Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN as follows:
- Has relationships with 1 project owners.
- Has relationships with 16 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 20 contractor selection plans with a total of 20 bidding packages, of which 20 prequalification documents have not found the investment project.
- Has invited bids for 9 packages (with 11 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 10 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 11 packages that have not fully posted the contractor selection results. Of these 8 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.71 contractors.
- Breakdown by bidding field: Goods 45.45%, Construction 0%, Consultancy 18.18%, Non-consultancy 36.36%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,548,031,000 VND, of which the total winning bid value is: 4,433,478,908 VND.
- The savings rate is: 2.52%.
Data analysis results of DauThau.info software for bid solicitors VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN as follows:
- Has relationships with 16 contractor.
- The average number of contractors participating in each bidding package is: 1.71 contractors.
- Proportion of bidding fields: Goods 45.45%, Construction 0%, Consulting 18.18%, Non-consulting 36.36%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,548,031,000 VND, in which the total winning value is: 4,433,478,908 VND.
- The savings rate is: 2.52%.
This Bid solicitor is also an investor. The analysis results of data for the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 13 contractor selection plans, of which 13 were self-published, and 0 were published by other entities.
- Is the investor of 9 Tender Notices, of which 8 were self-invited, and 1 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG TUỆ LÂM has posted the results of the bidding package Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: SECURITY SERVICE JOINT STOCK COMPANY
27/12/2024 10:47
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG TUỆ LÂM has posted Tender Notice Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with the form Competitive Offer.
14/12/2024 11:11
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 3 bidding package.
11/12/2024 10:48
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 2 bidding package.
10/12/2024 14:51
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
10/12/2024 14:35
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the results of the bidding package Regarding approval of contractor selection plan
Project, repair estimate: "Treatment of termites, repair and replacement of baseboards on 04 pillars, decorative moldings, podium for Uncle Ho's statue were all attacked by termites at the Administrative Procedures Office of Ngu Hanh Son district" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG THƯƠNG MẠI MANGALAM
05/12/2024 08:36
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
02/12/2024 14:15
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
30/11/2024 15:25
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
30/11/2024 15:00
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the results of the bidding package Procurement and installation of LED screens at meeting room 3 of Ngu Hanh Son District People's Committee of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ TẦM NHÌN
26/09/2024 10:16
The data sheet has been partially hidden, to see the full information please Login or Register
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 with 3 bidding package .
11/12/2024 10:48
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 with 2 bidding package .
10/12/2024 14:51
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 with 1 bidding package .
10/12/2024 14:35
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN announced the results of the bid package Regarding approval of contractor selection plan
Project, repair estimate: "Treatment of termites, repair and replacement of baseboards on 04 pillars, decorative moldings, podium for Uncle Ho's statue were all attacked by termites at the Administrative Procedures Office of Ngu Hanh Son district" .
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG THƯƠNG MẠI MANGALAM
05/12/2024 08:36
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" with 1 bidding package .
02/12/2024 14:15
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" with 1 bidding package .
30/11/2024 15:25
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" with 1 bidding package .
30/11/2024 15:00
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN announced the results of the bid package Procurement and installation of LED screens at meeting room 3 of Ngu Hanh Son District People's Committee .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ TẦM NHÌN
26/09/2024 10:16
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan “Procurement and installation of LED screens at meeting room 3 of Ngu Hanh Son District People's Committee” with 1 bidding package .
26/09/2024 10:08
VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN publishes the plan “Procurement and installation of LED screens at meeting room 3 of Ngu Hanh Son District People's Committee” with 1 bidding package .
26/09/2024 09:51
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG TUỆ LÂM has posted the results of the bidding package Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: SECURITY SERVICE JOINT STOCK COMPANY
27/12/2024 10:47
Bid solicitor CÔNG TY TNHH TƯ VẤN XÂY DỰNG TUỆ LÂM has posted Tender Notice Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with the form Competitive Offer.
14/12/2024 11:11
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 3 bidding package.
11/12/2024 10:48
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 2 bidding package.
10/12/2024 14:51
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Hire professional security services at the district administrative procedures for the implementation period from January 1, 2025 to December 31, 2027 of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
10/12/2024 14:35
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the results of the bidding package Regarding approval of contractor selection plan
Project, repair estimate: "Treatment of termites, repair and replacement of baseboards on 04 pillars, decorative moldings, podium for Uncle Ho's statue were all attacked by termites at the Administrative Procedures Office of Ngu Hanh Son district" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: CÔNG TY CỔ PHẦN XÂY DỰNG THƯƠNG MẠI MANGALAM
05/12/2024 08:36
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
02/12/2024 14:15
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
30/11/2024 15:25
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the request Regarding the approval of the project contractor selection plan and repair estimate: "Treating termites, repairing and replacing baseboards on 04 pillars, decorative moldings, and the podium for Uncle Ho's statue were all attacked by termites at Office of Administrative Procedures Ceremony of Ngu Hanh Son District" of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN with 1 bidding package.
30/11/2024 15:00
The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted the results of the bidding package Procurement and installation of LED screens at meeting room 3 of Ngu Hanh Son District People's Committee of the investor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI VÀ DỊCH VỤ TẦM NHÌN
26/09/2024 10:16
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted 20 of the contractor selection plan, which contains 20 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted 11 Tender Notices in 9 bidding packages. Among these, 7 Tender Notices were self-invited, and 4 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has posted 10 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 10 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has a relationship with 16 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VĂN PHÒNG UBND QUẬN NGŨ HÀNH SƠN has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects