Data analysis results of DauThau.info software for bid solicitors UBND xã Ngũ Hiệp as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 9 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 13 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,420,304,685 VND, of which the total winning bid value is: 2,405,989,990 VND.
- The savings rate is: 0.59%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Ngũ Hiệp as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,420,304,685 VND, in which the total winning value is: 2,405,989,990 VND.
- The savings rate is: 0.59%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Ngũ Hiệp are as follows:
- Is the investor of 9 development investment projects.
- Is the investor of 15 contractor selection plans, of which 12 were self-published, and 3 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Ngũ Hiệp announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Một thành viên Xây dựng Nguyễn Hải Sơn
09/01/2026 09:43
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision .
- Winning bidder: Công ty TNHH Xây dựng Hữu Điền
08/01/2026 17:46
UBND xã Ngũ Hiệp announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH MTV BẢO NGỌC
08/01/2026 17:44
UBND xã Ngũ Hiệp publishes the plan Handling landslides on the North bank of Nam Thon River (in front of the land of Mr. Trinh Van Thang and Mr. Nguyen Van Hue), Tay Hoa hamlet, Ngu Hiep commune (formerly Tay Hoa hamlet, Tam Binh commune) with 2 bidding package .
08/01/2026 17:41
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG - THƯƠNG MẠI HỒNG HƯNG PHÁT
08/01/2026 17:23
Investor UBND xã Ngũ Hiệp has posted an investment and development project Handling landslides on the North bank of Nam Thon River (in front of the land of Mr. Trinh Van Thang and Mr. Nguyen Van Hue), Tay Hoa hamlet, Ngu Hiep commune (formerly Tay Hoa hamlet, Tam Binh commune).
08/01/2026 17:17
UBND xã Ngũ Hiệp publishes the plan Regarding the approval of the plan to select a contractor to implement the Project of Remediating landslides in the dyke section combined with rural roads on the west bank of Hai Tan River, Tay Hoa hamlet, Ngu Hiep commune in front of Mr. Duong Van Luom's land. with 2 bidding package .
08/01/2026 17:14
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG - THƯƠNG MẠI HỒNG HƯNG PHÁT
08/01/2026 17:07
UBND xã Ngũ Hiệp publishes the plan Plan for selecting a contractor to implement the landslide site project on the south bank of Binh Ninh small river, Binh Ninh hamlet, Ngu Hiep commune (section of Ms. Nguyen Thi Khuya's land), Binh Ninh hamlet, Ngu Hiep commune with 2 bidding package .
08/01/2026 16:59
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Ngũ Hiệp announced the results of the bid package Shopping for 240 liter HDPE plastic trash and 660 liters for classification, storage, collection of daily -life solid waste in the commune .
- Winning bidder: SAI GON PLASTIC PRODUCING DEVELOPMENT COMMERCIAL COMPANY LIMITED
23/05/2025 12:52
UBND xã Ngũ Hiệp publishes the plan Shopping for installation system of intelligent radio station in Ngu Hiep commune with 1 bidding package .
20/05/2025 12:03
UBND xã Ngũ Hiệp publishes the plan Bidding package: Procurement of 240 -liter HDPE plastic trash and 660 liters for classification, storage, collection of daily -life solid waste in the commune with 1 bidding package .
15/05/2025 14:48
UBND xã Ngũ Hiệp announced the results of the bid package Building package of Bac Du Rach Rach section from District 70 to Ong Muoi Bridge .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG DỊCH VỤ THƯƠNG MẠI HAI LIÊN
16/04/2025 11:53
UBND xã Ngũ Hiệp publishes the plan The North Rach Ong Du Rach section from District 70 to Ong Muoi Bridge with 1 bidding package .
16/04/2025 10:07
UBND xã Ngũ Hiệp announced the results of the bid package Construction of concrete pavement .
- Winning bidder: CÔNG TY TNHH NHẬT TOÀN
16/04/2025 08:39
UBND xã Ngũ Hiệp announced the results of the bid package Bidding package No. 02: Technical supervision .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG KHANG MINH
16/04/2025 08:34
UBND xã Ngũ Hiệp publishes the plan Nam Rach Ong Du Rach Project (paragraph 2) The first point of Mrs. Nguyen Thi Tam - the end of Mr. Huynh Van Nhu's household, Ngu Hiep commune with 2 bidding package .
15/04/2025 20:14
UBND xã Ngũ Hiệp publishes the plan The North Rach Ong Du Rach section from District 70 to Ong Muoi Bridge with 1 bidding package .
09/04/2025 10:15
UBND xã Ngũ Hiệp publishes the plan Roads 11, 12, 14 (paragraph 2) The first point from the two bridge - the end of Mr. Nguyen Van Tien's household with 1 bidding package .
09/04/2025 10:11
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Ngũ Hiệp announced the results of the bid package Construction .
- Winning bidder: Công ty TNHH Một thành viên Xây dựng Nguyễn Hải Sơn
09/01/2026 09:43
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision .
- Winning bidder: Công ty TNHH Xây dựng Hữu Điền
08/01/2026 17:46
UBND xã Ngũ Hiệp announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH MTV BẢO NGỌC
08/01/2026 17:44
UBND xã Ngũ Hiệp publishes the plan Handling landslides on the North bank of Nam Thon River (in front of the land of Mr. Trinh Van Thang and Mr. Nguyen Van Hue), Tay Hoa hamlet, Ngu Hiep commune (formerly Tay Hoa hamlet, Tam Binh commune) with 2 bidding package .
08/01/2026 17:41
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG - THƯƠNG MẠI HỒNG HƯNG PHÁT
08/01/2026 17:23
Investor UBND xã Ngũ Hiệp has posted an investment and development project Handling landslides on the North bank of Nam Thon River (in front of the land of Mr. Trinh Van Thang and Mr. Nguyen Van Hue), Tay Hoa hamlet, Ngu Hiep commune (formerly Tay Hoa hamlet, Tam Binh commune).
08/01/2026 17:17
UBND xã Ngũ Hiệp publishes the plan Regarding the approval of the plan to select a contractor to implement the Project of Remediating landslides in the dyke section combined with rural roads on the west bank of Hai Tan River, Tay Hoa hamlet, Ngu Hiep commune in front of Mr. Duong Van Luom's land. with 2 bidding package .
08/01/2026 17:14
UBND xã Ngũ Hiệp announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG - THƯƠNG MẠI HỒNG HƯNG PHÁT
08/01/2026 17:07
UBND xã Ngũ Hiệp publishes the plan Plan for selecting a contractor to implement the landslide site project on the south bank of Binh Ninh small river, Binh Ninh hamlet, Ngu Hiep commune (section of Ms. Nguyen Thi Khuya's land), Binh Ninh hamlet, Ngu Hiep commune with 2 bidding package .
08/01/2026 16:59
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Ngũ Hiệp has posted 12 of the contractor selection plan, which contains 13 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Ngũ Hiệp has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND xã Ngũ Hiệp has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Ngũ Hiệp has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects