Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ THANH TÙNG as follows:
- Has relationships with 1 project owners.
- Has relationships with 8 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors ỦY BAN NHÂN DÂN XÃ THANH TÙNG as follows:
- Has relationships with 8 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor ỦY BAN NHÂN DÂN XÃ THANH TÙNG are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 3 contractor selection plans, of which 0 were self-published, and 3 were published by other entities.
- Is the investor of 2 Tender Notices, of which 0 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
ỦY BAN NHÂN DÂN XÃ THANH TÙNG publishes Tender Notice Package number 02: Buy 01 08-seat car in the form Competitive Offer .
24/12/2025 10:27
ỦY BAN NHÂN DÂN XÃ THANH TÙNG publishes the plan Procurement of 01 08-seat car to serve general work for Thanh Tung commune with 2 bidding package .
09/12/2025 08:09
ỦY BAN NHÂN DÂN XÃ THANH TÙNG announced the results of the bid package Bidding package for procurement of property and equipment .
- Winning bidder: CÔNG TY TNHH THIẾT BỊ NGUYÊN LIỆU BẢO AN
18/11/2025 15:29
ỦY BAN NHÂN DÂN XÃ THANH TÙNG publishes the plan Bidding package for procurement of property and equipment with 1 bidding package .
07/11/2025 14:19
ỦY BAN NHÂN DÂN XÃ THANH TÙNG announced the results of the bid package Tender package: Construction work .
- Winning bidder: DOANH NGHIỆP TN BẠCH
31/10/2025 10:57
ỦY BAN NHÂN DÂN XÃ THANH TÙNG publishes Tender Notice Tender package: Construction work in the form Competitive Offer .
15/10/2025 10:32
ỦY BAN NHÂN DÂN XÃ THANH TÙNG publishes the plan Construction of rural traffic road along Truong Dao canal (Starting point from Truong Dao bridge) with 5 bidding package .
14/10/2025 08:13
Investor ỦY BAN NHÂN DÂN XÃ THANH TÙNG has posted an investment and development project Construction of rural traffic road along Truong Dao canal (Starting point from Truong Dao bridge).
14/10/2025 08:08
The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ THANH TÙNG has a relationship with 8 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor ỦY BAN NHÂN DÂN XÃ THANH TÙNG has a relationship with 3 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity ỦY BAN NHÂN DÂN XÃ THANH TÙNG has a relationship with 0 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects