Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND XÃ TÔ MÚA as follows:
- Has relationships with 1 project owners.
- Has relationships with 2 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND XÃ TÔ MÚA as follows:
- Has relationships with 2 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND XÃ TÔ MÚA are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 5 contractor selection plans, of which 0 were self-published, and 5 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor UBND XÃ TÔ MÚA has posted an investment and development project The road connecting Na Loi village - Suoi Khau village, To Mua commune.
09/01/2026 10:10
UBND XÃ TÔ MÚA publishes the plan Approval of the contractor selection plan for the Na Loi - Suoi Khau village inter-village road project, To Mua commune, Son La province with 9 bidding package .
09/01/2026 09:04
UBND XÃ TÔ MÚA announced the results of the bid package Process rubbish .
- Winning bidder: SON LA ENVIRONMENT AND URBAN SERVICES JOINT STOCK COMPANY
30/12/2025 16:30
UBND XÃ TÔ MÚA publishes the plan Approval of the contractor selection plan for the project: Operation of the centralized waste treatment area in To Mua commune in 2026 with 2 bidding package .
08/12/2025 15:55
Investor UBND XÃ TÔ MÚA has posted an investment and development project Operate the centralized waste treatment area in To Mua commune in 2026.
08/12/2025 15:15
UBND XÃ TÔ MÚA publishes the plan Approve the Plan for selecting contractors for bidding packages to carry out investment preparation work to serve the preparation of a feasibility study report for the project: Inter-village road Na Loi - Ban Suoi Khau, To Mua commune, Son La province with 5 bidding package .
01/12/2025 09:44
UBND XÃ TÔ MÚA announced the results of the bid package Consulting and supervision of construction survey work .
21/11/2025 09:12
UBND XÃ TÔ MÚA announced the results of the bid package Consulting survey, making feasibility study report .
- Winning bidder: CÔNG TY TNHH LIÊN PHƯƠNG TÂY BẮC
21/11/2025 09:10
UBND XÃ TÔ MÚA announced the results of the bid package Project management consultancy .
- Winning bidder: Ban quản lý dự án Đầu tư và Xây dựng huyện Vân Hồ, tỉnh Sơn La
21/11/2025 09:01
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UBND XÃ TÔ MÚA has a relationship with 2 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UBND XÃ TÔ MÚA has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects