Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy Ban Nhân Dân xã Minh Hải as follows:
- Has relationships with 1 project owners.
- Has relationships with 15 contractor.
- Announced 19 investment development project, of which 2 projects have not yet announced the prequalification documents.
- Announced 12 contractor selection plans with a total of 46 bidding packages, of which 7 prequalification documents have not found the investment project.
- Has invited bids for 6 packages (with 6 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 26 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 20 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 22 packages that have not fully posted the contractor selection results. Of these 22 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 83.33%, Consultancy 0%, Non-consultancy 16.67%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 25,026,587,000 VND, of which the total winning bid value is: 24,953,018,000 VND.
- The savings rate is: 0.29%.
Data analysis results of DauThau.info software for bid solicitors Ủy Ban Nhân Dân xã Minh Hải as follows:
- Has relationships with 15 contractor.
- The average number of contractors participating in each bidding package is: 1.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 83.33%, Consulting 0%, Non-consulting 16.67%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 25,026,587,000 VND, in which the total winning value is: 24,953,018,000 VND.
- The savings rate is: 0.29%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy Ban Nhân Dân xã Minh Hải are as follows:
- Is the investor of 19 development investment projects.
- Is the investor of 12 contractor selection plans, of which 12 were self-published, and 0 were published by other entities.
- Is the investor of 18 Tender Notices, of which 6 were self-invited, and 12 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Package No. 01: Procurement of outdoor movement equipment for the People's Committee of Minh Hai commune of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: Hộ kinh doanh Nguyễn Thị Trà
23/06/2025 09:31
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the request Shopping outdoor movement equipment for the People's Committee of Minh Hai commune of the investor Ủy Ban Nhân Dân xã Minh Hải with 1 bidding package.
23/06/2025 09:26
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction and installation of works of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: Công ty cổ phần 23.5 – Việt Nam
17/06/2025 08:25
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction supervision consultancy. of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY TNHH TM VÀ XD TÂN THÀNH PHÁT
16/06/2025 14:17
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Project management consulting project. of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: BACH DANG CONSULTING AND CONSTRUCTION DEVELOPMENT JOINT STOCK COMPANY
16/06/2025 11:49
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the request Repairing roads to Dong village, Minh Hai commune (from Mr. Tuong's field to Mr. Bang's house) of the investor Ủy Ban Nhân Dân xã Minh Hải with 3 bidding package.
16/06/2025 11:45
Investor Ủy Ban Nhân Dân xã Minh Hải has posted an investment and development project Repairing roads to Dong village, Minh Hai commune (from Mr. Tuong's field to Mr. Bang's house).
16/06/2025 11:11
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction supervision consultancy of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
16/05/2025 16:46
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction project management consulting of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
16/05/2025 16:44
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction of repair works in the interior road of Minh Hai commune (section from Hoang Nha pumping station to Mr. Nung's farm) of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ QUANG THẮNG
16/05/2025 16:41
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Package No. 01: Procurement of outdoor movement equipment for the People's Committee of Minh Hai commune .
- Winning bidder: Hộ kinh doanh Nguyễn Thị Trà
23/06/2025 09:31
Ủy Ban Nhân Dân xã Minh Hải publishes the plan Shopping outdoor movement equipment for the People's Committee of Minh Hai commune with 1 bidding package .
23/06/2025 09:26
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Construction and installation of works .
- Winning bidder: Công ty cổ phần 23.5 – Việt Nam
17/06/2025 08:25
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Construction supervision consultancy. .
- Winning bidder: CÔNG TY TNHH TM VÀ XD TÂN THÀNH PHÁT
16/06/2025 14:17
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Project management consulting project. .
- Winning bidder: BACH DANG CONSULTING AND CONSTRUCTION DEVELOPMENT JOINT STOCK COMPANY
16/06/2025 11:49
Ủy Ban Nhân Dân xã Minh Hải publishes the plan Repairing roads to Dong village, Minh Hai commune (from Mr. Tuong's field to Mr. Bang's house) with 3 bidding package .
16/06/2025 11:45
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
16/05/2025 16:46
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Construction project management consulting .
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
16/05/2025 16:44
Ủy Ban Nhân Dân xã Minh Hải announced the results of the bid package Construction of repair works in the interior road of Minh Hai commune (section from Hoang Nha pumping station to Mr. Nung's farm) .
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ QUANG THẮNG
16/05/2025 16:41
Ủy Ban Nhân Dân xã Minh Hải publishes the plan Plan to select contractor for repairing roads in the field of Minh Hai commune (from Hoang Nha pumping station to Mr. Nung's farm) with 3 bidding package .
09/05/2025 15:03
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Package No. 01: Procurement of outdoor movement equipment for the People's Committee of Minh Hai commune of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: Hộ kinh doanh Nguyễn Thị Trà
23/06/2025 09:31
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the request Shopping outdoor movement equipment for the People's Committee of Minh Hai commune of the investor Ủy Ban Nhân Dân xã Minh Hải with 1 bidding package.
23/06/2025 09:26
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction and installation of works of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: Công ty cổ phần 23.5 – Việt Nam
17/06/2025 08:25
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction supervision consultancy. of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY TNHH TM VÀ XD TÂN THÀNH PHÁT
16/06/2025 14:17
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Project management consulting project. of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: BACH DANG CONSULTING AND CONSTRUCTION DEVELOPMENT JOINT STOCK COMPANY
16/06/2025 11:49
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the request Repairing roads to Dong village, Minh Hai commune (from Mr. Tuong's field to Mr. Bang's house) of the investor Ủy Ban Nhân Dân xã Minh Hải with 3 bidding package.
16/06/2025 11:45
Investor Ủy Ban Nhân Dân xã Minh Hải has posted an investment and development project Repairing roads to Dong village, Minh Hai commune (from Mr. Tuong's field to Mr. Bang's house).
16/06/2025 11:11
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction supervision consultancy of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY CỔ PHẦN TƯ VẤN TDH
16/05/2025 16:46
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction project management consulting of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: TPC CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
16/05/2025 16:44
The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted the results of the bidding package Construction of repair works in the interior road of Minh Hai commune (section from Hoang Nha pumping station to Mr. Nung's farm) of the investor Ủy Ban Nhân Dân xã Minh Hải.
- Winning bidder: CÔNG TY TNHH TƯ VẤN ĐẦU TƯ QUANG THẮNG
16/05/2025 16:41
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy Ban Nhân Dân xã Minh Hải has posted 12 of the contractor selection plan, which contains 46 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted 6 Tender Notices in 6 bidding packages. Among these, 6 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has posted 26 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 26 package, canceled the bid 0 package (among the bidding packages above).
- There are 20 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has a relationship with 15 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy Ban Nhân Dân xã Minh Hải has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy Ban Nhân Dân xã Minh Hải has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects