Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đông Anh as follows:
- Has relationships with 4 contractor.
- Announced 10 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 21 contractor selection plans with a total of 197 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 173 packages that have not fully posted the contractor selection results. Of these 170 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,207,237,000 VND, of which the total winning bid value is: 8,289,000,000 VND.
- The savings rate is: 9.97%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân huyện Đông Anh as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,207,237,000 VND, in which the total winning value is: 8,289,000,000 VND.
- The savings rate is: 9.97%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 10 investment and development projects.
- As the owner of 21 Contractor selection plan in which 21 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 45 bidding packages in which 0 packages are self-invited, and 45 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Approve the project contractor selection plan: Construction of a road outside the fence connecting to North Thang Long industrial park, Dong Anh district (route 1) of the investor Ủy ban nhân dân huyện Đông Anh with 9 bidding package.
01/10/2024 17:33
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Construction of a road outside the fence connecting to North Thang Long industrial park, Dong Anh district (route 1).
01/10/2024 17:17
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request contractor selection plan for investment project to build a road from Dan Di street to Vo Nguyen Giap street, Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 27 bidding package.
29/08/2024 16:43
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request KHLCNT project Investment in construction of 02 new frontage roads along the new National Highway 3 (section from the intersection between Ring Road 3 and National Highway 3) to the end of Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 27 bidding package.
29/08/2024 16:11
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Project planning for construction of a road outside the fence connecting North Thang Long industrial park, Dong Anh district (route 3) of the investor Ủy ban nhân dân huyện Đông Anh with 9 bidding package.
15/08/2024 09:44
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Construction of a road outside the fence connecting North Thang Long industrial park, Dong Anh district (route 3).
15/08/2024 09:09
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Plan for selecting contractors for the Dong Anh district administrative center construction project of the investor Ủy ban nhân dân huyện Đông Anh with 16 bidding package.
19/06/2024 09:35
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Item Moving electricity, water supply, and communication systems to serve site clearance project implementation: Investment in building a road connecting the axis from National Highway 3 (old) to Vo Nguyen Giap road, Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 8 bidding package.
11/06/2024 14:58
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Invest in building a road connecting the axis from National Highway 3 (old) to Vo Nguyen Giap road, Dong Anh district.
11/06/2024 14:14
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Contractor selection plan for the project preparation phase Construction of the road from the National Highway 3 feeder road (new) through the People's Committee of Van Ha commune to the end of Dong Anh district (according to planning) of the investor Ủy ban nhân dân huyện Đông Anh with 7 bidding package.
27/05/2024 16:11
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân huyện Đông Anh publishes the plan Approve the project contractor selection plan: Construction of a road outside the fence connecting to North Thang Long industrial park, Dong Anh district (route 1) with 9 bidding package .
01/10/2024 17:33
Ủy ban nhân dân huyện Đông Anh publishes the plan contractor selection plan for investment project to build a road from Dan Di street to Vo Nguyen Giap street, Dong Anh district with 27 bidding package .
29/08/2024 16:43
Ủy ban nhân dân huyện Đông Anh publishes the plan KHLCNT project Investment in construction of 02 new frontage roads along the new National Highway 3 (section from the intersection between Ring Road 3 and National Highway 3) to the end of Dong Anh district with 27 bidding package .
29/08/2024 16:11
Ủy ban nhân dân huyện Đông Anh publishes the plan Project planning for construction of a road outside the fence connecting North Thang Long industrial park, Dong Anh district (route 3) with 9 bidding package .
15/08/2024 09:44
Ủy ban nhân dân huyện Đông Anh publishes the plan Plan for selecting contractors for the Dong Anh district administrative center construction project with 16 bidding package .
19/06/2024 09:35
Ủy ban nhân dân huyện Đông Anh publishes the plan Item Moving electricity, water supply, and communication systems to serve site clearance project implementation: Investment in building a road connecting the axis from National Highway 3 (old) to Vo Nguyen Giap road, Dong Anh district with 8 bidding package .
11/06/2024 14:58
Ủy ban nhân dân huyện Đông Anh publishes the plan Contractor selection plan for the project preparation phase Construction of the road from the National Highway 3 feeder road (new) through the People's Committee of Van Ha commune to the end of Dong Anh district (according to planning) with 7 bidding package .
27/05/2024 16:11
Ủy ban nhân dân huyện Đông Anh announced the results of the bid package Package 03: Consultancy on setting up construction drawing design - cost estimate .
- Winning bidder: PINK SAND CONSTRUCTION INVESTMENT JOINT STOCK COMPANY, Consulting and Technology Transfer Office for Construction, DIEN VIET CONSULTANT, CONSTRUCTION AND SERVICE JOINT STOCK COMPANY, AA ELECTROMECHANICAL AND CONSTRUCTION JOINT STOCK COMPANY
04/03/2024 15:22
Ủy ban nhân dân huyện Đông Anh publishes the plan Plan for selecting contractors for the project preparation phase of building a route from Hanoi - Lao Cai railway to Dong Anh Industrial Park with 7 bidding package .
31/10/2023 10:36
Ủy ban nhân dân huyện Đông Anh publishes the plan Contractor selection plan for project preparation phase Investment in construction of route LK54 from the Resettlement area to serve compensation and site clearance for Nhat Tan bridge, extended road 5 and urban development projects market to LK53 street with 7 bidding package .
31/10/2023 10:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Approve the project contractor selection plan: Construction of a road outside the fence connecting to North Thang Long industrial park, Dong Anh district (route 1) of the investor Ủy ban nhân dân huyện Đông Anh with 9 bidding package.
01/10/2024 17:33
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Construction of a road outside the fence connecting to North Thang Long industrial park, Dong Anh district (route 1).
01/10/2024 17:17
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request contractor selection plan for investment project to build a road from Dan Di street to Vo Nguyen Giap street, Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 27 bidding package.
29/08/2024 16:43
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request KHLCNT project Investment in construction of 02 new frontage roads along the new National Highway 3 (section from the intersection between Ring Road 3 and National Highway 3) to the end of Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 27 bidding package.
29/08/2024 16:11
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Project planning for construction of a road outside the fence connecting North Thang Long industrial park, Dong Anh district (route 3) of the investor Ủy ban nhân dân huyện Đông Anh with 9 bidding package.
15/08/2024 09:44
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Construction of a road outside the fence connecting North Thang Long industrial park, Dong Anh district (route 3).
15/08/2024 09:09
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Plan for selecting contractors for the Dong Anh district administrative center construction project of the investor Ủy ban nhân dân huyện Đông Anh with 16 bidding package.
19/06/2024 09:35
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Item Moving electricity, water supply, and communication systems to serve site clearance project implementation: Investment in building a road connecting the axis from National Highway 3 (old) to Vo Nguyen Giap road, Dong Anh district of the investor Ủy ban nhân dân huyện Đông Anh with 8 bidding package.
11/06/2024 14:58
Ủy ban nhân dân huyện Đông Anh Posted Development Investment Project Invest in building a road connecting the axis from National Highway 3 (old) to Vo Nguyen Giap road, Dong Anh district.
11/06/2024 14:14
The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted the request Contractor selection plan for the project preparation phase Construction of the road from the National Highway 3 feeder road (new) through the People's Committee of Van Ha commune to the end of Dong Anh district (according to planning) of the investor Ủy ban nhân dân huyện Đông Anh with 7 bidding package.
27/05/2024 16:11
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân huyện Đông Anh has posted 21 of the contractor selection plan, which contains 197 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân huyện Đông Anh has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân huyện Đông Anh has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Anh has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Anh is the owner of 21 contractor selection plan. In which, they self-invite 21 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ủy ban nhân dân huyện Đông Anh is an investor with 54 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân huyện Đông Anh is the investor of 10 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code