Data analysis results of DauThau.info software for bid solicitors UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN as follows:
- Has relationships with 1 project owners.
- Has relationships with 14 contractor.
- Announced 4 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 16 contractor selection plans with a total of 41 bidding packages, of which 12 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 28 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,577,108,000 VND, of which the total winning bid value is: 1,577,108,000 VND.
- The savings rate is: 0.00%.
Data analysis results of DauThau.info software for bid solicitors UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN as follows:
- Has relationships with 14 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,577,108,000 VND, in which the total winning value is: 1,577,108,000 VND.
- The savings rate is: 0.00%.
This Bid solicitor is also an investor. The analysis results of data for the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN are as follows:
- Is the investor of 4 development investment projects.
- Is the investor of 16 contractor selection plans, of which 16 were self-published, and 0 were published by other entities.
- Is the investor of 4 Tender Notices, of which 0 were self-invited, and 4 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Civil Works of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TMDV TƯ PHÁT
21/04/2025 07:30
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Construction supervision of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
21/04/2025 07:28
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Project management consultancy of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
21/04/2025 07:26
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the request Plan for selecting construction contractors: Repairing and maintaining roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN with 3 bidding package.
21/04/2025 07:22
Investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted an investment and development project Repair and maintenance of roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune.
21/04/2025 07:07
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Consulting design verification - cost estimate of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
28/03/2025 15:16
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Consulting, surveying, preparing economic and technical reports for construction works of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
28/03/2025 15:14
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the request The contractor selection plan for the package of the work is done at the stage of preparation for construction investment: repair and maintenance of roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN with 2 bidding package.
28/03/2025 15:12
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Supply willow of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:09
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Material Supply of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH TMDV TƯ PHÁT
21/04/2025 07:30
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Construction supervision .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
21/04/2025 07:28
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
21/04/2025 07:26
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN publishes the plan Plan for selecting construction contractors: Repairing and maintaining roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune with 3 bidding package .
21/04/2025 07:22
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Consulting design verification - cost estimate .
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
28/03/2025 15:16
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Consulting, surveying, preparing economic and technical reports for construction works .
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
28/03/2025 15:14
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN publishes the plan The contractor selection plan for the package of the work is done at the stage of preparation for construction investment: repair and maintenance of roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune with 2 bidding package .
28/03/2025 15:12
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Supply willow .
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:09
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN announced the results of the bid package Material Supply .
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:05
UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN publishes the plan Plan for selecting construction contractors: Upgrading and repairing roads in Xuan An village, Phu Xuan commune with 1 bidding package .
21/03/2025 16:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Civil Works of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TMDV TƯ PHÁT
21/04/2025 07:30
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Construction supervision of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
21/04/2025 07:28
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Project management consultancy of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
21/04/2025 07:26
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the request Plan for selecting construction contractors: Repairing and maintaining roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN with 3 bidding package.
21/04/2025 07:22
Investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted an investment and development project Repair and maintenance of roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune.
21/04/2025 07:07
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Consulting design verification - cost estimate of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH ĐT & TV XÂY DỰNG HOÀ BÌNH
28/03/2025 15:16
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Consulting, surveying, preparing economic and technical reports for construction works of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY TNHH TƯ VẤN XÂY DỰNG PHÚC THANH
28/03/2025 15:14
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the request The contractor selection plan for the package of the work is done at the stage of preparation for construction investment: repair and maintenance of roads from provincial road 3 to Vo Thi Sau Primary School, Phu Xuan Commune of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN with 2 bidding package.
28/03/2025 15:12
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Supply willow of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:09
The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted the results of the bidding package Material Supply of the investor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN.
- Winning bidder: CÔNG TY CỔ PHẦN XD T&A
24/03/2025 16:05
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted 16 of the contractor selection plan, which contains 41 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has posted 28 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 28 package, canceled the bid 0 package (among the bidding packages above).
- There are 0 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has a relationship with 14 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity UỶ BAN NHÂN DÂN XÃ PHÚ XUÂN has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects