Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND và UBND xã Phước Trà as follows:
- Has relationships with 0 project owners.
- Has relationships with 0 contractor.
- Announced 6 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 0 contractor selection plans with a total of 0 bidding packages, of which 0 prequalification documents have not found the investment project.
- Has invited bids for 0 packages (with 0 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 0 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 0 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are packages that have not fully posted the contractor selection results. Of these bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 0%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 0 VND, of which the total winning bid value is: 0 VND.
- The savings rate is: 0%.
Data analysis results of DauThau.info software for bid solicitors Văn phòng HĐND và UBND xã Phước Trà as follows:
- Has relationships with 0 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 0 VND, in which the total winning value is: 0 VND.
- The savings rate is: 0%.
This Bid solicitor is also an investor. The analysis results of data for the investor Văn phòng HĐND và UBND xã Phước Trà are as follows:
- Is the investor of 6 development investment projects.
- Is the investor of 11 contractor selection plans, of which 0 were self-published, and 11 were published by other entities.
- Is the investor of 1 Tender Notices, of which 0 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Project management consultancy .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG KHẢI THỊNH 79
02/01/2026 16:10
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Civil Works .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG TỔNG HỢP AN CƯỜNG
02/01/2026 16:06
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Construction supervision consultancy .
- Winning bidder: CÔNG TY TNHH XÂY DỰNG LTT QUẢNG NAM
02/01/2026 16:00
Văn phòng HĐND và UBND xã Phước Trà publishes the plan Project LCNT plan: Concentrated domestic water in the resettlement area of Tra Nhan village, Phuoc Tra commune with 3 bidding package .
02/01/2026 15:56
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Consultancy, design verification, cost estimation .
- Winning bidder: CÔNG TY CP TƯ VẤN VÀ XÂY DỰNG BÁCH KHOA
02/01/2026 15:41
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Consultantcy on surveying, preparing finance and technical reports .
- Winning bidder: KHAHACO CONSULTING INVESTMENT AND CONSTRUCTION COMPANY LIMITED
02/01/2026 15:37
Văn phòng HĐND và UBND xã Phước Trà announced the results of the bid package Construction project management consulting .
- Winning bidder: CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG KHẢI THỊNH 79
02/01/2026 15:29
Văn phòng HĐND và UBND xã Phước Trà publishes the plan LCNT plan Director of CBĐT: Repair the route from DH3 street to Le Loi school with 3 bidding package .
02/01/2026 15:19
Investor Văn phòng HĐND và UBND xã Phước Trà has posted an investment and development project Repair the route from DH3 street to Le Loi school.
02/01/2026 15:15
Investor Văn phòng HĐND và UBND xã Phước Trà has posted an investment and development project Domestic water is concentrated in the resettlement area of Tra Nhan village, Phuoc Tra commune.
02/01/2026 15:15
The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects