Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Hồng Hưng as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 5 investment development project, of which 1 projects have not yet announced the prequalification documents.
- Announced 7 contractor selection plans with a total of 29 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 16 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,801,935,000 VND, of which the total winning bid value is: 1,801,935,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Hồng Hưng as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,801,935,000 VND, in which the total winning value is: 1,801,935,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Hồng Hưng are as follows:
- Is the investor of 5 development investment projects.
- Is the investor of 7 contractor selection plans, of which 7 were self-published, and 0 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 06: Independent audit of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:52
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 06: Independent audit of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:50
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 07: Construction of works of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG HƯNG LONG GIA LỘC
16/06/2025 21:08
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 04: Construction supervision consultancy of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 21:06
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 03: Project management consultancy of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: Công ty cổ phần xây dựng Rebar Việt Nam
16/06/2025 21:04
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the request Project: Renovating and repairing auxiliary works of the People's Committee of Hong Hung Commune; Category: Gate, fence and doors, corrugated iron hall of the investor Ủy ban nhân dân xã Hồng Hưng with 5 bidding package.
16/06/2025 21:02
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 02: Consulting for construction drawing and estimates of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 20:48
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 07: Construction and construction camera system of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
16/06/2025 20:46
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 01: Survey, measurement of the current situation and making economic - technical reports of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHƯƠNG HƯNG
16/06/2025 20:45
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the request Project preparation phase: Renovating and repairing auxiliary works of Hong Hung Commune People's Committee headquarters; Category: Gate, fence and doors, corrugated iron hall of the investor Ủy ban nhân dân xã Hồng Hưng with 2 bidding package.
16/06/2025 20:42
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package Number 06: Independent audit .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:52
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package Number 06: Independent audit .
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:50
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package Number 07: Construction of works .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG HƯNG LONG GIA LỘC
16/06/2025 21:08
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package No. 04: Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 21:06
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package No. 03: Project management consultancy .
- Winning bidder: Công ty cổ phần xây dựng Rebar Việt Nam
16/06/2025 21:04
Ủy ban nhân dân xã Hồng Hưng publishes the plan Project: Renovating and repairing auxiliary works of the People's Committee of Hong Hung Commune; Category: Gate, fence and doors, corrugated iron hall with 5 bidding package .
16/06/2025 21:02
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package No. 02: Consulting for construction drawing and estimates .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 20:48
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package No. 07: Construction and construction camera system .
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG HƯNG LONG GIA LỘC, VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
16/06/2025 20:46
Ủy ban nhân dân xã Hồng Hưng announced the results of the bid package No. 01: Survey, measurement of the current situation and making economic - technical reports .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHƯƠNG HƯNG
16/06/2025 20:45
Ủy ban nhân dân xã Hồng Hưng publishes the plan Project preparation phase: Renovating and repairing auxiliary works of Hong Hung Commune People's Committee headquarters; Category: Gate, fence and doors, corrugated iron hall with 2 bidding package .
16/06/2025 20:42
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 06: Independent audit of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:52
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 06: Independent audit of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: THANG LONG – TDK AUDITING AND EVALUATION COMPANY LIMITED
25/06/2025 08:50
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package Number 07: Construction of works of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: DOANH NGHIỆP TƯ NHÂN XÂY DỰNG HƯNG LONG GIA LỘC
16/06/2025 21:08
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 04: Construction supervision consultancy of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 21:06
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 03: Project management consultancy of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: Công ty cổ phần xây dựng Rebar Việt Nam
16/06/2025 21:04
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the request Project: Renovating and repairing auxiliary works of the People's Committee of Hong Hung Commune; Category: Gate, fence and doors, corrugated iron hall of the investor Ủy ban nhân dân xã Hồng Hưng with 5 bidding package.
16/06/2025 21:02
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 02: Consulting for construction drawing and estimates of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG VÀ THƯƠNG MẠI ĐÔNG DƯƠNG
16/06/2025 20:48
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 07: Construction and construction camera system of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: VIỄN THÔNG HẢI DƯƠNG - TẬP ĐOÀN BƯU CHÍNH VIỄN THÔNG VIỆT NAM
16/06/2025 20:46
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the results of the bidding package No. 01: Survey, measurement of the current situation and making economic - technical reports of the investor Ủy ban nhân dân xã Hồng Hưng.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG PHƯƠNG HƯNG
16/06/2025 20:45
The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted the request Project preparation phase: Renovating and repairing auxiliary works of Hong Hung Commune People's Committee headquarters; Category: Gate, fence and doors, corrugated iron hall of the investor Ủy ban nhân dân xã Hồng Hưng with 2 bidding package.
16/06/2025 20:42
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Hồng Hưng has posted 7 of the contractor selection plan, which contains 29 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has posted 16 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 16 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Hồng Hưng has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Hồng Hưng has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects