Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đô Lương as follows:
- Has relationships with 1 project owners.
- Has relationships with 7 contractor.
- Announced 13 investment development project, of which 12 projects have not yet announced the prequalification documents.
- Announced 187 contractor selection plans with a total of 426 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 3 packages (with 3 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 7 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 7 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 245 packages that have not fully posted the contractor selection results. Of these 241 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 51,614,043,000 VND, of which the total winning bid value is: 51,528,961,000 VND.
- The savings rate is: 0.16%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đô Lương as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 51,614,043,000 VND, in which the total winning value is: 51,528,961,000 VND.
- The savings rate is: 0.16%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân huyện Đô Lương are as follows:
- Is the investor of 13 development investment projects.
- Is the investor of 140 contractor selection plans, of which 139 were self-published, and 1 were published by other entities.
- Is the investor of 203 Tender Notices, of which 0 were self-invited, and 203 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Project contractor selection plan: Clearance, construction of resettlement infrastructure area in Dong Cua Mu area, Luu Quang hamlet, Luu Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
15/06/2025 14:45
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request 36m planning roads before Do Luong I High School (new in Yen Son commune, Do Luong district) of the investor Ủy ban nhân dân huyện Đô Lương with 8 bidding package.
26/05/2025 17:04
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Plan for selecting construction contractors: Clearing site, relocating 35kV power lines, installing transformer stations and medium voltage lines to serve the synchronous zone, Do Luong town and Dong Mui Bac area, Yen Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
19/05/2025 14:24
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Plan for selection of construction contractors: Clear site clearance, construction of resettlement infrastructure areas of cotton fields, Luu Tho hamlet, Luu Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
26/04/2025 09:25
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request The planning road 45m from the infrastructure area of the festival area to the planning road is 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
10/04/2025 13:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Package No. 01: Construction costs: Site clearance, construction of technical infrastructure to serve residential land division in Dong Dung area, Nguyen Tao hamlet, Giang Son Dong commune, Do Luong district (Giai paragraph 1) of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: CÔNG TY TNHH XDTM HOÀNG QUÂN 37
01/03/2025 15:33
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted Tender Notice Tender package No 01: Construction cost: Road planning 45m from infrastructure area in Dong Tram area to the planning road 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with the form Open bidding.
28/02/2025 14:27
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Bidding package No. 01: Construction costs: Site clearance, construction of residential land lot subdivision to auction land use rights in Cua Cho area, Dai Son commune, Do Luong district (phase 1) of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG XUÂN - NGHỆ AN
27/02/2025 17:31
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted Tender Notice Tender package No 01: Construction cost: Road planning 45m from infrastructure area in Dong Tram area to the planning road 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with the form Open bidding.
26/02/2025 09:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Consulting on surveys and zoning planning at 1/2000 scale for the southern area of Do Luong urban center, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: Công ty Cổ phần Công nghệ, Dịch vụ Tài nguyên và Môi trường
25/02/2025 11:06
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân huyện Đô Lương publishes the plan Project contractor selection plan: Clearance, construction of resettlement infrastructure area in Dong Cua Mu area, Luu Quang hamlet, Luu Son commune, Do Luong district with 2 bidding package .
15/06/2025 14:45
Ủy ban nhân dân huyện Đô Lương publishes the plan 36m planning roads before Do Luong I High School (new in Yen Son commune, Do Luong district) with 8 bidding package .
26/05/2025 17:04
Ủy ban nhân dân huyện Đô Lương publishes the plan Plan for selecting construction contractors: Clearing site, relocating 35kV power lines, installing transformer stations and medium voltage lines to serve the synchronous zone, Do Luong town and Dong Mui Bac area, Yen Son commune, Do Luong district with 2 bidding package .
19/05/2025 14:24
Ủy ban nhân dân huyện Đô Lương publishes the plan Plan for selection of construction contractors: Clear site clearance, construction of resettlement infrastructure areas of cotton fields, Luu Tho hamlet, Luu Son commune, Do Luong district with 2 bidding package .
26/04/2025 09:25
Ủy ban nhân dân huyện Đô Lương publishes the plan The planning road 45m from the infrastructure area of the festival area to the planning road is 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) with 2 bidding package .
10/04/2025 13:10
Ủy ban nhân dân huyện Đô Lương publishes the plan Building a road along the Dao river, the section from Ba Ba bridge to Trang Son commune to Mu Mu bridge in Dong Son commune, Do Luong district with 4 bidding package .
21/02/2025 16:54
Ủy ban nhân dân huyện Đô Lương publishes the plan Land use planning in 2025 Do Luong district with 1 bidding package .
14/02/2025 07:58
Ủy ban nhân dân huyện Đô Lương publishes the plan The planning road 45m from the infrastructure area of the festival area to the planning road is 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) with 2 bidding package .
10/02/2025 13:56
Ủy ban nhân dân huyện Đô Lương publishes the plan Ground leveling and some auxiliary items for Do Luong district inter-agency working headquarters with 2 bidding package .
23/01/2025 15:18
Ủy ban nhân dân huyện Đô Lương publishes the plan Relocate and upgrade the 110kV line from intersection 172E15.10 Do Luong 220kV station & 171E15.4 Do Luong 110kV station section from Xuan Son, Lac Son, Thinh Son, Van Son, Yen Son, Do Luong district; Adjusting underground 35kV line 374E15.4, 376 E15.4 from Do Luong 110kV station to position 4 with 4 bidding package .
23/01/2025 12:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Project contractor selection plan: Clearance, construction of resettlement infrastructure area in Dong Cua Mu area, Luu Quang hamlet, Luu Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
15/06/2025 14:45
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request 36m planning roads before Do Luong I High School (new in Yen Son commune, Do Luong district) of the investor Ủy ban nhân dân huyện Đô Lương with 8 bidding package.
26/05/2025 17:04
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Plan for selecting construction contractors: Clearing site, relocating 35kV power lines, installing transformer stations and medium voltage lines to serve the synchronous zone, Do Luong town and Dong Mui Bac area, Yen Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
19/05/2025 14:24
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request Plan for selection of construction contractors: Clear site clearance, construction of resettlement infrastructure areas of cotton fields, Luu Tho hamlet, Luu Son commune, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
26/04/2025 09:25
The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted the request The planning road 45m from the infrastructure area of the festival area to the planning road is 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with 2 bidding package.
10/04/2025 13:10
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Package No. 01: Construction costs: Site clearance, construction of technical infrastructure to serve residential land division in Dong Dung area, Nguyen Tao hamlet, Giang Son Dong commune, Do Luong district (Giai paragraph 1) of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: CÔNG TY TNHH XDTM HOÀNG QUÂN 37
01/03/2025 15:33
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted Tender Notice Tender package No 01: Construction cost: Road planning 45m from infrastructure area in Dong Tram area to the planning road 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with the form Open bidding.
28/02/2025 14:27
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Bidding package No. 01: Construction costs: Site clearance, construction of residential land lot subdivision to auction land use rights in Cua Cho area, Dai Son commune, Do Luong district (phase 1) of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: CÔNG TY CP ĐẦU TƯ XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG XUÂN - NGHỆ AN
27/02/2025 17:31
Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted Tender Notice Tender package No 01: Construction cost: Road planning 45m from infrastructure area in Dong Tram area to the planning road 60m, Yen Son commune, Do Luong district (from km0+670 to km0+930) of the investor Ủy ban nhân dân huyện Đô Lương with the form Open bidding.
26/02/2025 09:15
The Bid solicitor Ban quản lý dự án đầu tư xây dựng huyện Đô Lương has posted the results of the bidding package Consulting on surveys and zoning planning at 1/2000 scale for the southern area of Do Luong urban center, Do Luong district of the investor Ủy ban nhân dân huyện Đô Lương.
- Winning bidder: Công ty Cổ phần Công nghệ, Dịch vụ Tài nguyên và Môi trường
25/02/2025 11:06
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân huyện Đô Lương has posted 187 of the contractor selection plan, which contains 426 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted 3 Tender Notices in 3 bidding packages. Among these, -9 Tender Notices were self-invited, and 12 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân huyện Đô Lương has posted 7 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 7 package, canceled the bid 0 package (among the bidding packages above).
- There are 7 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân huyện Đô Lương has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân huyện Đô Lương has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects