Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Hải Xuân as follows:
- Has relationships with 2 project owners.
- Has relationships with 14 contractor.
- Announced 7 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 11 contractor selection plans with a total of 35 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 7 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 20 packages that have not fully posted the contractor selection results. Of these 20 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 51,785,738,000 VND, of which the total winning bid value is: 51,530,928,673 VND.
- The savings rate is: 0.49%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Hải Xuân as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 51,785,738,000 VND, in which the total winning value is: 51,530,928,673 VND.
- The savings rate is: 0.49%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã Hải Xuân are as follows:
- Is the investor of 7 development investment projects.
- Is the investor of 10 contractor selection plans, of which 10 were self-published, and 0 were published by other entities.
- Is the investor of 7 Tender Notices, of which 7 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and Tay Song Long district at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: HAI HAU CONSULTANTCYB AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
11/06/2025 14:53
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: XUAN CHIEN CONTRUCTION JOINT STOCK COMPANY
06/06/2025 15:57
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: TOAN QUOC TRADING AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
03/06/2025 16:38
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
29/05/2025 16:18
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
25/05/2025 09:40
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
24/05/2025 15:32
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the request Contract selection plan for bidding packages
Works: Renovating and upgrading the road of Hai Xuan commune (from the kindergarten area of Hai Cuong area to the adjacent of Con town) of the investor Uỷ ban nhân dân xã Hải Xuân with 5 bidding package.
23/05/2025 16:57
Investor Uỷ ban nhân dân xã Hải Xuân has posted an investment and development project Renovating and upgrading the road of Hai Xuan commune (from the kindergarten area of Hai Cuong area to the army
Con town).
23/05/2025 16:16
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the request Contract selection plan for bidding packages
Works: Renovating and upgrading intersections between the intersection of QL.21 and the West River Highway in Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with 5 bidding package.
17/05/2025 09:09
Investor Uỷ ban nhân dân xã Hải Xuân has posted an investment and development project Renovate and upgrade the intersection of the intersection between QL.21 and the West River Highway in Ba Dien Bridge in Hai Xuan commune.
17/05/2025 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Hải Xuân announced the results of the bid package Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and Tay Song Long district at Ba Dien Bridge in Hai Xuan commune .
- Winning bidder: HAI HAU CONSULTANTCYB AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
11/06/2025 14:53
Uỷ ban nhân dân xã Hải Xuân announced the results of the bid package Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) .
- Winning bidder: XUAN CHIEN CONTRUCTION JOINT STOCK COMPANY
06/06/2025 15:57
Uỷ ban nhân dân xã Hải Xuân announced the results of the bidding package Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune with 1 participating contractors .
04/06/2025 09:00
Uỷ ban nhân dân xã Hải Xuân announced the results of the bid package Civil Works .
- Winning bidder: TOAN QUOC TRADING AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
03/06/2025 16:38
Uỷ ban nhân dân xã Hải Xuân announced the results of the bidding package Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) with 1 participating contractors .
02/06/2025 16:00
Uỷ ban nhân dân xã Hải Xuân publishes Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune in the form Open bidding .
29/05/2025 16:18
Uỷ ban nhân dân xã Hải Xuân announced the results of the bidding package Civil Works with 1 participating contractors .
26/05/2025 09:16
Uỷ ban nhân dân xã Hải Xuân publishes Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune in the form Open bidding .
25/05/2025 09:40
Uỷ ban nhân dân xã Hải Xuân publishes Tender Notice Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) in the form Open bidding .
24/05/2025 15:32
Uỷ ban nhân dân xã Hải Xuân publishes the plan Contract selection plan for bidding packages
Works: Renovating and upgrading the road of Hai Xuan commune (from the kindergarten area of Hai Cuong area to the adjacent of Con town) with 5 bidding package .
23/05/2025 16:57
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and Tay Song Long district at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: HAI HAU CONSULTANTCYB AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
11/06/2025 14:53
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: XUAN CHIEN CONTRUCTION JOINT STOCK COMPANY
06/06/2025 15:57
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the results of the bidding package Civil Works of the investor Uỷ ban nhân dân xã Hải Xuân.
- Winning bidder: TOAN QUOC TRADING AND INVESTMENT CONSTRUCTION JOINT STOCK COMPANY
03/06/2025 16:38
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
29/05/2025 16:18
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction and traffic safety to renovate, upgrade intersections between the intersection between QL.21 and the West River Highway at Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
25/05/2025 09:40
Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted Tender Notice Construction of construction and upgrading of Hai Xuan commune axis (from the kindergarten area of Hai Cuong Area to the adjacent of Con Town) of the investor Uỷ ban nhân dân xã Hải Xuân with the form Open bidding.
24/05/2025 15:32
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the request Contract selection plan for bidding packages
Works: Renovating and upgrading the road of Hai Xuan commune (from the kindergarten area of Hai Cuong area to the adjacent of Con town) of the investor Uỷ ban nhân dân xã Hải Xuân with 5 bidding package.
23/05/2025 16:57
Investor Uỷ ban nhân dân xã Hải Xuân has posted an investment and development project Renovating and upgrading the road of Hai Xuan commune (from the kindergarten area of Hai Cuong area to the army
Con town).
23/05/2025 16:16
The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted the request Contract selection plan for bidding packages
Works: Renovating and upgrading intersections between the intersection of QL.21 and the West River Highway in Ba Dien Bridge in Hai Xuan commune of the investor Uỷ ban nhân dân xã Hải Xuân with 5 bidding package.
17/05/2025 09:09
Investor Uỷ ban nhân dân xã Hải Xuân has posted an investment and development project Renovate and upgrade the intersection of the intersection between QL.21 and the West River Highway in Ba Dien Bridge in Hai Xuan commune.
17/05/2025 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã Hải Xuân has posted 11 of the contractor selection plan, which contains 35 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted 7 Tender Notices in 6 bidding packages. Among these, 7 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Hải Xuân has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã Hải Xuân has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects