Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn as follows:
- Has relationships with 4 contractor.
- Announced 2 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 2 contractor selection plans with a total of 9 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 2 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 3 packages that have not fully posted the contractor selection results. Of these 3 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 5,331,255,000 VND, of which the total winning bid value is: 5,322,975,860 VND.
- The savings rate is: 0.16%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 5,331,255,000 VND, in which the total winning value is: 5,322,975,860 VND.
- The savings rate is: 0.16%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 2 investment and development projects.
- As the owner of 1 Contractor selection plan in which 1 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 3 bidding packages in which 2 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package No. 04: Construction supervision consultancy of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
04/01/2024 14:43
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package No. 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG A&M
04/01/2024 14:34
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package number 03: Consulting on appraisal of bidding documents and LCNT results for package number 05. of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ XÂY DỰNG T&T NGHỆ AN
30/12/2023 09:27
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Bid package No. 02: Consulting on preparing bidding documents and evaluating LCNT results for bidding package No. 05 of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: IQ BUILDING DESIGN CONSULT AND CONSTRUCTION JSC
30/12/2023 09:24
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Tender package No 01: Project management consulting of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
30/12/2023 09:21
Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted Tender Notice Tender package No 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with the form Competitive Offer.
12/12/2023 16:34
Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted Tender Notice Tender package No 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with the form Competitive Offer.
12/12/2023 16:25
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the request Maintaining and repairing the road from Village 4 to Village 8 (section Km1+660 to Km2+942) and building Khe Da concrete road in Village 6, Long Son commune, Anh Son district of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with 5 bidding package.
08/12/2023 14:14
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn Posted Development Investment Project Maintaining and repairing the road from Village 4 to Village 8 (section Km1+660 to Km2+942) and building Khe Da concrete road in Village 6, Long Son commune, Anh Son district.
08/12/2023 13:13
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn Posted Development Investment Project Upgrading the hall and campus of the cultural house of Long Son commune.
12/01/2023 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bid package Package No. 04: Construction supervision consultancy .
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
04/01/2024 14:43
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bid package Package No. 05: The entire construction and installation part of the work .
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG A&M
04/01/2024 14:34
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bid package Package number 03: Consulting on appraisal of bidding documents and LCNT results for package number 05. .
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ XÂY DỰNG T&T NGHỆ AN
30/12/2023 09:27
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bid package Bid package No. 02: Consulting on preparing bidding documents and evaluating LCNT results for bidding package No. 05 .
- Winning bidder: IQ BUILDING DESIGN CONSULT AND CONSTRUCTION JSC
30/12/2023 09:24
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bid package Tender package No 01: Project management consulting .
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
30/12/2023 09:21
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn announced the results of the bidding package Tender package No 05: The entire construction and installation part of the work with 1 participating contractors .
19/12/2023 16:00
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn publishes Tender Notice Tender package No 05: The entire construction and installation part of the work in the form Competitive Offer .
12/12/2023 16:34
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn publishes Tender Notice Tender package No 05: The entire construction and installation part of the work in the form Competitive Offer .
12/12/2023 16:25
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn publishes the plan Maintaining and repairing the road from Village 4 to Village 8 (section Km1+660 to Km2+942) and building Khe Da concrete road in Village 6, Long Son commune, Anh Son district with 5 bidding package .
08/12/2023 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package No. 04: Construction supervision consultancy of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
04/01/2024 14:43
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package No. 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG A&M
04/01/2024 14:34
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Package number 03: Consulting on appraisal of bidding documents and LCNT results for package number 05. of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: CÔNG TY CP TƯ VẤN THIẾT KẾ XÂY DỰNG T&T NGHỆ AN
30/12/2023 09:27
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Bid package No. 02: Consulting on preparing bidding documents and evaluating LCNT results for bidding package No. 05 of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: IQ BUILDING DESIGN CONSULT AND CONSTRUCTION JSC
30/12/2023 09:24
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the results of the bidding package Tender package No 01: Project management consulting of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn.
- Winning bidder: Công ty cổ phần Minh Sơn Đại Thành
30/12/2023 09:21
Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted Tender Notice Tender package No 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with the form Competitive Offer.
12/12/2023 16:34
Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted Tender Notice Tender package No 05: The entire construction and installation part of the work of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with the form Competitive Offer.
12/12/2023 16:25
The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted the request Maintaining and repairing the road from Village 4 to Village 8 (section Km1+660 to Km2+942) and building Khe Da concrete road in Village 6, Long Son commune, Anh Son district of the investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn with 5 bidding package.
08/12/2023 14:14
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn Posted Development Investment Project Maintaining and repairing the road from Village 4 to Village 8 (section Km1+660 to Km2+942) and building Khe Da concrete road in Village 6, Long Son commune, Anh Son district.
08/12/2023 13:13
Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn Posted Development Investment Project Upgrading the hall and campus of the cultural house of Long Son commune.
12/01/2023 14:14
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted 2 of the contractor selection plan, which contains 9 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted 2 Tender Notice in the 1 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn is the investor of 3 package, of which 2 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn is the owner of 1 contractor selection plan. In which, they self-invite 1 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn is an investor with 6 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Ủy ban nhân dân xã Long Sơn, huyện Anh Sơn is the investor of 2 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code