Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân phường Cẩm Tây as follows:
- Has relationships with 11 contractor.
- Announced 15 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 26 contractor selection plans with a total of 67 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 27 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 23 packages with results that do not have tender notice or prequalification notice.
- There are 36 packages that have not fully posted the contractor selection results. Of these 33 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 8,856,284,789 VND, of which the total winning bid value is: 8,760,884,500 VND.
- The savings rate is: 1.08%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân phường Cẩm Tây as follows:
- Has relationships with 11 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 8,856,284,789 VND, in which the total winning value is: 8,760,884,500 VND.
- The savings rate is: 1.08%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 15 investment and development projects.
- As the owner of 19 Contractor selection plan in which 18 Contractor selection plan is self-published, and 1 Contractor selection plan is posted by other units.
- Being the investor of 5 bidding packages in which 3 packages are self-invited, and 2 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package 02: Construction project management consulting of the investor Ủy ban nhân dân phường Cẩm Tây.
29/12/2023 16:06
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 03: Construction supervision consultancy of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: CAM PHA CONSTRUCTION CONSULTANT LIMITED COMPANY
29/12/2023 15:55
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 01: Construction works of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: DHN CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
29/12/2023 15:30
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 3 bidding package.
04/12/2023 10:49
Ủy ban nhân dân phường Cẩm Tây Posted Development Investment Project New construction of wastewater drainage and soil barrier road in group 3 of Le Loi area, Cam Tay ward, Cam Pha city..
04/12/2023 10:10
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 3 bidding package.
19/10/2023 15:22
Ủy ban nhân dân phường Cẩm Tây Posted Development Investment Project New construction of wastewater drainage and soil barrier road in group 3 of Le Loi area, Cam Tay ward, Cam Pha city..
19/10/2023 10:10
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Project contractor selection plan: Dredging the drainage ditch of group 4 in Minh Khai area and dredging the drainage ditch behind the headquarters of the ward People's Committee (group 1, Le Hong Phong area), Cam Tay ward, Cam Pha city. of the investor Ủy ban nhân dân phường Cẩm Tây with 1 bidding package.
26/10/2022 14:45
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 01: Construction works of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG DHN
04/07/2022 14:58
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Construction contractor selection plan: Dredging, clearing the drainage ditches of groups 2,3,5 in Phan Dinh Phung area, group 5 in Le Hong Phong area and the sewer line from the cultural house of Doc Thong area to the fork on the way up wharf 52, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 1 bidding package.
04/07/2022 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package 02: Construction project management consulting .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN QUY HOẠCH VÀ THIẾT KẾ XÂY DỰNG CẨM PHẢ
29/12/2023 16:06
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package No. 03: Construction supervision consultancy .
- Winning bidder: CAM PHA CONSTRUCTION CONSULTANT LIMITED COMPANY
29/12/2023 15:55
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: DHN CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
29/12/2023 15:30
Ủy ban nhân dân phường Cẩm Tây publishes the plan Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city with 3 bidding package .
04/12/2023 10:49
Ủy ban nhân dân phường Cẩm Tây publishes the plan Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city with 3 bidding package .
19/10/2023 15:22
Ủy ban nhân dân phường Cẩm Tây publishes the plan Project contractor selection plan: Dredging the drainage ditch of group 4 in Minh Khai area and dredging the drainage ditch behind the headquarters of the ward People's Committee (group 1, Le Hong Phong area), Cam Tay ward, Cam Pha city. with 1 bidding package .
26/10/2022 14:45
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package No. 01: Construction works .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG DHN
04/07/2022 14:58
Ủy ban nhân dân phường Cẩm Tây publishes the plan Construction contractor selection plan: Dredging, clearing the drainage ditches of groups 2,3,5 in Phan Dinh Phung area, group 5 in Le Hong Phong area and the sewer line from the cultural house of Doc Thong area to the fork on the way up wharf 52, Cam Tay ward, Cam Pha city with 1 bidding package .
04/07/2022 14:55
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package 02: Construction supervision consultant for the project "Upgrading and renovating the drainage system, concrete road surface (Road to the original multi-group 3 and 4, 7 Thong Nhat area), Cam ward. West, Cam Pha City” .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIA HÂN QN
01/07/2022 11:01
Ủy ban nhân dân phường Cẩm Tây announced the results of the bid package Package 04: Consulting and evaluation of bids for construction and installation bidding package for the project "Upgrading and renovating the drainage system, concrete road surface (Road to the original multi-group 3 and 4, 7 Thong Nhat area), ward Cam Tay, Cam Pha City” .
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG DHN
01/07/2022 10:52
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package 02: Construction project management consulting of the investor Ủy ban nhân dân phường Cẩm Tây.
29/12/2023 16:06
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 03: Construction supervision consultancy of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: CAM PHA CONSTRUCTION CONSULTANT LIMITED COMPANY
29/12/2023 15:55
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 01: Construction works of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: DHN CONSTRUCTION INVESTMENT JOINT STOCK COMPANY
29/12/2023 15:30
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 3 bidding package.
04/12/2023 10:49
Ủy ban nhân dân phường Cẩm Tây Posted Development Investment Project New construction of wastewater drainage and soil barrier road in group 3 of Le Loi area, Cam Tay ward, Cam Pha city..
04/12/2023 10:10
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Plan for selecting contractors for construction investment projects: New construction of wastewater sewers and soil barrier roads in group 3 of Le Loi area, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 3 bidding package.
19/10/2023 15:22
Ủy ban nhân dân phường Cẩm Tây Posted Development Investment Project New construction of wastewater drainage and soil barrier road in group 3 of Le Loi area, Cam Tay ward, Cam Pha city..
19/10/2023 10:10
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Project contractor selection plan: Dredging the drainage ditch of group 4 in Minh Khai area and dredging the drainage ditch behind the headquarters of the ward People's Committee (group 1, Le Hong Phong area), Cam Tay ward, Cam Pha city. of the investor Ủy ban nhân dân phường Cẩm Tây with 1 bidding package.
26/10/2022 14:45
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the results of the bidding package Package No. 01: Construction works of the investor Ủy ban nhân dân phường Cẩm Tây.
- Winning bidder: CÔNG TY CỔ PHẦN ĐẦU TƯ XÂY DỰNG DHN
04/07/2022 14:58
The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted the request Construction contractor selection plan: Dredging, clearing the drainage ditches of groups 2,3,5 in Phan Dinh Phung area, group 5 in Le Hong Phong area and the sewer line from the cultural house of Doc Thong area to the fork on the way up wharf 52, Cam Tay ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Tây with 1 bidding package.
04/07/2022 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân phường Cẩm Tây has posted 26 of the contractor selection plan, which contains 67 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted 7 Tender Notice in the 7 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has posted 27 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 27 package, canceled the bid 0 package (among the bidding packages above).
- There are 23 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Tây has a relationship with 11 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Cẩm Tây has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Cẩm Tây is the investor of 5 package, of which 3 package is self-invited, other units invite bid 2 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Cẩm Tây is the owner of 19 contractor selection plan. In which, they self-invite 18 of contractor selection plan, other units invite bids of 1 of contractor selection plan.
Summary: Investor Ủy ban nhân dân phường Cẩm Tây is an investor with 12 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân phường Cẩm Tây is the investor of 15 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code