Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân thị xã Cai Lậy as follows:
- Has relationships with 1 project owners.
- Has relationships with 12 contractor.
- Announced 30 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 27 contractor selection plans with a total of 144 bidding packages, of which 8 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 108 packages that have not fully posted the contractor selection results. Of these 108 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,453,463,740 VND, of which the total winning bid value is: 1,446,504,000 VND.
- The savings rate is: 0.48%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân thị xã Cai Lậy as follows:
- Has relationships with 12 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,453,463,740 VND, in which the total winning value is: 1,446,504,000 VND.
- The savings rate is: 0.48%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân thị xã Cai Lậy are as follows:
- Is the investor of 30 development investment projects.
- Is the investor of 81 contractor selection plans, of which 21 were self-published, and 60 were published by other entities.
- Is the investor of 57 Tender Notices, of which 0 were self-invited, and 57 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: DONGTAM TIENGIANG CONSTRUCTION DESIGN
28/06/2025 10:07
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Terrain survey consultancy and construction design design after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
19/06/2025 14:01
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) of the investor Ủy ban nhân dân thị xã Cai Lậy with 17 bidding package.
18/06/2025 15:12
Investor Ủy ban nhân dân thị xã Cai Lậy has posted an investment and development project Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge).
18/06/2025 14:14
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction insurance of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
10/06/2025 08:09
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
05/06/2025 10:28
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Phu Quy Primary and Secondary School of the investor Ủy ban nhân dân thị xã Cai Lậy with 4 bidding package.
04/06/2025 08:47
Investor Ủy ban nhân dân thị xã Cai Lậy has posted an investment and development project Phu Quy Primary School - Secondary School.
04/06/2025 08:08
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
22/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) with 17 bidding package .
18/06/2025 15:12
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Phu Quy Primary and Secondary School with 4 bidding package .
04/06/2025 08:47
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Upgrade and expansion of district 58 road, Cai Lay town with 13 bidding package .
21/05/2025 10:27
Ủy ban nhân dân thị xã Cai Lậy publishes the plan Road to My Phuoc Tay residential area with 5 bidding package .
23/04/2025 11:40
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Construction insurance .
- Winning bidder: Vien Dong Assurance Corporation
18/04/2025 14:52
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on verifying the design of financial protection and electrical relocation estimates .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN ĐỒNG VIỆT
18/03/2025 08:42
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on surveys, design of physical protection and electrical relocation estimates .
- Winning bidder: CÔNG TY TNHH TƯ VẤN THIẾT KẾ QD
18/03/2025 08:40
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consultancy on preparation of bidding documents and evaluation of bids for technical supervision consultancy bidding packages .
- Winning bidder: CÔNG TY TNHH THIẾT KẾ XÂY DỰNG ĐÔNG HÀ
10/03/2025 16:19
Ủy ban nhân dân thị xã Cai Lậy announced the results of the bid package Consulting on making bidding documents and evaluating bids for construction bidding packages .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG
10/03/2025 16:17
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: DONGTAM TIENGIANG CONSTRUCTION DESIGN
28/06/2025 10:07
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Terrain survey consultancy and construction design design after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
19/06/2025 14:01
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge) of the investor Ủy ban nhân dân thị xã Cai Lậy with 17 bidding package.
18/06/2025 15:12
Investor Ủy ban nhân dân thị xã Cai Lậy has posted an investment and development project Upgrade the road surface and Tan Binh Bridge on DT868 (the section from Sa Rai Bridge to Kinh 12 Bridge).
18/06/2025 14:14
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the results of the bidding package Construction insurance of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: Vien Dong Assurance Corporation
16/06/2025 07:58
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted the results of the bidding package Construction of the investor Ủy ban nhân dân thị xã Cai Lậy.
- Winning bidder: BAO GIANG CONTRUCTION AND SERVICE COMPANY LIMITED
10/06/2025 08:09
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction design consulting and implementation after basic design of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
05/06/2025 10:28
The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted the request Phu Quy Primary and Secondary School of the investor Ủy ban nhân dân thị xã Cai Lậy with 4 bidding package.
04/06/2025 08:47
Investor Ủy ban nhân dân thị xã Cai Lậy has posted an investment and development project Phu Quy Primary School - Secondary School.
04/06/2025 08:08
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG HUY PHONG has posted Tender Notice Construction of the investor Ủy ban nhân dân thị xã Cai Lậy with the form Open bidding.
22/05/2025 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân thị xã Cai Lậy has posted 27 of the contractor selection plan, which contains 144 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân thị xã Cai Lậy has a relationship with 12 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân thị xã Cai Lậy has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects