Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân phường Cẩm Thủy as follows:
- Has relationships with 3 project owners.
- Has relationships with 15 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 43 contractor selection plans with a total of 110 bidding packages, of which 9 prequalification documents have not found the investment project.
- Has invited bids for 11 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 6 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 52 packages that have not fully posted the contractor selection results. Of these 49 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.17 contractors.
- Breakdown by bidding field: Goods 9.09%, Construction 90.91%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 13,405,728,000 VND, of which the total winning bid value is: 13,187,099,308 VND.
- The savings rate is: 1.63%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân phường Cẩm Thủy as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.17 contractors.
- Proportion of bidding fields: Goods 9.09%, Construction 90.91%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 13,405,728,000 VND, in which the total winning value is: 13,187,099,308 VND.
- The savings rate is: 1.63%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân phường Cẩm Thủy are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 17 contractor selection plans, of which 16 were self-published, and 1 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted Tender Notice Package 01: Construction and installation of upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with the form National competitive bidding.
13/12/2021 22:47
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan for selecting contractors for construction investment projects: Upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 5 bidding package.
13/12/2021 21:30
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Upgrading the embankment system at the cultural house of Hai Gieng 1 area, the cultural house of Hai Gieng 2 area, Cam Thuy ward, Cam Pha city.
13/12/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan to select the contractor for the construction investment project of the dredging of the drainage stream from Group 7 of Hai Gieng 2 area (from Mr. Nguyen Van Huu's household) to Group 6 of Dam 2 (Cultural house of Dam 2 area) ), Cam Thuy ward, Cam Pha city. of the investor Ủy ban nhân dân phường Cẩm Thủy with 1 bidding package.
12/07/2021 08:47
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Dredging the drainage stream from Group 7 of Hai Gieng 2 area (from Mr. Nguyen Van Huu's household) to Group 6 of Dam Nuoc 2 area (Cultural house of Dam Nuoc 2), Cam Thuy ward, Cam Pha city..
12/07/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan to select contractor for construction investment project "Dredging the drainage stream from Thanh Nien bridge to cultural house in Hai Gieng 1 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
08/07/2021 15:12
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Dredging the drainage stream from Thanh Nien bridge to the cultural house of Hai Gieng 1 area, Cam Thuy ward, Cam Pha city..
08/07/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan for selecting contractors for the construction investment project "Upgrading, renovating the road and renewing the sewers of group 2, Dam 1, Cam Thuy ward, Cam Pha city" of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 09:18
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan to select contractor for construction investment project Upgrading road surface and building drainage system for route group 4, 5, zone 4B, Cam Trung ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 09:06
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan for selecting contractors for the construction investment project "Upgrading, renovating the road and renewing the drainage system of Group 7 of the Dam area 2 sections from the junction of EC road to the contiguous bridge over the stream in Cam Thach ward, Cam Thuy ward, Cam Pha city” of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 08:40
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân phường Cẩm Thủy announced the results of the bidding package Package 01: Construction and installation of upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city with 1 participating contractors .
24/12/2021 09:08
Ủy ban nhân dân phường Cẩm Thủy publishes Tender Notice Package 01: Construction and installation of upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city in the form National competitive bidding .
13/12/2021 22:47
Ủy ban nhân dân phường Cẩm Thủy publishes the plan Plan for selecting contractors for construction investment projects: Upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city with 5 bidding package .
13/12/2021 21:30
Ủy ban nhân dân phường Cẩm Thủy publishes the plan Plan for selection of contractors for construction projects: Renovating and repairing office rooms, renewing garages + flower beds, painting office buildings in Cam Thuy ward, Cam Pha city with 3 bidding package .
18/09/2021 09:22
Ủy ban nhân dân phường Cẩm Thủy publishes the plan The contractor selection plan in the investment preparation stage of the construction investment project: Renovating and repairing the office, renewing the garage + flowerpot, painting the office office in Cam Thuy ward, Cam Pha city with 1 bidding package .
17/08/2021 11:13
Ủy ban nhân dân phường Cẩm Thủy publishes the plan The plan to select the contractor for the construction investment project of the dredging of the drainage stream from Group 7 of Hai Gieng 2 area (from Mr. Nguyen Van Huu's household) to Group 6 of Dam 2 (Cultural house of Dam 2 area) ), Cam Thuy ward, Cam Pha city. with 1 bidding package .
12/07/2021 08:47
Ủy ban nhân dân phường Cẩm Thủy publishes the plan Plan to select contractor for construction investment project "Dredging the drainage stream from Thanh Nien bridge to cultural house in Hai Gieng 1 area, Cam Thuy ward, Cam Pha city with 2 bidding package .
08/07/2021 15:12
Ủy ban nhân dân phường Cẩm Thủy announced the results of the bidding package Tender package No 01: Construction works with 1 participating contractors .
24/06/2021 21:15
Ủy ban nhân dân phường Cẩm Thủy publishes Tender Notice Tender package No 01: Construction works in the form National competitive bidding .
14/06/2021 21:11
Ủy ban nhân dân phường Cẩm Thủy publishes the plan The plan for selecting contractors for the construction investment project "Upgrading, renovating the road and renewing the sewers of group 2, Dam 1, Cam Thuy ward, Cam Pha city" with 2 bidding package .
04/06/2021 09:18
The data sheet has been partially hidden, to see the full information please Login or Register
Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted Tender Notice Package 01: Construction and installation of upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with the form National competitive bidding.
13/12/2021 22:47
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan for selecting contractors for construction investment projects: Upgrading the earth embankment system at the cultural house in Hai Gieng 1 area, the cultural house in Hai Gieng 2 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 5 bidding package.
13/12/2021 21:30
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Upgrading the embankment system at the cultural house of Hai Gieng 1 area, the cultural house of Hai Gieng 2 area, Cam Thuy ward, Cam Pha city.
13/12/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan to select the contractor for the construction investment project of the dredging of the drainage stream from Group 7 of Hai Gieng 2 area (from Mr. Nguyen Van Huu's household) to Group 6 of Dam 2 (Cultural house of Dam 2 area) ), Cam Thuy ward, Cam Pha city. of the investor Ủy ban nhân dân phường Cẩm Thủy with 1 bidding package.
12/07/2021 08:47
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Dredging the drainage stream from Group 7 of Hai Gieng 2 area (from Mr. Nguyen Van Huu's household) to Group 6 of Dam Nuoc 2 area (Cultural house of Dam Nuoc 2), Cam Thuy ward, Cam Pha city..
12/07/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan to select contractor for construction investment project "Dredging the drainage stream from Thanh Nien bridge to cultural house in Hai Gieng 1 area, Cam Thuy ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
08/07/2021 15:12
Investor Ủy ban nhân dân phường Cẩm Thủy has posted an investment and development project Dredging the drainage stream from Thanh Nien bridge to the cultural house of Hai Gieng 1 area, Cam Thuy ward, Cam Pha city..
08/07/2021 07:00
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan for selecting contractors for the construction investment project "Upgrading, renovating the road and renewing the sewers of group 2, Dam 1, Cam Thuy ward, Cam Pha city" of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 09:18
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request Plan to select contractor for construction investment project Upgrading road surface and building drainage system for route group 4, 5, zone 4B, Cam Trung ward, Cam Pha city of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 09:06
The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted the request The plan for selecting contractors for the construction investment project "Upgrading, renovating the road and renewing the drainage system of Group 7 of the Dam area 2 sections from the junction of EC road to the contiguous bridge over the stream in Cam Thach ward, Cam Thuy ward, Cam Pha city” of the investor Ủy ban nhân dân phường Cẩm Thủy with 2 bidding package.
04/06/2021 08:40
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân phường Cẩm Thủy has posted 43 of the contractor selection plan, which contains 110 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has posted 11 Tender Notices in 11 bidding packages. Among these, 3 Tender Notices were self-invited, and 8 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân phường Cẩm Thủy has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân phường Cẩm Thủy has a relationship with 4 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects