Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ HÀ HỒI as follows:
- Has relationships with 2 project owners.
- Has relationships with 9 contractor.
- Announced 8 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 10 contractor selection plans with a total of 61 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 10 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 9 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 52 packages that have not fully posted the contractor selection results. Of these 52 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.22 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 31,989,616,000 VND, of which the total winning bid value is: 31,930,575,000 VND.
- The savings rate is: 0.18%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ HÀ HỒI as follows:
- Has relationships with 9 contractor.
- The average number of contractors participating in each bidding package is: 1.22 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 31,989,616,000 VND, in which the total winning value is: 31,930,575,000 VND.
- The savings rate is: 0.18%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI are as follows:
- Is the investor of 8 development investment projects.
- Is the investor of 4 contractor selection plans, of which 4 were self-published, and 0 were published by other entities.
- Is the investor of 9 Tender Notices, of which 9 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Plan for contractor selection phase of project investment preparation: Renovating the fire prevention and fighting system of Cho Vo, Ha Hoi commune, Thuong Tin district, Hanoi City of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 6 bidding package.
26/02/2025 17:15
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Tender package No 01: The entire construction and installation part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
28/06/2024 10:05
Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted Tender Notice Tender package No 01: The entire construction and installation part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with the form Open bidding.
30/05/2024 08:54
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Inter-village road from Thuong Gate to Da Tan intersection, Ha Hoi commune, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 7 bidding package.
17/05/2024 14:31
Investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted an investment and development project Inter-village road from Thuong Gate to Da Tan intersection, Ha Hoi commune, Thuong Tin district, Hanoi city.
17/05/2024 11:11
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH VẬN TẢI HÀNG HOÁ HỒNG VÂN
28/12/2023 15:18
Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted Tender Notice Tender package No 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with the form Open bidding.
15/12/2023 10:20
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Drainage ditch in the field along the village from Fish Gate Pond to Da Thuong Hien base, Ha Hoi commune, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 8 bidding package.
11/12/2023 08:47
Investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted an investment and development project Drainage ditch in the field along the village from Fish Gate Pond to Da Thuong Hien base, Ha Hoi commune, Thuong Tin district, Hanoi city.
11/12/2023 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
03/08/2023 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ HÀ HỒI publishes the plan Plan for contractor selection phase of project investment preparation: Renovating the fire prevention and fighting system of Cho Vo, Ha Hoi commune, Thuong Tin district, Hanoi City with 6 bidding package .
26/02/2025 17:15
ỦY BAN NHÂN DÂN XÃ HÀ HỒI announced the results of the bid package Tender package No 01: The entire construction and installation part .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
28/06/2024 10:05
ỦY BAN NHÂN DÂN XÃ HÀ HỒI announced the results of the bidding package Tender package No 01: The entire construction and installation part with 3 participating contractors .
10/06/2024 10:30
ỦY BAN NHÂN DÂN XÃ HÀ HỒI publishes Tender Notice Tender package No 01: The entire construction and installation part in the form Open bidding .
30/05/2024 08:54
ỦY BAN NHÂN DÂN XÃ HÀ HỒI publishes the plan Inter-village road from Thuong Gate to Da Tan intersection, Ha Hoi commune, Thuong Tin district, Hanoi city with 7 bidding package .
17/05/2024 14:31
ỦY BAN NHÂN DÂN XÃ HÀ HỒI announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY TNHH VẬN TẢI HÀNG HOÁ HỒNG VÂN
28/12/2023 15:18
ỦY BAN NHÂN DÂN XÃ HÀ HỒI announced the results of the bidding package Tender package No 01: The whole construction part with 1 participating contractors .
25/12/2023 15:21
ỦY BAN NHÂN DÂN XÃ HÀ HỒI publishes Tender Notice Tender package No 01: The whole construction part in the form Open bidding .
15/12/2023 10:20
ỦY BAN NHÂN DÂN XÃ HÀ HỒI publishes the plan Drainage ditch in the field along the village from Fish Gate Pond to Da Thuong Hien base, Ha Hoi commune, Thuong Tin district, Hanoi city with 8 bidding package .
11/12/2023 08:47
ỦY BAN NHÂN DÂN XÃ HÀ HỒI announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
03/08/2023 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Plan for contractor selection phase of project investment preparation: Renovating the fire prevention and fighting system of Cho Vo, Ha Hoi commune, Thuong Tin district, Hanoi City of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 6 bidding package.
26/02/2025 17:15
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Tender package No 01: The entire construction and installation part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
28/06/2024 10:05
Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted Tender Notice Tender package No 01: The entire construction and installation part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with the form Open bidding.
30/05/2024 08:54
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Inter-village road from Thuong Gate to Da Tan intersection, Ha Hoi commune, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 7 bidding package.
17/05/2024 14:31
Investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted an investment and development project Inter-village road from Thuong Gate to Da Tan intersection, Ha Hoi commune, Thuong Tin district, Hanoi city.
17/05/2024 11:11
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH VẬN TẢI HÀNG HOÁ HỒNG VÂN
28/12/2023 15:18
Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted Tender Notice Tender package No 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with the form Open bidding.
15/12/2023 10:20
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the request Drainage ditch in the field along the village from Fish Gate Pond to Da Thuong Hien base, Ha Hoi commune, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI with 8 bidding package.
11/12/2023 08:47
Investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted an investment and development project Drainage ditch in the field along the village from Fish Gate Pond to Da Thuong Hien base, Ha Hoi commune, Thuong Tin district, Hanoi city.
11/12/2023 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ HÀ HỒI.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG GIAO THÔNG NHẬT HUY (CHUYỂN TỪ HÀ TÂY VỀ, SỐ CŨ: 0302001480)
03/08/2023 15:49
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted 10 of the contractor selection plan, which contains 61 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted 10 Tender Notices in 9 bidding packages. Among these, 9 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has posted 9 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 9 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has a relationship with 9 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ HÀ HỒI has a relationship with 13 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ HÀ HỒI has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects