Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ CÁT HƯNG as follows:
- Has relationships with 2 project owners.
- Has relationships with 7 contractor.
- Announced 7 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 22 contractor selection plans with a total of 42 bidding packages, of which 13 prequalification documents have not found the investment project.
- Has invited bids for 7 packages (with 8 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 37 packages that have not fully posted the contractor selection results. Of these 35 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.50 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 33,872,762,000 VND, of which the total winning bid value is: 33,450,201,000 VND.
- The savings rate is: 1.25%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ CÁT HƯNG as follows:
- Has relationships with 7 contractor.
- The average number of contractors participating in each bidding package is: 1.50 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 33,872,762,000 VND, in which the total winning value is: 33,450,201,000 VND.
- The savings rate is: 1.25%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 16 contractor selection plans, of which 16 were self-published, and 0 were published by other entities.
- Is the investor of 5 Tender Notices, of which 5 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted an investment and development project Shopping for office machinery and equipment to implement local authorities 02 levels.
25/06/2025 14:14
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package The entire volume of construction work of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP LÝ AN
20/12/2024 15:22
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan
Project: Repairing the meeting house of hamlet 3, Loc Khanh village of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
17/12/2024 15:55
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice The entire volume of construction work of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
27/11/2024 09:11
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Install signs and paint lines on the commune's main roads of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 9 bidding package.
26/11/2024 17:43
Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted an investment and development project Install signs and paint lines on the commune's main roads.
26/11/2024 17:17
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan. Project: Flood recovery; Welcome Gate route to Hoi Loc village - Mr. Le Van Son's house (phase 2); of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
22/11/2024 10:00
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan for Project: Flood Remediation; Route Nha Ho Bon - Road 202 (phase 2); of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
22/11/2024 09:53
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package Supply and installation of outdoor sports equipment to serve the needs of the Commune People's Committee .
- Winning bidder: CÔNG TY TNHH HẢI GIANG BÌNH ĐỊNH
13/11/2024 15:09
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package Regarding only appointing contractors to supply and install outdoor sports equipment to serve the needs of the Commune People's Committee .
- Winning bidder: THUAN TAM DEVELOPMENT INVESTMENT COMPANY LIMITED
07/11/2024 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package The entire volume of construction work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP LÝ AN
20/12/2024 15:22
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding Approval of Economic - Technical Report and Contractor Selection Plan
Project: Repairing the meeting house of hamlet 3, Loc Khanh village with 1 bidding package .
17/12/2024 15:55
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bidding package The entire volume of construction work with 1 participating contractors .
06/12/2024 14:07
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes Tender Notice The entire volume of construction work in the form Open bidding .
27/11/2024 09:11
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Install signs and paint lines on the commune's main roads with 9 bidding package .
26/11/2024 17:43
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding Approval of Economic - Technical Report and Contractor Selection Plan. Project: Flood recovery; Welcome Gate route to Hoi Loc village - Mr. Le Van Son's house (phase 2); with 1 bidding package .
22/11/2024 10:00
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding Approval of Economic - Technical Report and Contractor Selection Plan for Project: Flood Remediation; Route Nha Ho Bon - Road 202 (phase 2); with 1 bidding package .
22/11/2024 09:53
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding Approval of Estimate and Plan for selecting contractors to implement Supply and installation of outdoor sports equipment to serve the needs of Cat Hung Commune People's Committee with 1 bidding package .
04/11/2024 10:34
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the estimate for the Bidding Package: "Procurement of organic waste classification bins (220 liter plastic bins) for households handling organic waste in the commune" with 1 bidding package .
04/11/2024 09:14
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG publishes the plan Regarding the approval of the contractor selection results Package: "Procurement of organic waste classification bins (220 liter plastic bins) for households handling organic waste in the commune" with 1 bidding package .
04/11/2024 09:12
The data sheet has been partially hidden, to see the full information please Login or Register
Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted an investment and development project Shopping for office machinery and equipment to implement local authorities 02 levels.
25/06/2025 14:14
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the results of the bidding package The entire volume of construction work of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP LÝ AN
20/12/2024 15:22
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan
Project: Repairing the meeting house of hamlet 3, Loc Khanh village of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
17/12/2024 15:55
Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted Tender Notice The entire volume of construction work of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with the form Open bidding.
27/11/2024 09:11
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Install signs and paint lines on the commune's main roads of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 9 bidding package.
26/11/2024 17:43
Investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted an investment and development project Install signs and paint lines on the commune's main roads.
26/11/2024 17:17
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan. Project: Flood recovery; Welcome Gate route to Hoi Loc village - Mr. Le Van Son's house (phase 2); of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
22/11/2024 10:00
The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted the request Regarding Approval of Economic - Technical Report and Contractor Selection Plan for Project: Flood Remediation; Route Nha Ho Bon - Road 202 (phase 2); of the investor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG with 1 bidding package.
22/11/2024 09:53
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package Supply and installation of outdoor sports equipment to serve the needs of the Commune People's Committee .
- Winning bidder: CÔNG TY TNHH HẢI GIANG BÌNH ĐỊNH
13/11/2024 15:09
ỦY BAN NHÂN DÂN XÃ CÁT HƯNG announced the results of the bid package Regarding only appointing contractors to supply and install outdoor sports equipment to serve the needs of the Commune People's Committee .
- Winning bidder: THUAN TAM DEVELOPMENT INVESTMENT COMPANY LIMITED
07/11/2024 09:44
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 22 of the contractor selection plan, which contains 42 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 8 Tender Notices in 7 bidding packages. Among these, 5 Tender Notices were self-invited, and 3 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has a relationship with 7 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has a relationship with 11 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ CÁT HƯNG has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects