Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã An Bình as follows:
- Has relationships with 1 project owners.
- Has relationships with 25 contractor.
- Announced 17 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 15 contractor selection plans with a total of 49 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 5 packages (with 5 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 31 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 27 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 19 packages that have not fully posted the contractor selection results. Of these 18 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 9,891,346,299 VND, of which the total winning bid value is: 9,853,011,000 VND.
- The savings rate is: 0.39%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã An Bình as follows:
- Has relationships with 25 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 9,891,346,299 VND, in which the total winning value is: 9,853,011,000 VND.
- The savings rate is: 0.39%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã An Bình are as follows:
- Is the investor of 17 development investment projects.
- Is the investor of 32 contractor selection plans, of which 15 were self-published, and 17 were published by other entities.
- Is the investor of 21 Tender Notices, of which 5 were self-invited, and 16 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH has posted the results of the bidding package Construction of works and provision expenses of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CONSTRUCTION AND CONSERVATION OF CULTURAL WORKS JOINT STOCK COMPANY
11/09/2025 14:24
Bid solicitor CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH has posted Tender Notice Construction of works and provision expenses of the investor Ủy ban nhân dân xã An Bình with the form Open bidding.
27/06/2025 14:54
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the request Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province of the investor Ủy ban nhân dân xã An Bình with 6 bidding package.
27/06/2025 09:46
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Consulting on evaluation of Bidding Documents, results of contractor selection of construction construction package of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG XUÂN KIÊN
26/06/2025 15:58
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Consulting on setting up bidding documents, evaluating bidding packages for construction works of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH
26/06/2025 15:57
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the request Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province of the investor Ủy ban nhân dân xã An Bình with 6 bidding package.
26/06/2025 15:55
Investor Ủy ban nhân dân xã An Bình has posted an investment and development project Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province.
26/06/2025 15:15
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package No. 03: Making technical economic reports of the investor Ủy ban nhân dân xã An Bình.
11/06/2025 16:00
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package No. 01: Surveying the status service for design of the investor Ủy ban nhân dân xã An Bình.
11/06/2025 15:58
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package 05: Verification of construction drawing design and cost estimate of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: DUC DUNG CONSULTANT DESIGN AND INVESTMENT CONSTRUCTION COMPANY LIMITED
06/06/2025 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã An Bình publishes the plan Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province with 6 bidding package .
27/06/2025 09:46
Ủy ban nhân dân xã An Bình announced the results of the bid package Consulting on evaluation of Bidding Documents, results of contractor selection of construction construction package .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG XUÂN KIÊN
26/06/2025 15:58
Ủy ban nhân dân xã An Bình announced the results of the bid package Consulting on setting up bidding documents, evaluating bidding packages for construction works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH
26/06/2025 15:57
Ủy ban nhân dân xã An Bình publishes the plan Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province with 6 bidding package .
26/06/2025 15:55
Ủy ban nhân dân xã An Bình announced the results of the bid package Package No. 03: Making technical economic reports .
- Winning bidder: CONSULTANCY CENTRE FOR COSERVATION OF MONUMENTS
11/06/2025 16:00
Ủy ban nhân dân xã An Bình announced the results of the bid package Package No. 01: Surveying the status service for design .
- Winning bidder: CONSULTANCY CENTRE FOR COSERVATION OF MONUMENTS
11/06/2025 15:58
Ủy ban nhân dân xã An Bình announced the results of the bid package Package 05: Verification of construction drawing design and cost estimate .
- Winning bidder: DUC DUNG CONSULTANT DESIGN AND INVESTMENT CONSTRUCTION COMPANY LIMITED
06/06/2025 15:15
Ủy ban nhân dân xã An Bình announced the results of the bid package Package 04: Project Management .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI TRƯỜNG AN PHÁT
06/06/2025 15:14
Ủy ban nhân dân xã An Bình announced the results of the bid package Package No. 02: Supervision of the current situation .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH
06/06/2025 15:11
Ủy ban nhân dân xã An Bình publishes the plan Adjusting and supplementing the contractor selection plan for investment preparation packages under the project: renovating and embellishing the relics of An Binh commune, Kien Xuong district, Thai Binh province with 5 bidding package .
06/06/2025 15:06
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH has posted the results of the bidding package Construction of works and provision expenses of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CONSTRUCTION AND CONSERVATION OF CULTURAL WORKS JOINT STOCK COMPANY
11/09/2025 14:24
Bid solicitor CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH has posted Tender Notice Construction of works and provision expenses of the investor Ủy ban nhân dân xã An Bình with the form Open bidding.
27/06/2025 14:54
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the request Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province of the investor Ủy ban nhân dân xã An Bình with 6 bidding package.
27/06/2025 09:46
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Consulting on evaluation of Bidding Documents, results of contractor selection of construction construction package of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG XUÂN KIÊN
26/06/2025 15:58
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Consulting on setting up bidding documents, evaluating bidding packages for construction works of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG HẢI LONG THÁI BÌNH
26/06/2025 15:57
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the request Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province of the investor Ủy ban nhân dân xã An Bình with 6 bidding package.
26/06/2025 15:55
Investor Ủy ban nhân dân xã An Bình has posted an investment and development project Renovating and embellishing Dinh Ca relics, An Binh commune, Kien Xuong district, Thai Binh province.
26/06/2025 15:15
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package No. 03: Making technical economic reports of the investor Ủy ban nhân dân xã An Bình.
11/06/2025 16:00
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package No. 01: Surveying the status service for design of the investor Ủy ban nhân dân xã An Bình.
11/06/2025 15:58
The Bid solicitor Ủy ban nhân dân xã An Bình has posted the results of the bidding package Package 05: Verification of construction drawing design and cost estimate of the investor Ủy ban nhân dân xã An Bình.
- Winning bidder: DUC DUNG CONSULTANT DESIGN AND INVESTMENT CONSTRUCTION COMPANY LIMITED
06/06/2025 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã An Bình has posted 15 of the contractor selection plan, which contains 49 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã An Bình has posted 5 Tender Notices in 5 bidding packages. Among these, 0 Tender Notices were self-invited, and 5 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã An Bình has posted 31 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 31 package, canceled the bid 0 package (among the bidding packages above).
- There are 27 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã An Bình has a relationship with 25 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã An Bình has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã An Bình has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects