for bidding package of Project Management Consulting .
12/01/2026 14:53
UBND xã Lê Lợi announced the results of the bid package Bidding package: Consulting on appraisal of contractor selection results, bidding package: Consulting on surveying and preparing construction drawing designs .
- Winning bidder: Công ty cổ phần tư vấn và xây dựng Hải Tiền
12/01/2026 14:51
UBND xã Lê Lợi announced the results of the bid package Bidding package: Consulting on preparation of Bidding Documents, preparation of Bidding Document Evaluation Report, bidding package Survey consulting, preparation of construction drawing design .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG VÀ ĐẤU THẦU HÀ NỘI
12/01/2026 14:49
UBND xã Lê Lợi publishes the plan Plan for selecting contractors for consulting packages for design and implementation steps after project basic design: Infrastructure of residential area in Cao Trung village, Thong Nhat commune, Kien Xuong district (for site clearance and residential area expansion) with 8 bidding package .
12/01/2026 14:46
UBND xã Lê Lợi publishes the plan Plan for selecting contractors for consulting packages and steps to prepare a Feasibility Study Report for the project: Infrastructure of residential area in Cao Trung village, Thong Nhat commune, Kien Xuong district (for site clearance and residential area expansion) with 2 bidding package .
10/01/2026 15:31
Investor UBND xã Lê Lợi has posted an investment and development project Infrastructure of residential area in Cao Trung village, Thong Nhat commune, Kien Xuong district (for site clearance and residential area expansion).
10/01/2026 15:15
UBND xã Lê Lợi announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN THIẾT KẾ VÀ XÂY DỰNG TIỀN HẢI
17/11/2025 09:07
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Lê Lợi has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Lê Lợi has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Lê Lợi has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects