Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân thị trấn Long Thành as follows:
- Has relationships with 1 project owners.
- Has relationships with 1 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 69 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 1 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 57 packages that have not fully posted the contractor selection results. Of these 57 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 6,979,325 VND, of which the total winning bid value is: 6,979,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân thị trấn Long Thành as follows:
- Has relationships with 1 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 6,979,325 VND, in which the total winning value is: 6,979,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân thị trấn Long Thành are as follows:
- Is the investor of 2 development investment projects.
- Is the investor of 14 contractor selection plans, of which 14 were self-published, and 0 were published by other entities.
- Is the investor of 11 Tender Notices, of which 0 were self-invited, and 11 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH XÂY DỰNG KỸ THUẬT HẠ TẦNG THĂNG LONG has posted the results of the bidding package Package No. 09: Construction of construction works of pineapple 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: CÔNG TY TNHH ĐT-XD & DV-TM AN PHÚ HƯNG
28/06/2025 13:32
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY has posted the results of the bidding package Package No. 07: Construction of paved tiled works (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: LÊ KHOA DEVELOPMENT INVESTMENT COMPANY LIMITED
23/06/2025 15:24
Bid solicitor CÔNG TY TNHH XÂY DỰNG KỸ THUẬT HẠ TẦNG THĂNG LONG has posted Tender Notice Tender package No 09: Construction of construction works of pineapple 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành with the form Competitive Offer.
05/06/2025 16:22
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request KHLCNT constructs the construction of a cluster of hamlet 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành with 9 bidding package.
28/05/2025 17:58
Investor Ủy ban nhân dân thị trấn Long Thành has posted an investment and development project Building hamma campus 5 (behind the market).
28/05/2025 17:17
Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY has posted Tender Notice Tender package No 07: Construction of paved tiled works (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with the form Competitive Offer.
20/05/2025 17:52
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the results of the bidding package Package No. 04: Bid preparation consultancy, Bid evaluation of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY
09/05/2025 15:28
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request Tiles on the sidewalk (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with 5 bidding package.
09/05/2025 15:16
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request Tiles on the sidewalk (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with 5 bidding package.
09/05/2025 14:54
Investor Ủy ban nhân dân thị trấn Long Thành has posted an investment and development project Tiles on the sidewalk (from his house late to the beginning of QL 53B).
09/05/2025 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân thị trấn Long Thành publishes the plan KHLCNT constructs the construction of a cluster of hamlet 5 (behind the market) with 9 bidding package .
28/05/2025 17:58
Ủy ban nhân dân thị trấn Long Thành announced the results of the bid package Package No. 04: Bid preparation consultancy, Bid evaluation .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY
09/05/2025 15:28
Ủy ban nhân dân thị trấn Long Thành publishes the plan Tiles on the sidewalk (from his house late to the beginning of QL 53B) with 5 bidding package .
09/05/2025 15:16
Ủy ban nhân dân thị trấn Long Thành publishes the plan Tiles on the sidewalk (from his house late to the beginning of QL 53B) with 5 bidding package .
09/05/2025 14:54
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the project of Paving the sidewalk behind the market (lower canal wharf pair) with 5 bidding package .
13/11/2024 16:27
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the project of Paving the sidewalk behind the market (lower canal wharf pair) with 5 bidding package .
13/11/2024 16:02
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the repair of the 4-pair cul-de-sac road on the muddy river with 5 bidding package .
13/11/2024 14:48
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the project of patching Lo Ren road, repairing road block 3, road block 5 with 5 bidding package .
16/10/2024 07:52
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the project of patching Lo Ren road, repairing Dan Khom 3 road, Dan Khom 5 road with 5 bidding package .
16/10/2024 07:42
Ủy ban nhân dân thị trấn Long Thành publishes the plan Regarding the approval of the contractor selection plan for the project of repairing the 4th road (Mr. Tien's house to Song Lap Muong) with 5 bidding package .
16/10/2024 07:07
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH XÂY DỰNG KỸ THUẬT HẠ TẦNG THĂNG LONG has posted the results of the bidding package Package No. 09: Construction of construction works of pineapple 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: CÔNG TY TNHH ĐT-XD & DV-TM AN PHÚ HƯNG
28/06/2025 13:32
The Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY has posted the results of the bidding package Package No. 07: Construction of paved tiled works (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: LÊ KHOA DEVELOPMENT INVESTMENT COMPANY LIMITED
23/06/2025 15:24
Bid solicitor CÔNG TY TNHH XÂY DỰNG KỸ THUẬT HẠ TẦNG THĂNG LONG has posted Tender Notice Tender package No 09: Construction of construction works of pineapple 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành with the form Competitive Offer.
05/06/2025 16:22
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request KHLCNT constructs the construction of a cluster of hamlet 5 (behind the market) of the investor Ủy ban nhân dân thị trấn Long Thành with 9 bidding package.
28/05/2025 17:58
Investor Ủy ban nhân dân thị trấn Long Thành has posted an investment and development project Building hamma campus 5 (behind the market).
28/05/2025 17:17
Bid solicitor CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY has posted Tender Notice Tender package No 07: Construction of paved tiled works (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with the form Competitive Offer.
20/05/2025 17:52
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the results of the bidding package Package No. 04: Bid preparation consultancy, Bid evaluation of the investor Ủy ban nhân dân thị trấn Long Thành.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG TÍN UY
09/05/2025 15:28
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request Tiles on the sidewalk (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with 5 bidding package.
09/05/2025 15:16
The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted the request Tiles on the sidewalk (from his house late to the beginning of QL 53B) of the investor Ủy ban nhân dân thị trấn Long Thành with 5 bidding package.
09/05/2025 14:54
Investor Ủy ban nhân dân thị trấn Long Thành has posted an investment and development project Tiles on the sidewalk (from his house late to the beginning of QL 53B).
09/05/2025 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân thị trấn Long Thành has posted 14 of the contractor selection plan, which contains 69 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has posted 1 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 1 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân thị trấn Long Thành has a relationship with 1 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân thị trấn Long Thành has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects