Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân phường Vân Giang as follows:
- Has relationships with 1 project owners.
- Has relationships with 20 contractor.
- Announced 12 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 27 contractor selection plans with a total of 57 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 36 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 30 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 21 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 16,991,612,683 VND, of which the total winning bid value is: 16,659,953,255 VND.
- The savings rate is: 1.95%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân phường Vân Giang as follows:
- Has relationships with 20 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 16,991,612,683 VND, in which the total winning value is: 16,659,953,255 VND.
- The savings rate is: 1.95%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân phường Vân Giang are as follows:
- Is the investor of 12 development investment projects.
- Is the investor of 26 contractor selection plans, of which 26 were self-published, and 0 were published by other entities.
- Is the investor of 7 Tender Notices, of which 7 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Survey package, Economic and technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ DỊCH VỤ QUANG MINH
26/06/2025 14:55
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request Decision on approving the plan of contractor selection of bidding package, making economic technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
26/06/2025 14:52
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Bidding for project management consultancy: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐỨC VIÊN
25/06/2025 15:19
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request The decision to approve the plan to select contractors for project management consultancy package: Renovated road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham Street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
25/06/2025 15:16
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
23/05/2025 15:24
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request Decision approving the plan to select contractors to repair road surface, sidewalks, traffic safety of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
23/05/2025 15:21
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package No. 04: Construction Supervision Consultant of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG AN PHÁT NINH BÌNH
10/04/2025 11:26
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 03: Construction and installation of works of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH ALPHA NINH BÌNH
05/04/2025 15:09
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 2: Construction supervision consultancy: Installing decorative lights of Bach Bach Lake Van Giang of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SƠN NGUYỄN
04/04/2025 10:48
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 1: Construction and installation of works: Installing decorative lights of Bach Bach Lake Van Giang of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
04/04/2025 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Survey package, Economic and technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ DỊCH VỤ QUANG MINH
26/06/2025 14:55
Uỷ ban nhân dân phường Vân Giang publishes the plan Decision on approving the plan of contractor selection of bidding package, making economic technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward with 1 bidding package .
26/06/2025 14:52
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Bidding for project management consultancy: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐỨC VIÊN
25/06/2025 15:19
Uỷ ban nhân dân phường Vân Giang publishes the plan The decision to approve the plan to select contractors for project management consultancy package: Renovated road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham Street to Hoang Dieu Street), Van Giang Ward with 1 bidding package .
25/06/2025 15:16
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
23/05/2025 15:24
Uỷ ban nhân dân phường Vân Giang publishes the plan Decision approving the plan to select contractors to repair road surface, sidewalks, traffic safety with 1 bidding package .
23/05/2025 15:21
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Package No. 04: Construction Supervision Consultant .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG AN PHÁT NINH BÌNH
10/04/2025 11:26
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Package 03: Construction and installation of works .
- Winning bidder: CÔNG TY TNHH ALPHA NINH BÌNH
05/04/2025 15:09
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Package 2: Construction supervision consultancy: Installing decorative lights of Bach Bach Lake Van Giang .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SƠN NGUYỄN
04/04/2025 10:48
Uỷ ban nhân dân phường Vân Giang announced the results of the bid package Package 1: Construction and installation of works: Installing decorative lights of Bach Bach Lake Van Giang .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
04/04/2025 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Survey package, Economic and technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG VÀ DỊCH VỤ QUANG MINH
26/06/2025 14:55
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request Decision on approving the plan of contractor selection of bidding package, making economic technical reports: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
26/06/2025 14:52
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Bidding for project management consultancy: Renovating road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI ĐỨC VIÊN
25/06/2025 15:19
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request The decision to approve the plan to select contractors for project management consultancy package: Renovated road surface, sidewalk, Truong Dinh road drainage system (section from Hoang Hoa Tham Street to Hoang Dieu Street), Van Giang Ward of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
25/06/2025 15:16
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
23/05/2025 15:24
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the request Decision approving the plan to select contractors to repair road surface, sidewalks, traffic safety of the investor Uỷ ban nhân dân phường Vân Giang with 1 bidding package.
23/05/2025 15:21
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package No. 04: Construction Supervision Consultant of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ XÂY DỰNG AN PHÁT NINH BÌNH
10/04/2025 11:26
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 03: Construction and installation of works of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH ALPHA NINH BÌNH
05/04/2025 15:09
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 2: Construction supervision consultancy: Installing decorative lights of Bach Bach Lake Van Giang of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG SƠN NGUYỄN
04/04/2025 10:48
The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted the results of the bidding package Package 1: Construction and installation of works: Installing decorative lights of Bach Bach Lake Van Giang of the investor Uỷ ban nhân dân phường Vân Giang.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI LOCAL
04/04/2025 10:46
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân phường Vân Giang has posted 27 of the contractor selection plan, which contains 57 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted 7 Tender Notices in 7 bidding packages. Among these, 7 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân phường Vân Giang has posted 36 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 36 package, canceled the bid 0 package (among the bidding packages above).
- There are 30 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân phường Vân Giang has a relationship with 20 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân phường Vân Giang has a relationship with 14 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân phường Vân Giang has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects