Data analysis results of DauThau.info software for bid solicitors UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ as follows:
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 7 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,130,676,000 VND, of which the total winning bid value is: 1,130,676,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,130,676,000 VND, in which the total winning value is: 1,130,676,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 4 Contractor selection plan in which 4 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 0 bidding packages in which 0 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 01: Construction work: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
08/08/2024 09:55
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC KHÁNH
31/07/2024 15:54
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Project contractor selection plan: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 2 bidding package.
31/07/2024 15:52
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Plan for selecting a contractor to survey and prepare an economic report for the construction of the project: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 1 bidding package.
31/07/2024 15:44
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 03: Construction supervision consultancy: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: TUẤN HIỀN PHÚ THỌ COMPANY LIMITED
31/07/2024 15:33
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 02: Project management consulting: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: MINH THẨM COMPANY LIMITED
31/07/2024 15:31
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
31/07/2024 15:28
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 01: Construction work: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
31/07/2024 15:28
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Project contractor selection plan: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 3 bidding package.
31/07/2024 15:23
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ Posted Development Investment Project Renovating and repairing auxiliary items at Thuong Long secondary school, Yen Lap district.
31/07/2024 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Package No. 01: Construction work: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune .
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
08/08/2024 09:55
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC KHÁNH
31/07/2024 15:54
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ publishes the plan Project contractor selection plan: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune with 2 bidding package .
31/07/2024 15:52
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ publishes the plan Plan for selecting a contractor to survey and prepare an economic report for the construction of the project: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune with 1 bidding package .
31/07/2024 15:44
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Package No. 03: Construction supervision consultancy: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district .
- Winning bidder: TUẤN HIỀN PHÚ THỌ COMPANY LIMITED
31/07/2024 15:33
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Package No. 02: Project management consulting: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district .
- Winning bidder: MINH THẨM COMPANY LIMITED
31/07/2024 15:31
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC KHÁNH
31/07/2024 15:28
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ announced the results of the bid package Package No. 01: Construction work: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district .
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
31/07/2024 15:28
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ publishes the plan Project contractor selection plan: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district with 3 bidding package .
31/07/2024 15:23
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ publishes the plan Plan for selecting a contractor to survey and prepare an economic report for the construction of the project: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district with 1 bidding package .
31/07/2024 15:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 01: Construction work: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
08/08/2024 09:55
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG NGỌC KHÁNH
31/07/2024 15:54
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Project contractor selection plan: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 2 bidding package.
31/07/2024 15:52
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Plan for selecting a contractor to survey and prepare an economic report for the construction of the project: Renovating and repairing the cultural house of Dan Chu village, Thuong Long commune of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 1 bidding package.
31/07/2024 15:44
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 03: Construction supervision consultancy: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: TUẤN HIỀN PHÚ THỌ COMPANY LIMITED
31/07/2024 15:33
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 02: Project management consulting: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: MINH THẨM COMPANY LIMITED
31/07/2024 15:31
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Bidding package for consulting on surveying and preparing economic - technical reports for construction works: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
31/07/2024 15:28
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the results of the bidding package Package No. 01: Construction work: Renovating and repairing auxiliary items of Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ.
- Winning bidder: Công ty TNHH xây dựng, cơ khí và nhôm kính Hà Nga
31/07/2024 15:28
The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted the request Project contractor selection plan: Renovation and repair of auxiliary items at Thuong Long secondary school, Yen Lap district of the investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ with 3 bidding package.
31/07/2024 15:23
UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ Posted Development Investment Project Renovating and repairing auxiliary items at Thuong Long secondary school, Yen Lap district.
31/07/2024 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted 4 of the contractor selection plan, which contains 7 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has posted 6 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 6 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ is the owner of 4 contractor selection plan. In which, they self-invite 4 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor UBND XÃ THƯỢNG LONG HUYỆN YÊN LẬP TỈNH PHÚ THỌ is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register