Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Thạch Quảng as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Thạch Quảng as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Thạch Quảng are as follows:
- Is the investor of 3 development investment projects.
- Is the investor of 11 contractor selection plans, of which 0 were self-published, and 11 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
UBND xã Thạch Quảng announced the results of the bid package Package No. 01: Consulting, surveying, making economic and technical reports .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ THÀNH AN
24/11/2025 08:21
UBND xã Thạch Quảng announced the results of the bid package Package 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN ĐẦU TƯ THÀNH AN
20/11/2025 13:41
UBND xã Thạch Quảng publishes the plan Contractor selection plan for the investment preparation phase of the project: Renovating and repairing the headquarters of the People's Committee of Thach Lam commune (old), Thach Quang commune, Thanh Hoa province with 2 bidding package .
19/11/2025 10:11
UBND xã Thạch Quảng announced the results of the bid package Tender package No 01: Construction and installation .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG QUANG VINH JSC
19/11/2025 10:06
UBND xã Thạch Quảng announced the results of the bid package Tender package No 01: Construction and installation .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG KIỂM HUỆ
19/11/2025 10:04
UBND xã Thạch Quảng announced the results of the bid package Package No. 01: Construction + Equipment .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY LẮP HOÀNG THẠCH
19/11/2025 10:00
UBND xã Thạch Quảng publishes the plan Project contractor selection plan: Repair and renovation of the headquarters of the Party Committee and People's Committee of Thach Quang commune, Thanh Hoa province with 3 bidding package .
19/11/2025 09:56
UBND xã Thạch Quảng announced the results of the bid package Package 02: Construction supervision consultancy .
- Winning bidder: THAIBINHDUONG XD AND TM - STOCK COMPANY
19/11/2025 09:44
UBND xã Thạch Quảng announced the results of the bid package Package 02: Construction supervision consultancy .
- Winning bidder: THAIBINHDUONG XD AND TM - STOCK COMPANY
19/11/2025 09:41
UBND xã Thạch Quảng announced the results of the bid package Consulting on preparing forest protection records .
- Winning bidder: LOC PHAT DEVELOPMENT INVESTMENT CO.,LTD
12/11/2025 11:44
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND xã Thạch Quảng has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND xã Thạch Quảng has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects