Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 14 contractor.
- Announced 26 investment development project, of which 3 projects have not yet announced the prequalification documents.
- Announced 21 contractor selection plans with a total of 118 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 25 packages (with 26 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 25 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 99 packages that have not fully posted the contractor selection results. Of these 99 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 67,146,451,000 VND, of which the total winning bid value is: 67,070,573,000 VND.
- The savings rate is: 0.11%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 67,146,451,000 VND, in which the total winning value is: 67,070,573,000 VND.
- The savings rate is: 0.11%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG are as follows:
- Is the investor of 26 development investment projects.
- Is the investor of 21 contractor selection plans, of which 21 were self-published, and 0 were published by other entities.
- Is the investor of 26 Tender Notices, of which 26 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The entire construction part + ensuring traffic safety of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: HANH TRANG TRADING AND CONSTRUCTION COMPANY LIMITED
11/03/2025 09:45
Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted Tender Notice Tender package No 01: The entire construction part + ensuring traffic safety of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with the form Open bidding.
21/02/2025 09:55
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the request Renovate and embellish Le Chu street from Gom to Ong Temple, Lien Phuong Commune, Thuong Tin District, Hanoi City of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with 6 bidding package.
08/02/2025 08:38
Investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted an investment and development project Renovate and embellish Le Chu street from Gom to Ong Temple, Lien Phuong Commune, Thuong Tin District, Hanoi City.
08/02/2025 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI MINH PHONG
23/09/2024 16:24
Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted Tender Notice Tender package No 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with the form Open bidding.
09/09/2024 16:32
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the request Renovating and upgrading roads combined with hardening and embellishing the drainage system of Lien Phuong commune's trunk road, the section from hamlet 3 of Bach Lien village through the resettlement area to the Phap Van - Cau Gie expressway tunnel, Lien commune. Phuong, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with 6 bidding package.
28/08/2024 09:22
Investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted an investment and development project Renovating and upgrading roads combined with hardening and embellishing the drainage system of Lien Phuong commune's trunk road, the section from hamlet 3 of Bach Lien village through the resettlement area to the Phap Van - Cau Gie expressway tunnel, Lien commune. Phuong, Thuong Tin district, Hanoi city.
28/08/2024 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
12/08/2024 10:49
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ KINH DOANH THƯƠNG MẠI HẢI NAM
12/08/2024 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bid package Package No. 01: The entire construction part + ensuring traffic safety .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ KINH DOANH THƯƠNG MẠI HẢI NAM, HANH TRANG TRADING AND CONSTRUCTION COMPANY LIMITED
11/03/2025 09:45
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bidding package Tender package No 01: The entire construction part + ensuring traffic safety with 1 participating contractors .
03/03/2025 15:32
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG publishes Tender Notice Tender package No 01: The entire construction part + ensuring traffic safety in the form Open bidding .
21/02/2025 09:55
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG publishes the plan Renovate and embellish Le Chu street from Gom to Ong Temple, Lien Phuong Commune, Thuong Tin District, Hanoi City with 6 bidding package .
08/02/2025 08:38
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: AN NHAT MINH DEVELOPMENT JOINT STOCK COMPANY, CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI MINH PHONG
23/09/2024 16:24
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bidding package Tender package No 01: The whole construction part with 1 participating contractors .
18/09/2024 15:00
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG publishes Tender Notice Tender package No 01: The whole construction part in the form Open bidding .
09/09/2024 16:32
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG publishes the plan Renovating and upgrading roads combined with hardening and embellishing the drainage system of Lien Phuong commune's trunk road, the section from hamlet 3 of Bach Lien village through the resettlement area to the Phap Van - Cau Gie expressway tunnel, Lien commune. Phuong, Thuong Tin district, Hanoi city with 6 bidding package .
28/08/2024 09:22
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bid package Package No. 01: The whole construction part .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ KINH DOANH THƯƠNG MẠI HẢI NAM
12/08/2024 10:49
ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG announced the results of the bid package Package No. 01: The entire construction part of the work .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ KINH DOANH THƯƠNG MẠI HẢI NAM
12/08/2024 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The entire construction part + ensuring traffic safety of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: HANH TRANG TRADING AND CONSTRUCTION COMPANY LIMITED
11/03/2025 09:45
Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted Tender Notice Tender package No 01: The entire construction part + ensuring traffic safety of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with the form Open bidding.
21/02/2025 09:55
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the request Renovate and embellish Le Chu street from Gom to Ong Temple, Lien Phuong Commune, Thuong Tin District, Hanoi City of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with 6 bidding package.
08/02/2025 08:38
Investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted an investment and development project Renovate and embellish Le Chu street from Gom to Ong Temple, Lien Phuong Commune, Thuong Tin District, Hanoi City.
08/02/2025 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ THƯƠNG MẠI MINH PHONG
23/09/2024 16:24
Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted Tender Notice Tender package No 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with the form Open bidding.
09/09/2024 16:32
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the request Renovating and upgrading roads combined with hardening and embellishing the drainage system of Lien Phuong commune's trunk road, the section from hamlet 3 of Bach Lien village through the resettlement area to the Phap Van - Cau Gie expressway tunnel, Lien commune. Phuong, Thuong Tin district, Hanoi city of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG with 6 bidding package.
28/08/2024 09:22
Investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted an investment and development project Renovating and upgrading roads combined with hardening and embellishing the drainage system of Lien Phuong commune's trunk road, the section from hamlet 3 of Bach Lien village through the resettlement area to the Phap Van - Cau Gie expressway tunnel, Lien commune. Phuong, Thuong Tin district, Hanoi city.
28/08/2024 08:08
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The whole construction part of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
12/08/2024 10:49
The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted the results of the bidding package Package No. 01: The entire construction part of the work of the investor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG VÀ KINH DOANH THƯƠNG MẠI HẢI NAM
12/08/2024 10:47
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted 21 of the contractor selection plan, which contains 118 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted 26 Tender Notices in 25 bidding packages. Among these, 26 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has posted 25 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 25 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has a relationship with 24 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ LIÊN PHƯƠNG has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects