Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Nhơn Tân as follows:
- Has relationships with 1 project owners.
- Has relationships with 10 contractor.
- Announced 31 investment development project, of which 5 projects have not yet announced the prequalification documents.
- Announced 27 contractor selection plans with a total of 50 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 10 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 5 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 2 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 31 packages that have not fully posted the contractor selection results. Of these 24 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.00 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 29,684,955,981 VND, of which the total winning bid value is: 28,354,702,840 VND.
- The savings rate is: 4.48%.
Data analysis results of DauThau.info software for bid solicitors Uỷ ban nhân dân xã Nhơn Tân as follows:
- Has relationships with 10 contractor.
- The average number of contractors participating in each bidding package is: 2.00 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 29,684,955,981 VND, in which the total winning value is: 28,354,702,840 VND.
- The savings rate is: 4.48%.
This Bid solicitor is also an investor. The analysis results of data for the investor Uỷ ban nhân dân xã Nhơn Tân are as follows:
- Is the investor of 31 development investment projects.
- Is the investor of 31 contractor selection plans, of which 27 were self-published, and 4 were published by other entities.
- Is the investor of 35 Tender Notices, of which 11 were self-invited, and 24 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor AN MINH COMPANY LIMITED has posted the results of the bidding package The entire construction volume of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: TRINH KHANH CO.,LTD
30/05/2025 16:30
Bid solicitor AN MINH COMPANY LIMITED has posted Tender Notice The entire construction volume of the investor Uỷ ban nhân dân xã Nhơn Tân with the form Open bidding.
07/05/2025 17:02
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request Works: Building roads to Nam An Nhon Cemetery (phase 1) of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
07/05/2025 14:35
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request The entire volume of construction work of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
07/05/2025 11:03
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request The entire volume of construction work of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
28/03/2025 16:00
Investor Uỷ ban nhân dân xã Nhơn Tân has posted an investment and development project Building roads to Nam An Nhon Cemetery (phase 1).
28/03/2025 15:15
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XD PHONG PHÚ has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:46
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XD PHONG PHÚ has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:42
The Bid solicitor TAN PHAT ENVIRONMENT AND CONSTRUCTION CONSULTING CO.,LTD has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:17
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the results of the bidding package Consulting on appraisal of bidding documents, results of selection of construction and installation contractors and equipment of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: NGUYEN KHOI CONSTRUCTION GENERAL COMPANY LIMITED
18/02/2025 08:34
The data sheet has been partially hidden, to see the full information please Login or Register
Uỷ ban nhân dân xã Nhơn Tân publishes the plan Works: Building roads to Nam An Nhon Cemetery (phase 1) with 1 bidding package .
07/05/2025 14:35
Uỷ ban nhân dân xã Nhơn Tân publishes the plan The entire volume of construction work with 1 bidding package .
07/05/2025 11:03
Uỷ ban nhân dân xã Nhơn Tân publishes the plan The entire volume of construction work with 1 bidding package .
28/03/2025 16:00
Uỷ ban nhân dân xã Nhơn Tân announced the results of the bid package Consulting on appraisal of bidding documents, results of selection of construction and installation contractors and equipment .
- Winning bidder: NGUYEN KHOI CONSTRUCTION GENERAL COMPANY LIMITED
18/02/2025 08:34
Uỷ ban nhân dân xã Nhơn Tân announced the results of the bid package Consultancy on preparation of bidding documents and evaluation of bids for construction and equipment .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG TỔNG HỢP THÀNH VINH
18/02/2025 08:30
Uỷ ban nhân dân xã Nhơn Tân announced the results of the bid package Bidding for construction + equipment .
- Winning bidder: CÔNG TY TRÁCH NHIỆM HỮU HẠN XÂY DỰNG NGUYÊN TÍN
18/02/2025 08:21
Uỷ ban nhân dân xã Nhơn Tân publishes the plan KHLCNTInvestment in constructing asphalt mats for Xuan Dien traffic route (Section from National Highway 19 to Nhon Loc border) with 1 bidding package .
06/01/2025 16:25
Uỷ ban nhân dân xã Nhơn Tân publishes the plan Plan to select contractors for the project Investment in construction of asphalt mats for traffic routes from Nui I Lake spillway to Da Lo bridge with 1 bidding package .
06/01/2025 14:31
Uỷ ban nhân dân xã Nhơn Tân publishes the plan Plan for selecting contractors for the project Investment in construction of asphalt mats for traffic routes in Phuc Hau and Phuc Moi hamlets (Section from DH.36 street to Mr. Le Van Toi's house and section from Phuc Hau structure to Mr. Vy Duc Tien's house) with 1 bidding package .
06/01/2025 14:27
Uỷ ban nhân dân xã Nhơn Tân announced the results of the bidding package Bidding for construction + equipment with 3 participating contractors .
27/12/2024 08:19
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor AN MINH COMPANY LIMITED has posted the results of the bidding package The entire construction volume of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: TRINH KHANH CO.,LTD
30/05/2025 16:30
Bid solicitor AN MINH COMPANY LIMITED has posted Tender Notice The entire construction volume of the investor Uỷ ban nhân dân xã Nhơn Tân with the form Open bidding.
07/05/2025 17:02
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request Works: Building roads to Nam An Nhon Cemetery (phase 1) of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
07/05/2025 14:35
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request The entire volume of construction work of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
07/05/2025 11:03
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the request The entire volume of construction work of the investor Uỷ ban nhân dân xã Nhơn Tân with 1 bidding package.
28/03/2025 16:00
Investor Uỷ ban nhân dân xã Nhơn Tân has posted an investment and development project Building roads to Nam An Nhon Cemetery (phase 1).
28/03/2025 15:15
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XD PHONG PHÚ has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:46
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ XD PHONG PHÚ has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:42
The Bid solicitor TAN PHAT ENVIRONMENT AND CONSTRUCTION CONSULTING CO.,LTD has posted the results of the bidding package Construction costs of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP T73
05/03/2025 15:17
The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted the results of the bidding package Consulting on appraisal of bidding documents, results of selection of construction and installation contractors and equipment of the investor Uỷ ban nhân dân xã Nhơn Tân.
- Winning bidder: NGUYEN KHOI CONSTRUCTION GENERAL COMPANY LIMITED
18/02/2025 08:34
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Uỷ ban nhân dân xã Nhơn Tân has posted 27 of the contractor selection plan, which contains 50 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted 11 Tender Notices in 10 bidding packages. Among these, 10 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has posted 5 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 5 package, canceled the bid 0 package (among the bidding packages above).
- There are 2 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has a relationship with 10 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Uỷ ban nhân dân xã Nhơn Tân has a relationship with 8 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Uỷ ban nhân dân xã Nhơn Tân has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects