Data analysis results of DauThau.info software for bid solicitors UBND XÃ THUẬN HÒA as follows:
- Has relationships with 1 project owners.
- Has relationships with 20 contractor.
- Announced 26 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 30 contractor selection plans with a total of 102 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 149 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 13 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,426,077,267 VND, of which the total winning bid value is: 13,354,963,458 VND.
- The savings rate is: 0.53%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ THUẬN HÒA as follows:
- Has relationships with 20 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,426,077,267 VND, in which the total winning value is: 13,354,963,458 VND.
- The savings rate is: 0.53%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND XÃ THUẬN HÒA are as follows:
- Is the investor of 26 development investment projects.
- Is the investor of 30 contractor selection plans, of which 30 were self-published, and 0 were published by other entities.
- Is the investor of 9 Tender Notices, of which 0 were self-invited, and 9 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting to verify the design of construction drawings and construction estimates of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA with 3 bidding package.
28/06/2025 10:38
Investor UBND XÃ THUẬN HÒA has posted an investment and development project Repair of asphalt from Tra Kim Bridge to Soc Chua Pump Station.
28/06/2025 10:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 04: Consultancy and verification of construction drawing design and construction cost estimate of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects of the investor UBND XÃ THUẬN HÒA.
24/04/2025 08:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 02: Construction survey consultancy of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of construction investment projects for construction investment works of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep of the investor UBND XÃ THUẬN HÒA with 4 bidding package.
24/04/2025 08:05
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 03: Consulting to verify the design of construction drawings and construction estimates .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
UBND XÃ THUẬN HÒA announced the results of the bid package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
UBND XÃ THUẬN HÒA publishes the plan Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station with 3 bidding package .
28/06/2025 10:38
UBND XÃ THUẬN HÒA announced the results of the bid package Package 04: Consultancy and verification of construction drawing design and construction cost estimate .
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:10
UBND XÃ THUẬN HÒA announced the results of the bid package Package 02: Construction survey consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
UBND XÃ THUẬN HÒA announced the results of the bid package Package 01: Advice on management of construction investment projects for construction investment works .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
UBND XÃ THUẬN HÒA publishes the plan The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep with 4 bidding package .
24/04/2025 08:05
UBND XÃ THUẬN HÒA announced the results of the bid package Package No. 07: consultancy on appraisal of contractor selection results .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XD-TK PHÚC KHANG TRÀ VINH
24/04/2025 07:56
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting to verify the design of construction drawings and construction estimates of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
28/06/2025 10:42
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 02: Survey consultancy and Economic Report on technical investment in construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pumping Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:41
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of investment projects on construction of asphalt repair works from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
28/06/2025 10:39
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request Plan for contractor selection phase Preparation of project investment: Repair asphalt from Tra Kim Bridge to Soc Chua Pump Station of the investor UBND XÃ THUẬN HÒA with 3 bidding package.
28/06/2025 10:38
Investor UBND XÃ THUẬN HÒA has posted an investment and development project Repair of asphalt from Tra Kim Bridge to Soc Chua Pump Station.
28/06/2025 10:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 04: Consultancy and verification of construction drawing design and construction cost estimate of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY TNHH MTV TƯ VẤN - ĐẦU TƯ - XÂY DỰNG NHD
24/04/2025 08:11
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package No. 03: Consulting on preparing economic and technical reports for investment in construction projects of the investor UBND XÃ THUẬN HÒA.
24/04/2025 08:10
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 02: Construction survey consultancy of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:08
The Bid solicitor UBND XÃ THUẬN HÒA has posted the results of the bidding package Package 01: Advice on management of construction investment projects for construction investment works of the investor UBND XÃ THUẬN HÒA.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG 719
24/04/2025 08:07
The Bid solicitor UBND XÃ THUẬN HÒA has posted the request The contractor selection plan for the preparation of investment in the repair of asphalt and roads of Thuy Hoa hamlet, No Cong, Thuan Hiep of the investor UBND XÃ THUẬN HÒA with 4 bidding package.
24/04/2025 08:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND XÃ THUẬN HÒA has posted 30 of the contractor selection plan, which contains 102 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND XÃ THUẬN HÒA has posted 149 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 149 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND XÃ THUẬN HÒA has a relationship with 20 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND XÃ THUẬN HÒA has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects