Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ Ban Nhân Dân Xã Lâm Kiết as follows:
- Has relationships with 1 project owners.
- Has relationships with 3 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 4 contractor selection plans with a total of 15 bidding packages, of which 2 prequalification documents have not found the investment project.
- Has invited bids for 4 packages (with 4 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 3 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 12 packages that have not fully posted the contractor selection results. Of these 11 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 50.00%, Consultancy 50.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 676,393,156 VND, of which the total winning bid value is: 672,217,442 VND.
- The savings rate is: 0.62%.
Data analysis results of DauThau.info software for bid solicitors Uỷ Ban Nhân Dân Xã Lâm Kiết as follows:
- Has relationships with 3 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 50.00%, Consulting 50.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 676,393,156 VND, in which the total winning value is: 672,217,442 VND.
- The savings rate is: 0.62%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ Ban Nhân Dân Xã Lâm Kiết are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 3 were self-published, and 0 were published by other entities.
- Is the investor of 3 Tender Notices, of which 3 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package No. 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
29/12/2024 22:25
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package 03: Construction work. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: Doanh Nghiệp Tư Nhân Xây Dựng Minh Hận
03/12/2024 16:46
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Tender package No 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Open bidding.
09/11/2024 11:32
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Prepare detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 4 bidding package.
08/11/2024 18:17
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Package 03: Construction work. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Competitive Offer.
06/11/2024 13:59
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Plan for selecting contractors to repair and maintain infrastructure works in Lam Kiet commune. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 4 bidding package.
06/11/2024 10:20
Investor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted an investment and development project Repair and maintenance of infrastructure works in Lam Kiet commune.
06/11/2024 10:10
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package No. 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
28/10/2024 11:55
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Tender package No 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Open bidding.
30/09/2024 10:27
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 3 bidding package.
13/09/2024 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bid package Package No. 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 .
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
29/12/2024 22:25
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bid package Package 03: Construction work. .
- Winning bidder: Doanh Nghiệp Tư Nhân Xây Dựng Minh Hận
03/12/2024 16:46
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bidding package Tender package No 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 with 1 participating contractors .
28/11/2024 10:47
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bidding package Package 03: Construction work. with 1 participating contractors .
13/11/2024 10:37
Uỷ Ban Nhân Dân Xã Lâm Kiết publishes Tender Notice Tender package No 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 in the form Open bidding .
09/11/2024 11:32
Uỷ Ban Nhân Dân Xã Lâm Kiết publishes the plan Prepare detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province with 4 bidding package .
08/11/2024 18:17
Uỷ Ban Nhân Dân Xã Lâm Kiết publishes Tender Notice Package 03: Construction work. in the form Competitive Offer .
06/11/2024 13:59
Uỷ Ban Nhân Dân Xã Lâm Kiết publishes the plan Plan for selecting contractors to repair and maintain infrastructure works in Lam Kiet commune. with 4 bidding package .
06/11/2024 10:20
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bid package Package No. 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune .
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
28/10/2024 11:55
Uỷ Ban Nhân Dân Xã Lâm Kiết announced the results of the bidding package Tender package No 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune with 1 participating contractors .
18/10/2024 15:21
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package No. 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
29/12/2024 22:25
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package 03: Construction work. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: Doanh Nghiệp Tư Nhân Xây Dựng Minh Hận
03/12/2024 16:46
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Tender package No 02: Design detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province, scale 1/500 of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Open bidding.
09/11/2024 11:32
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Prepare detailed planning for the center of Lam Kiet commune, Thanh Tri district, Soc Trang province of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 4 bidding package.
08/11/2024 18:17
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Package 03: Construction work. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Competitive Offer.
06/11/2024 13:59
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Plan for selecting contractors to repair and maintain infrastructure works in Lam Kiet commune. of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 4 bidding package.
06/11/2024 10:20
Investor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted an investment and development project Repair and maintenance of infrastructure works in Lam Kiet commune.
06/11/2024 10:10
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the results of the bidding package Package No. 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết.
- Winning bidder: TRUNG TÂM QUY HOẠCH XÂY DỰNG SÓC TRĂNG
28/10/2024 11:55
Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted Tender Notice Tender package No 01: Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with the form Open bidding.
30/09/2024 10:27
The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted the request Prepare a project to adjust the planning and architectural management regulations of Lam Kiet commune of the investor Uỷ Ban Nhân Dân Xã Lâm Kiết with 3 bidding package.
13/09/2024 16:21
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ Ban Nhân Dân Xã Lâm Kiết has posted 4 of the contractor selection plan, which contains 15 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted 4 Tender Notices in 4 bidding packages. Among these, 3 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has posted 3 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 3 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has a relationship with 3 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ Ban Nhân Dân Xã Lâm Kiết has a relationship with 7 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ Ban Nhân Dân Xã Lâm Kiết has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects