Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ as follows:
- Has relationships with 1 project owners.
- Has relationships with 26 contractor.
- Announced 5 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 49 contractor selection plans with a total of 70 bidding packages, of which 44 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 66 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 61 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 5 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.60 contractors.
- Breakdown by bidding field: Goods 16.67%, Construction 66.67%, Consultancy 0%, Non-consultancy 16.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 14,442,324,624 VND, of which the total winning bid value is: 14,323,086,556 VND.
- The savings rate is: 0.83%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ as follows:
- Has relationships with 26 contractor.
- The average number of contractors participating in each bidding package is: 1.60 contractors.
- Proportion of bidding fields: Goods 16.67%, Construction 66.67%, Consulting 0%, Non-consulting 16.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 14,442,324,624 VND, in which the total winning value is: 14,323,086,556 VND.
- The savings rate is: 0.83%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 49 contractor selection plans, of which 49 were self-published, and 0 were published by other entities.
- Is the investor of 6 Tender Notices, of which 6 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request The main thing to select the construction contractor: Dredging Bamboo Lake and the drainage ditch from Tre Mai Lake to QL18, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 5 bidding package.
01/08/2025 16:58
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan Package No. 05: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
17/04/2025 10:30
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request Bidding selection plan Package No. 05: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 1 bidding package.
17/04/2025 10:26
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 16:54
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan package No. 03: Construction audit: Repair and renovation of Group 4 Road 4 Khu Khe, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:50
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Contractor Selection Plan Package No. 03: Construction Audit: Repair and renovate the route of Group 3, Khu Khe, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:44
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding contractor Package No. 03: Construction Audit: Repair and renovation of Le Hoan Street, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:40
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan Package 03: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:35
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Plan for contractor selection Package No. 03: Construction audit: Repairing and renovating the route of Group 5 Khu Khe, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:30
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 1 bidding package.
16/04/2025 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ publishes the plan The main thing to select the construction contractor: Dredging Bamboo Lake and the drainage ditch from Tre Mai Lake to QL18, Nam Khe Ward, Uong Bi City with 5 bidding package .
01/08/2025 16:58
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Bidding selection plan Package No. 05: Construction audit: Repair and renovation .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
17/04/2025 10:30
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ publishes the plan Bidding selection plan Package No. 05: Construction audit: Repair and renovation with 1 bidding package .
17/04/2025 10:26
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 16:54
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Bidding selection plan package No. 03: Construction audit: Repair and renovation of Group 4 Road 4 Khu Khe, Uong Bi City .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:50
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Contractor Selection Plan Package No. 03: Construction Audit: Repair and renovate the route of Group 3, Khu Khe, Uong Bi City .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:44
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Bidding contractor Package No. 03: Construction Audit: Repair and renovation of Le Hoan Street, Nam Khe Ward, Uong Bi City .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:40
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Bidding selection plan Package 03: Construction audit: Repair and renovation .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:35
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ announced the results of the bid package Plan for contractor selection Package No. 03: Construction audit: Repairing and renovating the route of Group 5 Khu Khe, Nam Khe Ward, Uong Bi City .
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:30
ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ publishes the plan Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City with 1 bidding package .
16/04/2025 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request The main thing to select the construction contractor: Dredging Bamboo Lake and the drainage ditch from Tre Mai Lake to QL18, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 5 bidding package.
01/08/2025 16:58
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan Package No. 05: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
17/04/2025 10:30
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request Bidding selection plan Package No. 05: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 1 bidding package.
17/04/2025 10:26
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 16:54
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan package No. 03: Construction audit: Repair and renovation of Group 4 Road 4 Khu Khe, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:50
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Contractor Selection Plan Package No. 03: Construction Audit: Repair and renovate the route of Group 3, Khu Khe, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:44
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding contractor Package No. 03: Construction Audit: Repair and renovation of Le Hoan Street, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:40
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Bidding selection plan Package 03: Construction audit: Repair and renovation of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:35
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the results of the bidding package Plan for contractor selection Package No. 03: Construction audit: Repairing and renovating the route of Group 5 Khu Khe, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ.
- Winning bidder: AASC AUDITING FIRM COMPANY LIMITED
16/04/2025 15:30
The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted the request Bidding selection plan package 04: EXPORT AUTIFUL: Dredging the ditch at Group 1 South Trung, Nam Khe Ward, Uong Bi City of the investor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ with 1 bidding package.
16/04/2025 11:10
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted 49 of the contractor selection plan, which contains 70 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted 6 Tender Notices in 5 bidding packages. Among these, 6 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has posted 66 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 66 package, canceled the bid 0 package (among the bidding packages above).
- There are 61 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has a relationship with 26 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN PHƯỜNG NAM KHÊ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects