Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân Thị trấn Tân Kỳ as follows:
- Has relationships with 1 project owners.
- Has relationships with 23 contractor.
- Announced 32 investment development project, of which 4 projects have not yet announced the prequalification documents.
- Announced 30 contractor selection plans with a total of 115 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 32 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 27 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 70 packages that have not fully posted the contractor selection results. Of these 70 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.40 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 16,407,083,000 VND, of which the total winning bid value is: 16,247,503,000 VND.
- The savings rate is: 0.97%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân Thị trấn Tân Kỳ as follows:
- Has relationships with 23 contractor.
- The average number of contractors participating in each bidding package is: 1.40 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 16,407,083,000 VND, in which the total winning value is: 16,247,503,000 VND.
- The savings rate is: 0.97%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân Thị trấn Tân Kỳ are as follows:
- Is the investor of 32 development investment projects.
- Is the investor of 30 contractor selection plans, of which 30 were self-published, and 0 were published by other entities.
- Is the investor of 21 Tender Notices, of which 5 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CIVIL ENGINEERING CONSTRUCTION JSC NO 469 has posted the results of the bidding package Package No. 01: Construction + Ensure traffic safety of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CENTRAL CONSTRUCTION INVESTMENT AND CONSULTING JOINT STOCK COMPANY
18/11/2025 15:13
Bid solicitor CIVIL ENGINEERING CONSTRUCTION JSC NO 469 has posted Tender Notice Tender package No 01: Construction + Ensure traffic safety of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with the form Open bidding.
21/06/2025 17:13
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Repair and upgrade roads in block 1 and 5 of Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 5 bidding package.
21/06/2025 11:02
Investor Ủy ban nhân dân Thị trấn Tân Kỳ has posted an investment and development project Repair and upgrade roads in block 1 and 5 of Tan Ky town, Tan Ky district.
21/06/2025 10:10
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Package No. 01: Consulting, design survey, preparation of technical and economic reports of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: DUC TAI NGHE AN ARCHITECTURE & DESIGN J.S.C;
29/04/2025 16:57
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Plan for selecting contractors to consult and design, prepare a report of the construction industry: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 1 bidding package.
29/04/2025 16:54
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Bidding package book 02: Construction supervision consulting of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CÔNG TY CP KIẾN TRÚC VÀ XÂY DỰNG THUẬN PHÁT
29/04/2025 16:41
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Package No. 01: The whole construction part of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG MIỀN TÂY NGHỆ AN
29/04/2025 16:36
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Plan for selecting construction contractors: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 2 bidding package.
29/04/2025 16:31
Investor Ủy ban nhân dân Thị trấn Tân Kỳ has posted an investment and development project Repairing yard, fence, toilet in the warehouse area, reading room Cultural house block 6, Tan Ky town, Tan Ky district.
29/04/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân Thị trấn Tân Kỳ publishes the plan Repair and upgrade roads in block 1 and 5 of Tan Ky town, Tan Ky district with 5 bidding package .
21/06/2025 11:02
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Package No. 01: Consulting, design survey, preparation of technical and economic reports .
- Winning bidder: DUC TAI NGHE AN ARCHITECTURE & DESIGN J.S.C;
29/04/2025 16:57
Ủy ban nhân dân Thị trấn Tân Kỳ publishes the plan Plan for selecting contractors to consult and design, prepare a report of the construction industry: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district with 1 bidding package .
29/04/2025 16:54
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Bidding package book 02: Construction supervision consulting .
- Winning bidder: CÔNG TY CP KIẾN TRÚC VÀ XÂY DỰNG THUẬN PHÁT
29/04/2025 16:41
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG MIỀN TÂY NGHỆ AN
29/04/2025 16:36
Ủy ban nhân dân Thị trấn Tân Kỳ publishes the plan Plan for selecting construction contractors: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district with 2 bidding package .
29/04/2025 16:31
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Package 03: Project management consultancy. .
- Winning bidder: CÔNG TY CP TƯ VẤN & XÂY DỰNG PHÚC THÀNH NGHỆ AN
09/04/2025 15:04
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Tender package No 02: Construction supervision consultancy .
- Winning bidder: CÔNG TY CP KIẾN TRÚC VÀ XÂY DỰNG THUẬN PHÁT
09/04/2025 14:58
Ủy ban nhân dân Thị trấn Tân Kỳ announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG ĐỒNG THUẬN
09/04/2025 14:55
Ủy ban nhân dân Thị trấn Tân Kỳ publishes the plan Statistics of project contractor selection: 3 -storey working house repair; The door system of the house; Meeting room equipment and some auxiliary items of Tan Ky Town People's Committee with 4 bidding package .
09/04/2025 14:52
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CIVIL ENGINEERING CONSTRUCTION JSC NO 469 has posted the results of the bidding package Package No. 01: Construction + Ensure traffic safety of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CENTRAL CONSTRUCTION INVESTMENT AND CONSULTING JOINT STOCK COMPANY
18/11/2025 15:13
Bid solicitor CIVIL ENGINEERING CONSTRUCTION JSC NO 469 has posted Tender Notice Tender package No 01: Construction + Ensure traffic safety of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with the form Open bidding.
21/06/2025 17:13
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Repair and upgrade roads in block 1 and 5 of Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 5 bidding package.
21/06/2025 11:02
Investor Ủy ban nhân dân Thị trấn Tân Kỳ has posted an investment and development project Repair and upgrade roads in block 1 and 5 of Tan Ky town, Tan Ky district.
21/06/2025 10:10
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Package No. 01: Consulting, design survey, preparation of technical and economic reports of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: DUC TAI NGHE AN ARCHITECTURE & DESIGN J.S.C;
29/04/2025 16:57
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Plan for selecting contractors to consult and design, prepare a report of the construction industry: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 1 bidding package.
29/04/2025 16:54
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Bidding package book 02: Construction supervision consulting of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CÔNG TY CP KIẾN TRÚC VÀ XÂY DỰNG THUẬN PHÁT
29/04/2025 16:41
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the results of the bidding package Package No. 01: The whole construction part of the investor Ủy ban nhân dân Thị trấn Tân Kỳ.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG MIỀN TÂY NGHỆ AN
29/04/2025 16:36
The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted the request Plan for selecting construction contractors: Repairing yard, fence, toilet in the warehouse area, reading room of cultural house block 6, Tan Ky town, Tan Ky district of the investor Ủy ban nhân dân Thị trấn Tân Kỳ with 2 bidding package.
29/04/2025 16:31
Investor Ủy ban nhân dân Thị trấn Tân Kỳ has posted an investment and development project Repairing yard, fence, toilet in the warehouse area, reading room Cultural house block 6, Tan Ky town, Tan Ky district.
29/04/2025 16:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân Thị trấn Tân Kỳ has posted 30 of the contractor selection plan, which contains 115 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted 5 Tender Notices in 5 bidding packages. Among these, 5 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has posted 32 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 32 package, canceled the bid 0 package (among the bidding packages above).
- There are 27 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has a relationship with 23 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân Thị trấn Tân Kỳ has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân Thị trấn Tân Kỳ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects