Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors UBND xã Xuân Sơn, huyện Đô Lương as follows:
- Has relationships with 1 project owners.
- Has relationships with 0 contractor.
- Announced 13 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 19 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 15 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors UBND xã Xuân Sơn, huyện Đô Lương as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor UBND xã Xuân Sơn, huyện Đô Lương are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 0 were self-invited, and 5 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor HB 68 construction and design joint stock company has posted the results of the bidding package Package 02: The entire construction and installation part of the work of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: NETVIET JOINT STOCK COMPANY
18/06/2025 08:30
Bid solicitor HB 68 construction and design joint stock company has posted Tender Notice Package 02: The entire construction and installation part of the work of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Open bidding.
05/06/2025 17:33
The Bid solicitor UBND xã Xuân Sơn, huyện Đô Lương has posted the request Project contractor selection plan of the investor UBND xã Xuân Sơn, huyện Đô Lương with 5 bidding package.
03/06/2025 12:01
Investor UBND xã Xuân Sơn, huyện Đô Lương has posted an investment and development project Newly built multi -purpose houses, renovating 2 rows of schools and auxiliary items of Xuan Son Commune Primary School, Do Luong District.
03/06/2025 11:11
The Bid solicitor CÔNG TY TNHH LAMATA has posted the results of the bidding package Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ
25/11/2023 17:30
The Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted the results of the bidding package Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ
22/11/2023 14:20
Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Competitive Offer.
30/10/2023 10:18
Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Competitive Offer.
28/10/2023 19:44
Bid solicitor CÔNG TY TNHH LAMATA has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Open bidding.
23/10/2023 10:36
The Bid solicitor UBND xã Xuân Sơn, huyện Đô Lương has posted the request Upgrading the sidewalk system and lighting of the traffic route connecting National Highway 15A to the People's Committee of Xuan Son commune, Do Luong district (phase 2) of the investor UBND xã Xuân Sơn, huyện Đô Lương with 4 bidding package.
21/10/2023 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
UBND xã Xuân Sơn, huyện Đô Lương publishes the plan Project contractor selection plan with 5 bidding package .
03/06/2025 12:01
UBND xã Xuân Sơn, huyện Đô Lương publishes the plan Upgrading the sidewalk system and lighting of the traffic route connecting National Highway 15A to the People's Committee of Xuan Son commune, Do Luong district (phase 2) with 4 bidding package .
21/10/2023 14:33
UBND xã Xuân Sơn, huyện Đô Lương publishes the plan Construction of the secondary school's administrative building strives to meet level 2 standards in Xuan Son commune, Do Luong district with 5 bidding package .
13/10/2023 16:59
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor HB 68 construction and design joint stock company has posted the results of the bidding package Package 02: The entire construction and installation part of the work of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: NETVIET JOINT STOCK COMPANY
18/06/2025 08:30
Bid solicitor HB 68 construction and design joint stock company has posted Tender Notice Package 02: The entire construction and installation part of the work of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Open bidding.
05/06/2025 17:33
The Bid solicitor UBND xã Xuân Sơn, huyện Đô Lương has posted the request Project contractor selection plan of the investor UBND xã Xuân Sơn, huyện Đô Lương with 5 bidding package.
03/06/2025 12:01
Investor UBND xã Xuân Sơn, huyện Đô Lương has posted an investment and development project Newly built multi -purpose houses, renovating 2 rows of schools and auxiliary items of Xuan Son Commune Primary School, Do Luong District.
03/06/2025 11:11
The Bid solicitor CÔNG TY TNHH LAMATA has posted the results of the bidding package Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ
25/11/2023 17:30
The Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted the results of the bidding package Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ VÀ XÂY DỰNG ĐÔ THỊ
22/11/2023 14:20
Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Competitive Offer.
30/10/2023 10:18
Bid solicitor CÔNG TY CP XÂY DỰNG TC NGHỆ AN has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Competitive Offer.
28/10/2023 19:44
Bid solicitor CÔNG TY TNHH LAMATA has posted Tender Notice Package 01: Construction cost of the investor UBND xã Xuân Sơn, huyện Đô Lương with the form Open bidding.
23/10/2023 10:36
The Bid solicitor UBND xã Xuân Sơn, huyện Đô Lương has posted the request Upgrading the sidewalk system and lighting of the traffic route connecting National Highway 15A to the People's Committee of Xuan Son commune, Do Luong district (phase 2) of the investor UBND xã Xuân Sơn, huyện Đô Lương with 4 bidding package.
21/10/2023 14:33
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UBND xã Xuân Sơn, huyện Đô Lương has posted 4 of the contractor selection plan, which contains 19 of the bidding package. See full list here
Summary: The procuring entity UBND xã Xuân Sơn, huyện Đô Lương has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects