Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Viar as follows:
- Has relationships with 1 project owners.
- Has relationships with 5 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 1 contractor selection plans with a total of 1 bidding packages, of which 1 prequalification documents have not found the investment project.
- Has invited bids for 1 packages (with 1 tender notices), and conducted prequalification for 0 packages.
- There are 0 bidding packages with content that needs clarification.
- Announced the results of 4 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 4 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 1 packages that have not fully posted the contractor selection results. Of these 1 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 0 contractors.
- Breakdown by bidding field: Goods 0%, Construction 100.00%, Consultancy 0%, Non-consultancy 0%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 499,995,975 VND, of which the total winning bid value is: 498,419,675 VND.
- The savings rate is: 0.32%.
Data analysis results of DauThau.info software for bid solicitors Viar as follows:
- Has relationships with 5 contractor.
- The average number of contractors participating in each bidding package is: 0 contractors.
- Proportion of bidding fields: Goods 0%, Construction 100.00%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 499,995,975 VND, in which the total winning value is: 498,419,675 VND.
- The savings rate is: 0.32%.
This Bid solicitor is also an investor. The analysis results of data for the investor Viar are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 2 contractor selection plans, of which 1 were self-published, and 1 were published by other entities.
- Is the investor of 0 Tender Notices, of which 0 were self-invited, and 0 were invited by other entities.
You need to Login or Sign up to view all informations.
- Participated in 302 bidding packages, of which 251 were won, 23 were lost, 20 are pending results, and 8 were canceled.
- Total value of winning bid packages (including joint ventures): VND (In which VND are designated bid packages; VND are bid packages with KQLCNT but no TBMT; VND is bidding packages not linked to the Contractor Selection Plan)
Note: This is the total value of the bid packages that the contractor has won, including bid packages participating as a joint venture. This figure is calculating the total value of the entire joint venture. Because the participation rate in the joint venture is not announced, we do not have the basis to accurately separate the data for each member of the joint venture. The above figures may be larger than the actual figures that the contractor won.
- Total bid-winning value as an independent party: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is bidding packages not linked to the Contractor Selection Plan)
- Total value of bidding packages participated in and won as a consortium: VND (Of which VND is for designated packages; VND is for packages with contractor selection results but no Tender Notice; VND is for packages with contractor selection results but no Tender Notice) (Winning bid value of all consortium members)
- Lowest bid rate when participating: 44.73% (Only calculated based on packages that have published estimated prices or package prices)
- Average bid-winning price compared to the estimated price: 95.16% (Only calculated based on packages that have published estimated prices or package prices)
- Provinces after the merger where the contractor has participated in bidding : Hà Nội (36), Tuyên Quang (32), Huế (26), Phú Thọ (24), Hưng Yên (15), Lâm Đồng (10), Bắc Ninh (9), TP.Hồ Chí Minh (9), Cao Bằng (8), Ninh Bình (8), Lai Châu (8), Đắk Lắk (8), Lạng Sơn (7), Thái Nguyên (7), Hải Phòng (7), Gia Lai (5), Cà Mau (5), Thanh Hoá (4), Đồng Nai (4), Quảng Ninh (4), Quảng Ngãi (3), Lào Cai (2), Vĩnh Long (2), Đà Nẵng (2), Đồng Tháp (2), Khánh Hòa (2), Cần Thơ (1), Nghệ An (1), Sơn La (1), An Giang (1), Undefined (49)
- Provinces before the merger where the contractor has participated in bidding : Hà Nội (36), Huế (26), Hà Giang (24), Vĩnh Phúc (18), Lâm Đồng (10), Thái Bình (10), Tuyên Quang (8), Cao Bằng (8), Lai Châu (8), Lạng Sơn (7), Hải Dương (7), Phú Yên (7), Hà Nam (6), Bình Định (5), Cà Mau (5), Bắc Giang (5), TP.Hồ Chí Minh (5), Hưng Yên (5), Bắc Ninh (4), Thanh Hoá (4), Bắc Kạn (4), Quảng Ninh (4), Bà Rịa - Vũng Tàu (3), Quảng Ngãi (3), Hòa Bình (3), Đồng Nai (2), Bình Phước (2), Ninh Bình (2), Thái Nguyên (2), Lào Cai (2), Bến Tre (2), Đà Nẵng (2), Khánh Hòa (2), Sóc Trăng (1), Bình Dương (1), Tiền Giang (1), Nghệ An (1), Sơn La (1), Phú Thọ (1), Đồng Tháp (1), Đắk Lắk (1), Kiên Giang (1), Undefined (54)
- Has relationships with 159 Bid Solicitors
- Has competed against 102 contractors in 101 bidding packages, won 57 packages, lost 22 packages, 16 are pending results, and 6 were canceled.
- Has collaborated with 57 contractors in 63 bidding packages, won 57 packages, lost 2 packages, 3 are pending results, and 1 were canceled.
- Received 0 penalty decisions due to violations of bidding regulations.
- Participated in consulting for 37 bidding packages with 5 roles.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
Viar announced the results of the bid package Costs for building a model of inter-level boarding schools in land border communes .
- Winning bidder: Trung tâm Bảo tồn Di tích và Di sản Kiến trúc
20/12/2025 17:21
Viar publishes the plan Costs for building a model of inter-level boarding schools in land border communes with 1 bidding package .
20/12/2025 17:12
The Bid solicitor Viar has posted the results of the bidding package Package 01: Supply and installation of working equipment (computers, projectors) (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Package 02: Supply and install tables and chairs (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Package 3 Conference sound system (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Verification of construction drawing design and estimate of adjustment of renovation and upgrading items of the current 5-storey block (Posted on bidding newspaper No. 107 dated 13/06/2017) of the investor Viar.
- Winning bidder: Liên danh Công ty CP Tư vấn phát triển đầu tư Quốc gia và Trung tâm thông tin - Viện Kinh tế xây dựng
13/06/2017 07:17
The Bid solicitor Viar has posted the request Renovating and upgrading scientific research facilities of the National Institute of Architecture of the investor Viar with 1 bidding package.
29/06/2016 11:20
The data sheet has been partially hidden, to see the full information please Login or Register
Viar announced the results of the bid package Package 01: Supply and installation of working equipment (computers, projectors) (Posted on bidding newspaper No. 34 on February 21, 2018) .
- Winning bidder: Công ty TNHH Thương mại ứng dụng công nghệ truyền thông Tân Thanh
21/02/2018 07:29
Viar announced the results of the bid package Package 02: Supply and install tables and chairs (Posted on bidding newspaper No. 34 on February 21, 2018) .
- Winning bidder: Chi nhánh tại Hà Nội – Công ty Cổ phần nội thất Đông Sài Gòn
21/02/2018 07:29
Viar announced the results of the bid package Package 3 Conference sound system (Posted on bidding newspaper No. 34 on February 21, 2018) .
- Winning bidder: Công ty TNHH Kỹ thuật và thiết bị viễn thông
21/02/2018 07:29
Viar announced the results of the bid package Verification of construction drawing design and estimate of adjustment of renovation and upgrading items of the current 5-storey block (Posted on bidding newspaper No. 107 dated 13/06/2017) .
- Winning bidder: Công ty Cổ phần Tư vấn Phát triển Đầu tư Quốc Gia, Viện Kinh tế xây dựng, Liên danh Công ty CP Tư vấn phát triển đầu tư Quốc gia và Trung tâm thông tin - Viện Kinh tế xây dựng
13/06/2017 07:17
Viar publishes Tender Notice Construction, equipment installation and general item costs. (Posted on bidding newspaper No. 165 dated 31/08/2016) in the form National competitive bidding .
31/08/2016 08:40
Viar publishes the plan Renovating and upgrading scientific research facilities of the National Institute of Architecture with 1 bidding package .
29/06/2016 11:20
The data sheet has been partially hidden, to see the full information please Login or Register
Viar announced the results of the bid package Costs for building a model of inter-level boarding schools in land border communes .
- Winning bidder: Trung tâm Bảo tồn Di tích và Di sản Kiến trúc
20/12/2025 17:21
Viar publishes the plan Costs for building a model of inter-level boarding schools in land border communes with 1 bidding package .
20/12/2025 17:12
The Bid solicitor Viar has posted the results of the bidding package Package 01: Supply and installation of working equipment (computers, projectors) (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Package 02: Supply and install tables and chairs (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Package 3 Conference sound system (Posted on bidding newspaper No. 34 on February 21, 2018) of the investor Viar.
21/02/2018 07:29
The Bid solicitor Viar has posted the results of the bidding package Verification of construction drawing design and estimate of adjustment of renovation and upgrading items of the current 5-storey block (Posted on bidding newspaper No. 107 dated 13/06/2017) of the investor Viar.
- Winning bidder: Liên danh Công ty CP Tư vấn phát triển đầu tư Quốc gia và Trung tâm thông tin - Viện Kinh tế xây dựng
13/06/2017 07:17
The Bid solicitor Viar has posted the request Renovating and upgrading scientific research facilities of the National Institute of Architecture of the investor Viar with 1 bidding package.
29/06/2016 11:20
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Viar has posted 1 of the contractor selection plan, which contains 1 of the bidding package. See full list here
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Viar has posted 1 Tender Notices in 1 bidding packages. Among these, 0 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Viar has posted 4 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 4 package, canceled the bid 0 package (among the bidding packages above).
- There are 4 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Viar has a relationship with 5 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Viar has a relationship with 1 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects