Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ CÁT HƯNG as follows:
- Has relationships with 4 contractor.
- Announced 3 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 27 bidding packages, of which 5 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 23 packages that have not fully posted the contractor selection results. Of these 21 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.67 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 33,725,889,000 VND, of which the total winning bid value is: 33,308,643,000 VND.
- The savings rate is: 1.24%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ CÁT HƯNG as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 1.67 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 33,725,889,000 VND, in which the total winning value is: 33,308,643,000 VND.
- The savings rate is: 1.24%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 3 investment and development projects.
- As the owner of 7 Contractor selection plan in which 7 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 4 bidding packages in which 4 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package The entire volume of construction and equipment of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
11/04/2024 21:10
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice The entire volume of construction and equipment of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
07/02/2024 17:51
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Investment in construction of central residential area in Cat Hung commune (phase 1, phase 2) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 6 bidding package.
07/02/2024 16:41
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG Posted Development Investment Project Investment in construction of central residential area in Cat Hung commune (phase 1, phase 2).
07/02/2024 16:16
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
21/08/2023 15:23
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 09:36
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 09:17
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 08:53
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package Construction and installation (including costs to ensure traffic safety) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
10/01/2023 07:45
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice Construction and installation (including costs to ensure traffic safety) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
15/11/2022 10:41
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package The entire volume of construction and equipment .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
11/04/2024 21:10
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bidding package The entire volume of construction and equipment with 2 participating contractors .
26/02/2024 09:04
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes Tender Notice The entire volume of construction and equipment in the form Open bidding .
07/02/2024 17:51
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Investment in construction of central residential area in Cat Hung commune (phase 1, phase 2) with 6 bidding package .
07/02/2024 16:41
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the economic - technical report and the contractor selection plan with 1 bidding package .
21/08/2023 15:23
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the economic - technical report and the contractor selection plan with 1 bidding package .
31/07/2023 09:36
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the economic - technical report and the contractor selection plan with 1 bidding package .
31/07/2023 09:17
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the economic - technical report and the contractor selection plan with 1 bidding package .
31/07/2023 08:53
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package Construction and installation (including costs to ensure traffic safety) .
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
10/01/2023 07:45
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bidding package Construction and installation (including costs to ensure traffic safety) with 2 participating contractors .
29/11/2022 10:34
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package The entire volume of construction and equipment of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
11/04/2024 21:10
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice The entire volume of construction and equipment of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
07/02/2024 17:51
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Investment in construction of central residential area in Cat Hung commune (phase 1, phase 2) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 6 bidding package.
07/02/2024 16:41
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG Posted Development Investment Project Investment in construction of central residential area in Cat Hung commune (phase 1, phase 2).
07/02/2024 16:16
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
21/08/2023 15:23
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 09:36
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 09:17
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding the approval of the economic - technical report and the contractor selection plan of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
31/07/2023 08:53
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package Construction and installation (including costs to ensure traffic safety) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH CÔNG NGHỆ & XÂY DỰNG NAM NGÂN
10/01/2023 07:45
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice Construction and installation (including costs to ensure traffic safety) of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
15/11/2022 10:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 13 of the contractor selection plan, which contains 27 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 7 Tender Notice in the 6 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG is the investor of 4 package, of which 4 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG is the owner of 7 contractor selection plan. In which, they self-invite 7 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG is an investor with 4 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG is the investor of 3 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code