Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG I as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 7 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 6 contractor selection plans with a total of 22 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 15 packages that have not fully posted the contractor selection results. Of these 13 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,395,106,752 VND, of which the total winning bid value is: 1,395,106,752 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG I as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,395,106,752 VND, in which the total winning value is: 1,395,106,752 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN PHƯỜNG I are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 6 contractor selection plans, of which 6 were self-published, and 0 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the results of the bidding package Package number 01: Construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG I.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG - THƯƠNG MẠI ĐÔ AN TRÍ
13/06/2025 08:33
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Install traffic lights at the intersection of Nguyen Cong Tru - Phan Boi Chau of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 5 bidding package.
30/05/2025 10:45
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Install traffic lights at the intersection of Nguyen Cong Tru - Phan Boi Chau.
30/05/2025 10:10
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the results of the bidding package Package No. 1: Full construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG I.
- Winning bidder: VU TUAN MINH CONSTRUCTION COMPANY LIMITED
14/05/2025 15:07
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Upgrade, build road surface and sidewalks around Thanh Nien Park, Ward 1 of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 5 bidding package.
28/04/2025 14:03
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Upgrade, build road surface and sidewalks around Thanh Nien Park, Ward 1.
28/04/2025 13:13
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG has posted Tender Notice Tender package No 01: All construction costs of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with the form Open bidding.
08/11/2024 09:07
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Alley 80 Dinh Tien Hoang, Residential Group 2 of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 1 bidding package.
06/11/2024 15:31
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Alley 80 Dinh Tien Hoang, Residential Group 2.
06/11/2024 15:15
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG has posted Tender Notice Tender package No 01: All construction costs of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with the form Open bidding.
18/10/2024 16:04
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN PHƯỜNG I announced the results of the bid package Package number 01: Construction cost .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG - THƯƠNG MẠI ĐÔ AN TRÍ
13/06/2025 08:33
ỦY BAN NHÂN DÂN PHƯỜNG I publishes the plan Install traffic lights at the intersection of Nguyen Cong Tru - Phan Boi Chau with 5 bidding package .
30/05/2025 10:45
ỦY BAN NHÂN DÂN PHƯỜNG I announced the results of the bid package Package No. 1: Full construction cost .
- Winning bidder: VU TUAN MINH CONSTRUCTION COMPANY LIMITED
14/05/2025 15:07
ỦY BAN NHÂN DÂN PHƯỜNG I publishes the plan Upgrade, build road surface and sidewalks around Thanh Nien Park, Ward 1 with 5 bidding package .
28/04/2025 14:03
ỦY BAN NHÂN DÂN PHƯỜNG I publishes the plan Alley 80 Dinh Tien Hoang, Residential Group 2 with 1 bidding package .
06/11/2024 15:31
ỦY BAN NHÂN DÂN PHƯỜNG I publishes the plan Alley 80 Dinh Tien Hoang, Residential Group 2 with 1 bidding package .
16/10/2024 10:28
ỦY BAN NHÂN DÂN PHƯỜNG I announced the results of the bid package Package 02: Project management expenses .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG
28/08/2024 08:45
ỦY BAN NHÂN DÂN PHƯỜNG I announced the results of the bid package Package No. 04: Costs for appraisal of bidding documents and appraisal of contractor selection results .
- Winning bidder: Công ty TNHH Tư Vấn Xây Dựng Nam Hoàng Long
28/08/2024 08:43
ỦY BAN NHÂN DÂN PHƯỜNG I announced the results of the bid package Package 03: Expenses for preparation of bidding documents and evaluation of bids .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG
28/08/2024 08:40
ỦY BAN NHÂN DÂN PHƯỜNG I publishes the plan Upgrading and renovating Hai Ba Trung street with 5 bidding package .
23/05/2024 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the results of the bidding package Package number 01: Construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG I.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG - THƯƠNG MẠI ĐÔ AN TRÍ
13/06/2025 08:33
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Install traffic lights at the intersection of Nguyen Cong Tru - Phan Boi Chau of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 5 bidding package.
30/05/2025 10:45
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Install traffic lights at the intersection of Nguyen Cong Tru - Phan Boi Chau.
30/05/2025 10:10
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the results of the bidding package Package No. 1: Full construction cost of the investor ỦY BAN NHÂN DÂN PHƯỜNG I.
- Winning bidder: VU TUAN MINH CONSTRUCTION COMPANY LIMITED
14/05/2025 15:07
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Upgrade, build road surface and sidewalks around Thanh Nien Park, Ward 1 of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 5 bidding package.
28/04/2025 14:03
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Upgrade, build road surface and sidewalks around Thanh Nien Park, Ward 1.
28/04/2025 13:13
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG has posted Tender Notice Tender package No 01: All construction costs of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with the form Open bidding.
08/11/2024 09:07
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted the request Alley 80 Dinh Tien Hoang, Residential Group 2 of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with 1 bidding package.
06/11/2024 15:31
Investor ỦY BAN NHÂN DÂN PHƯỜNG I has posted an investment and development project Alley 80 Dinh Tien Hoang, Residential Group 2.
06/11/2024 15:15
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG SÔNG HỒNG has posted Tender Notice Tender package No 01: All construction costs of the investor ỦY BAN NHÂN DÂN PHƯỜNG I with the form Open bidding.
18/10/2024 16:04
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN PHƯỜNG I has posted 6 of the contractor selection plan, which contains 22 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG I has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN PHƯỜNG I has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects