Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VIỄN THÔNG KIÊN GIANG as follows:
- Has relationships with 1 project owners.
- Has relationships with 90 contractor.
- Announced 41 investment development project, of which 7 projects have not yet announced the prequalification documents.
- Announced 427 contractor selection plans with a total of 666 bidding packages, of which 241 prequalification documents have not found the investment project.
- Has invited bids for 72 packages (with 77 tender notices), and conducted prequalification for 0 packages.
- There are 1 bidding packages with content that needs clarification.
- Announced the results of 199 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 142 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 255 packages that have not fully posted the contractor selection results. Of these 253 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 2.31 contractors.
- Breakdown by bidding field: Goods 71.43%, Construction 18.18%, Consultancy 0%, Non-consultancy 3.90%, Mixed 6.49%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 220,211,998,260 VND, of which the total winning bid value is: 209,251,892,753 VND.
- The savings rate is: 4.98%.
Data analysis results of DauThau.info software for bid solicitors VIỄN THÔNG KIÊN GIANG as follows:
- Has relationships with 90 contractor.
- The average number of contractors participating in each bidding package is: 2.31 contractors.
- Proportion of bidding fields: Goods 71.43%, Construction 18.18%, Consulting 0%, Non-consulting 3.90%, Mixed 6.49%, Other 0%.
- The total value according to the bidding package with valid IMP is: 220,211,998,260 VND, in which the total winning value is: 209,251,892,753 VND.
- The savings rate is: 4.98%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIỄN THÔNG KIÊN GIANG are as follows:
- Is the investor of 41 development investment projects.
- Is the investor of 445 contractor selection plans, of which 423 were self-published, and 22 were published by other entities.
- Is the investor of 72 Tender Notices, of which 63 were self-invited, and 9 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VIỄN THÔNG KIÊN GIANG publishes the plan Underground the telecommunication cable system at Mai Van Tung and Nguyen Hung Hiep route in Chau Thanh commune, Chau Thanh - Kien Giang Telecommunications Center in 2025 with 2 bidding package .
12/09/2025 16:53
VIỄN THÔNG KIÊN GIANG publishes the plan The plan to select a contractor of survey consultancy, project economic economic report: underground the telecommunication cable system at Mai Van Tung and Nguyen Hung Hiep route in Chau Thanh commune, Chau Thanh Telecommunications - Kien Giang Telecommunications in 2025. with 1 bidding package .
12/09/2025 16:42
VIỄN THÔNG KIÊN GIANG publishes the plan Equipped with 28 12KVA 1 -phase generators for the development of 28 million macro for the locations of NOTEB/ENODEB deployment - Kien Giang Telecommunications in 2025 with 1 bidding package .
12/09/2025 16:37
VIỄN THÔNG KIÊN GIANG publishes the plan TCXL; Supervision and audit (095p2500 36 095) with 3 bidding package .
11/09/2025 16:59
VIỄN THÔNG KIÊN GIANG publishes the plan Design consultancy and drawing consultant (095p2500 36 095) with 2 bidding package .
11/09/2025 16:43
VIỄN THÔNG KIÊN GIANG publishes the plan TCXL and Auditing (095p2500 35 095) with 2 bidding package .
10/09/2025 16:40
VIỄN THÔNG KIÊN GIANG publishes the plan Investment in shopping expansion of data storage drive of VNPT HIS system at Kien Giang General Hospital - Kien Giang Telecommunications in 2025 with 1 bidding package .
10/09/2025 16:23
VIỄN THÔNG KIÊN GIANG publishes the plan Design consulting (095p2500 35 095) with 1 bidding package .
10/09/2025 16:20
VIỄN THÔNG KIÊN GIANG publishes the plan Investing in new replacement 18 antennas to ensure safety against natural disasters in the border area of the island - Telecommunications Kien Giang in 2025 with 3 bidding package .
10/09/2025 10:31
VIỄN THÔNG KIÊN GIANG publishes the plan Investing in replacing 15 antennas to ensure safety against natural disasters in Ca Mau peninsula - Kien Giang Telecommunications in 2025 with 3 bidding package .
10/09/2025 09:26
The data sheet has been partially hidden, to see the full information please Login or Register
VIỄN THÔNG KIÊN GIANG publishes the plan Consulting on making technical and technical reports and examining (095p2500 27 095) with 2 bidding package .
25/07/2025 14:48
VIỄN THÔNG KIÊN GIANG publishes the plan Survey consultancy, Economic - Technical Report (095p2500 25 095) with 1 bidding package .
22/07/2025 15:00
VIỄN THÔNG KIÊN GIANG publishes the plan Rubs labor at units under Kien Giang Telecommunications in 2025 with 1 bidding package .
10/07/2025 15:53
VIỄN THÔNG KIÊN GIANG publishes the plan Building a Gpon optical cable network in Palm Garden Shop Villas - TTVT Phu Quoc - Kien Giang Telecommunications in 2025 with 3 bidding package .
17/06/2025 20:52
VIỄN THÔNG KIÊN GIANG publishes the plan Plan for selecting survey consultancy contractors, preparing economic and technical reports projects on construction of Gpon optical cable network of Palm Garden Shop Villas - TTVT Phu Quoc - Kien Giang Telecommunications in 2025 with 1 bidding package .
17/06/2025 20:41
VIỄN THÔNG KIÊN GIANG publishes the plan Building a Gpon optical cable network of Marina Square urban area - Phu Quoc TTVT - Kien Giang Telecommunications in 2025 with 3 bidding package .
17/06/2025 16:23
VIỄN THÔNG KIÊN GIANG publishes the plan The plan to select a contractor for survey consultancy, making economic and technical reports on building a GPON optical cable network of Marina Square urban area - TTVT Phu Quoc - Kien Giang Telecommunications in 2025 with 1 bidding package .
17/06/2025 16:03
VIỄN THÔNG KIÊN GIANG publishes the plan Investment to replace the Controller device for the system of VNPT HIS system at Kien Giang General Hospital with 1 bidding package .
17/06/2025 14:53
VIỄN THÔNG KIÊN GIANG publishes the plan Investing in the system of industrial fiber optimal cable trays optimally transmitting the information management center - Kien Giang Telecommunications in 2025 with 1 bidding package .
30/05/2025 15:00
VIỄN THÔNG KIÊN GIANG publishes the plan Maintenance of Kien Giang telecommunications generator in 2025 with 1 bidding package .
27/05/2025 08:05
The data sheet has been partially hidden, to see the full information please Login or Register
VIỄN THÔNG KIÊN GIANG publishes the plan Underground the telecommunication cable system at Mai Van Tung and Nguyen Hung Hiep route in Chau Thanh commune, Chau Thanh - Kien Giang Telecommunications Center in 2025 with 2 bidding package .
12/09/2025 16:53
VIỄN THÔNG KIÊN GIANG publishes the plan The plan to select a contractor of survey consultancy, project economic economic report: underground the telecommunication cable system at Mai Van Tung and Nguyen Hung Hiep route in Chau Thanh commune, Chau Thanh Telecommunications - Kien Giang Telecommunications in 2025. with 1 bidding package .
12/09/2025 16:42
VIỄN THÔNG KIÊN GIANG publishes the plan Equipped with 28 12KVA 1 -phase generators for the development of 28 million macro for the locations of NOTEB/ENODEB deployment - Kien Giang Telecommunications in 2025 with 1 bidding package .
12/09/2025 16:37
VIỄN THÔNG KIÊN GIANG publishes the plan TCXL; Supervision and audit (095p2500 36 095) with 3 bidding package .
11/09/2025 16:59
VIỄN THÔNG KIÊN GIANG publishes the plan Design consultancy and drawing consultant (095p2500 36 095) with 2 bidding package .
11/09/2025 16:43
VIỄN THÔNG KIÊN GIANG publishes the plan TCXL and Auditing (095p2500 35 095) with 2 bidding package .
10/09/2025 16:40
VIỄN THÔNG KIÊN GIANG publishes the plan Investment in shopping expansion of data storage drive of VNPT HIS system at Kien Giang General Hospital - Kien Giang Telecommunications in 2025 with 1 bidding package .
10/09/2025 16:23
VIỄN THÔNG KIÊN GIANG publishes the plan Design consulting (095p2500 35 095) with 1 bidding package .
10/09/2025 16:20
VIỄN THÔNG KIÊN GIANG publishes the plan Investing in new replacement 18 antennas to ensure safety against natural disasters in the border area of the island - Telecommunications Kien Giang in 2025 with 3 bidding package .
10/09/2025 10:31
VIỄN THÔNG KIÊN GIANG publishes the plan Investing in replacing 15 antennas to ensure safety against natural disasters in Ca Mau peninsula - Kien Giang Telecommunications in 2025 with 3 bidding package .
10/09/2025 09:26
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIỄN THÔNG KIÊN GIANG has posted 427 of the contractor selection plan, which contains 666 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIỄN THÔNG KIÊN GIANG has posted 77 Tender Notices in 72 bidding packages. Among these, 47 Tender Notices were self-invited, and 30 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIỄN THÔNG KIÊN GIANG has posted 199 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 199 package, canceled the bid 0 package (among the bidding packages above).
- There are 142 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIỄN THÔNG KIÊN GIANG has a relationship with 90 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIỄN THÔNG KIÊN GIANG has a relationship with 6 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIỄN THÔNG KIÊN GIANG has a relationship with 2 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects