Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH as follows:
- Has relationships with 1 project owners.
- Has relationships with 21 contractor.
- Announced 14 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 66 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 38 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 16 packages that have not fully posted the contractor selection results. Of these 16 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,910,452,000 VND, of which the total winning bid value is: 4,910,452,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH as follows:
- Has relationships with 21 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,910,452,000 VND, in which the total winning value is: 4,910,452,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH are as follows:
- Is the investor of 14 development investment projects.
- Is the investor of 15 contractor selection plans, of which 15 were self-published, and 0 were published by other entities.
- Is the investor of 16 Tender Notices, of which 0 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package 09: Consulting on supervision of construction package 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY TNHH PCCC CỬU LONG
04/07/2025 14:02
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package No. 07: Work construction part + Equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: TRUNG TIN INVESTMENT DEVELOPMENT AND CONSTRUCTION JOINT STOCK COMPANY
27/06/2025 14:34
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA has posted the results of the bidding package Package 06: Construction cost (additional part) of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: Công ty Cổ phần Đầu tư Xây dựng và Thương mại Đại Ngàn
09/06/2025 16:16
Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA has posted Tender Notice Package 06: Construction cost (additional part) of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
23/05/2025 14:15
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted the request Adjusting and supplementing the project contractor selection plan: Building a drainage ditch along Nguyen Duc Canh Street (the section from Ly Thuong Kiet Street to Nguyen Thi Minh Khai Street) and connected ditches, Hung Binh ward, Vinh city of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with 3 bidding package.
08/05/2025 14:40
Investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted an investment and development project Adjusting and supplementing the project contractor selection plan: Building a drainage ditch along Nguyen Duc Canh Street (the section from Ly Thuong Kiet Street to Nguyen Thi Minh Khai Street) and connected ditches, Hung Binh ward, Vinh city.
08/05/2025 14:14
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
07/05/2025 21:05
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted the results of the bidding package Package 03: Construction supervision consultancy package No. 02 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG 189
06/05/2025 15:54
The Bid solicitor CÔNG TY CP ĐẦU TƯ VÀ PHÁT TRIỂN ĐẶNG TRUNG has posted the results of the bidding package Package 02: Construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG 879
05/05/2025 07:13
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
04/05/2025 14:17
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH publishes the plan Adjusting and supplementing the project contractor selection plan: Building a drainage ditch along Nguyen Duc Canh Street (the section from Ly Thuong Kiet Street to Nguyen Thi Minh Khai Street) and connected ditches, Hung Binh ward, Vinh city with 3 bidding package .
08/05/2025 14:40
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Package 03: Construction supervision consultancy package No. 02 .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG 189
06/05/2025 15:54
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Package 15: Consulting on evaluation of Bidding Documents, results of LCNT Package 09 .
- Winning bidder: CÔNG TY TNHH TVTK VÀ XD NHẬT NAM
14/04/2025 09:44
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Package 13: Consulting on evaluation of Bidding Documents, results of LCNT Package 08 .
- Winning bidder: CÔNG TY TNHH TVTK VÀ XD NHẬT NAM
14/04/2025 09:42
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Package 11: Consulting on evaluation of Bidding Documents, results of LCNT Package 07 .
- Winning bidder: CÔNG TY TNHH TVTK VÀ XD NHẬT NAM
14/04/2025 09:39
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Bidding package 14: Consulting on making bidding and evaluating Bids package 09 .
- Winning bidder: Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt
14/04/2025 09:30
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Bidding package 12: Consulting on making bidding and evaluating Bid Bids package 08 .
- Winning bidder: Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt
14/04/2025 09:29
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Bidding package No. 10: Consultancy on preparation of Bid Documents and evaluation of Bid Package No. 07 .
- Winning bidder: Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt
14/04/2025 09:27
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH announced the results of the bid package Package 04: Project Management Consulting .
- Winning bidder: CÔNG TY CP XÂY DỰNG ĐỨC ANH NGHỆ AN
09/04/2025 20:44
ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH publishes the plan KHLCNT works: Hung Binh Primary School (phase 2), Hung Binh Ward with 11 bidding package .
28/03/2025 11:29
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package 09: Consulting on supervision of construction package 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY TNHH PCCC CỬU LONG
04/07/2025 14:02
The Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted the results of the bidding package Package No. 07: Work construction part + Equipment of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: TRUNG TIN INVESTMENT DEVELOPMENT AND CONSTRUCTION JOINT STOCK COMPANY
27/06/2025 14:34
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA has posted the results of the bidding package Package 06: Construction cost (additional part) of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: Công ty Cổ phần Đầu tư Xây dựng và Thương mại Đại Ngàn
09/06/2025 16:16
Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG SỐ 9-NA has posted Tender Notice Package 06: Construction cost (additional part) of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
23/05/2025 14:15
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted the request Adjusting and supplementing the project contractor selection plan: Building a drainage ditch along Nguyen Duc Canh Street (the section from Ly Thuong Kiet Street to Nguyen Thi Minh Khai Street) and connected ditches, Hung Binh ward, Vinh city of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with 3 bidding package.
08/05/2025 14:40
Investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted an investment and development project Adjusting and supplementing the project contractor selection plan: Building a drainage ditch along Nguyen Duc Canh Street (the section from Ly Thuong Kiet Street to Nguyen Thi Minh Khai Street) and connected ditches, Hung Binh ward, Vinh city.
08/05/2025 14:14
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
07/05/2025 21:05
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted the results of the bidding package Package 03: Construction supervision consultancy package No. 02 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG 189
06/05/2025 15:54
The Bid solicitor CÔNG TY CP ĐẦU TƯ VÀ PHÁT TRIỂN ĐẶNG TRUNG has posted the results of the bidding package Package 02: Construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG 879
05/05/2025 07:13
Bid solicitor Công ty TNHH tư vấn và xây dựng Đức Tài Tâm Đạt has posted Tender Notice Tender package No 09: Construction supervision consultancy package No. 07 of the investor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH with the form Open bidding.
04/05/2025 14:17
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted 15 of the contractor selection plan, which contains 66 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has posted 38 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 38 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has a relationship with 21 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN PHƯỜNG HƯNG BÌNH has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects