Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Viễn thông Hà Nam as follows:
- Has relationships with 1 project owners.
- Has relationships with 88 contractor.
- Announced 84 investment development project, of which 15 projects have not yet announced the prequalification documents.
- Announced 131 contractor selection plans with a total of 157 bidding packages, of which 22 prequalification documents have not found the investment project.
- Has invited bids for 96 packages (with 105 tender notices), and conducted prequalification for 0 packages.
- There are 2 bidding packages with content that needs clarification.
- Announced the results of 139 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 68 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 64 packages that have not fully posted the contractor selection results. Of these 62 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.59 contractors.
- Breakdown by bidding field: Goods 48.57%, Construction 22.86%, Consultancy 23.81%, Non-consultancy 2.86%, Mixed 1.90%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 277,646,478,706 VND, of which the total winning bid value is: 263,831,044,730 VND.
- The savings rate is: 4.98%.
Data analysis results of DauThau.info software for bid solicitors Viễn thông Hà Nam as follows:
- Has relationships with 88 contractor.
- The average number of contractors participating in each bidding package is: 1.59 contractors.
- Proportion of bidding fields: Goods 48.57%, Construction 22.86%, Consulting 23.81%, Non-consulting 2.86%, Mixed 1.90%, Other 0%.
- The total value according to the bidding package with valid IMP is: 277,646,478,706 VND, in which the total winning value is: 263,831,044,730 VND.
- The savings rate is: 4.98%.
This Bid solicitor is also an investor. The analysis results of data for the investor Viễn thông Hà Nam are as follows:
- Is the investor of 84 development investment projects.
- Is the investor of 134 contractor selection plans, of which 128 were self-published, and 6 were published by other entities.
- Is the investor of 62 Tender Notices, of which 60 were self-invited, and 2 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Viễn thông Hà Nam has posted the results of the bidding package Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam.
- Winning bidder: 3C ELECTRIC ELECTRONIC COMPANY LIMITED
25/08/2025 16:11
Investor Viễn thông Hà Nam has posted an investment and development project Ha Nam Telecommunication and Telecommunications Office (phase 2).
08/07/2025 17:17
Bid solicitor Viễn thông Hà Nam has posted Tender Notice Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam with the form Open bidding.
10/06/2025 14:38
The Bid solicitor Viễn thông Hà Nam has posted the request Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam with 1 bidding package.
09/06/2025 17:42
Investor Viễn thông Hà Nam has posted an investment and development project Shopping and installing BTS Outdoor cabinets and Shelter stations to optimize the service quality in 2025.
09/06/2025 17:17
The Bid solicitor Viễn thông Hà Nam has posted the request Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 2). of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:25
The Bid solicitor Viễn thông Hà Nam has posted the request Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 1). of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:19
The Bid solicitor Viễn thông Hà Nam has posted the request Project bidding plan: Construction of Thai Ha industrial park sewers phase 2, Ha Nam telecommunications in 2025 of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:11
Investor Viễn thông Hà Nam has posted an investment and development project Construction of infrastructure of Dong Van III support industrial zone in the eastern Cau Gie - Ninh Binh - VNPT highway in 2025 (phase 1)..
05/05/2025 11:11
Investor Viễn thông Hà Nam has posted an investment and development project Construction of infrastructure of Dong Van III Support Industrial Park on the East of Cau Gie - Ninh Binh - VNPT highway in 2025 (phase 2)..
05/05/2025 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
Viễn thông Hà Nam announced the results of the bid package Shopping and installing BTS Outdoor cabinets and Shelter station houses .
- Winning bidder: 3C ELECTRIC ELECTRONIC COMPANY LIMITED
25/08/2025 16:11
Viễn thông Hà Nam announced the results of the bidding package Shopping and installing BTS Outdoor cabinets and Shelter station houses with 1 participating contractors .
19/06/2025 17:45
Viễn thông Hà Nam publishes Tender Notice Shopping and installing BTS Outdoor cabinets and Shelter station houses in the form Open bidding .
10/06/2025 14:38
Viễn thông Hà Nam publishes the plan Shopping and installing BTS Outdoor cabinets and Shelter station houses with 1 bidding package .
09/06/2025 17:42
Viễn thông Hà Nam publishes the plan Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 2). with 3 bidding package .
05/05/2025 11:25
Viễn thông Hà Nam publishes the plan Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 1). with 3 bidding package .
05/05/2025 11:19
Viễn thông Hà Nam publishes the plan Project bidding plan: Construction of Thai Ha industrial park sewers phase 2, Ha Nam telecommunications in 2025 with 3 bidding package .
05/05/2025 11:11
Viễn thông Hà Nam announced the results of the bid package Consulting for project economic formation: Construction of Thai Ha industrial park sewers phase 2, Ha Nam telecommunications in 2025 .
- Winning bidder: POST AND TELECOMMUNICATION CONSTRUCTION CONSULTANT JOINT STOCK COMPANY
05/05/2025 10:35
Viễn thông Hà Nam publishes the plan Project bidding plan: Construction of Thai Ha industrial park sewers phase 2, Ha Nam telecommunications in 2025 with 1 bidding package .
05/05/2025 10:33
Viễn thông Hà Nam publishes the plan Bidding plan: Construction of Yen Lenh industrial clusters (phase 2), Ha Nam telecommunications in 2025 with 3 bidding package .
29/04/2025 10:27
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Viễn thông Hà Nam has posted the results of the bidding package Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam.
- Winning bidder: 3C ELECTRIC ELECTRONIC COMPANY LIMITED
25/08/2025 16:11
Investor Viễn thông Hà Nam has posted an investment and development project Ha Nam Telecommunication and Telecommunications Office (phase 2).
08/07/2025 17:17
Bid solicitor Viễn thông Hà Nam has posted Tender Notice Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam with the form Open bidding.
10/06/2025 14:38
The Bid solicitor Viễn thông Hà Nam has posted the request Shopping and installing BTS Outdoor cabinets and Shelter station houses of the investor Viễn thông Hà Nam with 1 bidding package.
09/06/2025 17:42
Investor Viễn thông Hà Nam has posted an investment and development project Shopping and installing BTS Outdoor cabinets and Shelter stations to optimize the service quality in 2025.
09/06/2025 17:17
The Bid solicitor Viễn thông Hà Nam has posted the request Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 2). of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:25
The Bid solicitor Viễn thông Hà Nam has posted the request Contractor of the project of construction of Dong Van III Support Infrastructure Infrastructure, Dong Van III East Cau Gie - Ninh Binh - VNPT Expressway 2025 (phase 1). of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:19
The Bid solicitor Viễn thông Hà Nam has posted the request Project bidding plan: Construction of Thai Ha industrial park sewers phase 2, Ha Nam telecommunications in 2025 of the investor Viễn thông Hà Nam with 3 bidding package.
05/05/2025 11:11
Investor Viễn thông Hà Nam has posted an investment and development project Construction of infrastructure of Dong Van III support industrial zone in the eastern Cau Gie - Ninh Binh - VNPT highway in 2025 (phase 1)..
05/05/2025 11:11
Investor Viễn thông Hà Nam has posted an investment and development project Construction of infrastructure of Dong Van III Support Industrial Park on the East of Cau Gie - Ninh Binh - VNPT highway in 2025 (phase 2)..
05/05/2025 11:11
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Viễn thông Hà Nam has posted 131 of the contractor selection plan, which contains 157 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Viễn thông Hà Nam has posted 105 Tender Notices in 96 bidding packages. Among these, 104 Tender Notices were self-invited, and 1 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Viễn thông Hà Nam has posted 139 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 139 package, canceled the bid 0 package (among the bidding packages above).
- There are 68 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Viễn thông Hà Nam has a relationship with 88 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Viễn thông Hà Nam has a relationship with 12 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Viễn thông Hà Nam has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects