Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Tân Mỹ as follows:
- Has relationships with 1 project owners.
- Has relationships with 4 contractor.
- Announced 11 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 14 contractor selection plans with a total of 36 bidding packages, of which 4 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 3 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 22 packages that have not fully posted the contractor selection results. Of these 22 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 100.00%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 391,409,272 VND, of which the total winning bid value is: 373,500,000 VND.
- The savings rate is: 4.58%.
Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Tân Mỹ as follows:
- Has relationships with 4 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 100.00%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 391,409,272 VND, in which the total winning value is: 373,500,000 VND.
- The savings rate is: 4.58%.
This Bid solicitor is also an investor. The analysis results of data for the investor Ủy ban nhân dân xã Tân Mỹ are as follows:
- Is the investor of 11 development investment projects.
- Is the investor of 14 contractor selection plans, of which 14 were self-published, and 0 were published by other entities.
- Is the investor of 13 Tender Notices, of which 1 were self-invited, and 12 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XD NHỰT TIỆP
19/06/2025 10:17
Bid solicitor PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED has posted Tender Notice Construction of the investor Ủy ban nhân dân xã Tân Mỹ with the form Open bidding.
27/05/2025 13:31
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the results of the bidding package Consultancy on appraisal of bidding documents, contractor selection results of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
26/05/2025 13:16
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED
26/05/2025 13:14
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the request The gateway of forest culture - Ben Long hamlet of the investor Ủy ban nhân dân xã Tân Mỹ with 5 bidding package.
26/05/2025 11:37
Investor Ủy ban nhân dân xã Tân Mỹ has posted an investment and development project The gateway of forest culture - Ben Long hamlet.
26/05/2025 08:08
The Bid solicitor Công ty TNHH Tư vấn xây dựng Uyên Châu Phát has posted the results of the bidding package Construction cost of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG DỊCH VỤ THƯƠNG MẠI TRƯƠNG MINH CẢNH
25/03/2025 14:42
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ QUY HOẠCH XÂY DỰNG PHÚ CƯỜNG has posted the results of the bidding package Package No. 4: Construction of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG DỊCH VỤ THƯƠNG MẠI TRƯƠNG MINH CẢNH
24/03/2025 14:13
Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ QUY HOẠCH XÂY DỰNG PHÚ CƯỜNG has posted Tender Notice Tender package No 4: Construction of the investor Ủy ban nhân dân xã Tân Mỹ with the form Competitive Offer.
04/03/2025 17:43
Bid solicitor Công ty TNHH Tư vấn xây dựng Uyên Châu Phát has posted Tender Notice Construction cost of the investor Ủy ban nhân dân xã Tân Mỹ with the form Competitive Offer.
27/02/2025 07:53
The data sheet has been partially hidden, to see the full information please Login or Register
Ủy ban nhân dân xã Tân Mỹ announced the results of the bid package Consultancy on appraisal of bidding documents, contractor selection results .
- Winning bidder: H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
26/05/2025 13:16
Ủy ban nhân dân xã Tân Mỹ announced the results of the bid package Consultancy on preparation and evaluation of tender documents .
- Winning bidder: PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED
26/05/2025 13:14
Ủy ban nhân dân xã Tân Mỹ publishes the plan The gateway of forest culture - Ben Long hamlet with 5 bidding package .
26/05/2025 11:37
Ủy ban nhân dân xã Tân Mỹ publishes the plan Repair and upgrade Bau Two road with 4 bidding package .
21/02/2025 09:31
Ủy ban nhân dân xã Tân Mỹ announced the results of the bid package Cost of preparing Bidding Documents.ĐGHSDT .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Uyên Châu Phát
20/02/2025 08:04
Ủy ban nhân dân xã Tân Mỹ publishes the plan Upgrade to the paved road of Bau Cong hamlet (the section of Mr. Vu Thuy Chi's house to 4 Bau Cong intersection) with 4 bidding package .
17/02/2025 17:37
Ủy ban nhân dân xã Tân Mỹ publishes the plan Upgrade to the paved road of Bau Cong hamlet (the section of Mr. Vu Thuy Chi's house to 4 Bau Cong intersection) with 4 bidding package .
17/02/2025 17:36
Ủy ban nhân dân xã Tân Mỹ publishes the plan Upgrade to the paved road of Bau Cong hamlet (the section of Mr. Vu Thuy Chi's house to 4 Bau Cong intersection) with 4 bidding package .
17/02/2025 17:35
Ủy ban nhân dân xã Tân Mỹ publishes the plan TM 35 Mrs. Anh's street to Mr. No's house with 3 bidding package .
19/08/2024 12:43
Ủy ban nhân dân xã Tân Mỹ publishes the plan Repair, upgrade and asphalt GTNT road (the section from Mr. Le Van Sao's house to Mr. Vu Thuy Chi's house) with 4 bidding package .
19/08/2024 11:48
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED has posted the results of the bidding package Construction of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XD NHỰT TIỆP
19/06/2025 10:17
Bid solicitor PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED has posted Tender Notice Construction of the investor Ủy ban nhân dân xã Tân Mỹ with the form Open bidding.
27/05/2025 13:31
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the results of the bidding package Consultancy on appraisal of bidding documents, contractor selection results of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: H&K CONSTRUCTION INVESTMENT CONSULTING COMPANY LIMITED
26/05/2025 13:16
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the results of the bidding package Consultancy on preparation and evaluation of tender documents of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: PHUONG VY CONSTRUCTION CONSULTANCY COMPANY LIMITED
26/05/2025 13:14
The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted the request The gateway of forest culture - Ben Long hamlet of the investor Ủy ban nhân dân xã Tân Mỹ with 5 bidding package.
26/05/2025 11:37
Investor Ủy ban nhân dân xã Tân Mỹ has posted an investment and development project The gateway of forest culture - Ben Long hamlet.
26/05/2025 08:08
The Bid solicitor Công ty TNHH Tư vấn xây dựng Uyên Châu Phát has posted the results of the bidding package Construction cost of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG DỊCH VỤ THƯƠNG MẠI TRƯƠNG MINH CẢNH
25/03/2025 14:42
The Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ QUY HOẠCH XÂY DỰNG PHÚ CƯỜNG has posted the results of the bidding package Package No. 4: Construction of the investor Ủy ban nhân dân xã Tân Mỹ.
- Winning bidder: CÔNG TY TNHH XÂY DỰNG DỊCH VỤ THƯƠNG MẠI TRƯƠNG MINH CẢNH
24/03/2025 14:13
Bid solicitor CÔNG TY TNHH TƯ VẤN THIẾT KẾ VÀ QUY HOẠCH XÂY DỰNG PHÚ CƯỜNG has posted Tender Notice Tender package No 4: Construction of the investor Ủy ban nhân dân xã Tân Mỹ with the form Competitive Offer.
04/03/2025 17:43
Bid solicitor Công ty TNHH Tư vấn xây dựng Uyên Châu Phát has posted Tender Notice Construction cost of the investor Ủy ban nhân dân xã Tân Mỹ with the form Competitive Offer.
27/02/2025 07:53
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Ủy ban nhân dân xã Tân Mỹ has posted 14 of the contractor selection plan, which contains 36 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted 1 Tender Notices in 1 bidding packages. Among these, 1 Tender Notices were self-invited, and 0 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 3 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has a relationship with 4 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Ủy ban nhân dân xã Tân Mỹ has a relationship with 1 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Ủy ban nhân dân xã Tân Mỹ has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects