Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 as follows:
- Has relationships with 2 project owners.
- Has relationships with 130 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 13 contractor selection plans with a total of 18 bidding packages, of which 11 prequalification documents have not found the investment project.
- Has invited bids for 61 packages (with 81 tender notices), and conducted prequalification for 0 packages.
- There are 35 bidding packages with content that needs clarification.
- Announced the results of 67 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 8 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 7 packages that have not fully posted the contractor selection results. Of these 7 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 3.03 contractors.
- Breakdown by bidding field: Goods 41.98%, Construction 2.47%, Consultancy 18.52%, Non-consultancy 7.41%, Mixed 29.63%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 4,628,313,058,898 VND, of which the total winning bid value is: 4,047,296,349,888 VND.
- The savings rate is: 12.55%.
Data analysis results of DauThau.info software for bid solicitors VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 as follows:
- Has relationships with 130 contractor.
- The average number of contractors participating in each bidding package is: 3.03 contractors.
- Proportion of bidding fields: Goods 41.98%, Construction 2.47%, Consulting 18.52%, Non-consulting 7.41%, Mixed 29.63%, Other 0%.
- The total value according to the bidding package with valid IMP is: 4,628,313,058,898 VND, in which the total winning value is: 4,047,296,349,888 VND.
- The savings rate is: 12.55%.
This Bid solicitor is also an investor. The analysis results of data for the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 are as follows:
- Is the investor of 1 development investment projects.
- Is the investor of 29 contractor selection plans, of which 9 were self-published, and 20 were published by other entities.
- Is the investor of 12 Tender Notices, of which 3 were self-invited, and 9 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 publishes the plan Contractor selection plan for Package 03-CPB2025 "Sewing uniforms and labor protection equipment for officers and employees of the 1st Year 2025 Electricity Project Management Board" with 1 bidding package .
15/12/2025 16:33
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 1ms-D10: Purchase air-conditioning equipment at the office of the D10 building of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG VÀ XÂY DỰNG SỐ 18
16/07/2025 14:08
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 2xL-D10: Construction and installation of interior finishing of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: HOANG GIANG CONSTRUCTION AND ARCHITECTURE COMPANY LIMITED
16/07/2025 10:19
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 1XL-D10: Construction and repair of headquarters at D10 building of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: ACK Architecture and Contruction Joint Stock Company
14/07/2025 09:12
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package Package No. 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: CÔNG TY TNHH ÁNH DƯƠNG
11/07/2025 21:26
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Repairing the office of the office, moving office equipment of the Power Project Management Board 1 at D10 Duy Tien Building - Thanh Xuan Bac Ward - Thanh Xuan District - Hanoi City of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 4 bidding package.
25/06/2025 11:00
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package Package No. 02-CPB2025 "Equipped with laptops, printers for employees to implement at the construction site" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
08/05/2025 08:44
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted Tender Notice Tender package No 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with the form Competitive Offer.
29/04/2025 16:08
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Package No. 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 1 bidding package.
23/04/2025 14:18
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Package No. 02-CPB2025 "Equipped with laptops, printers for employees to implement at the construction site" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 1 bidding package.
23/04/2025 14:00
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package 1ms-D10: Purchase air-conditioning equipment at the office of the D10 building .
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG VÀ XÂY DỰNG SỐ 18
16/07/2025 14:08
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package 2xL-D10: Construction and installation of interior finishing .
- Winning bidder: HOANG GIANG CONSTRUCTION AND ARCHITECTURE COMPANY LIMITED
16/07/2025 10:19
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package 1XL-D10: Construction and repair of headquarters at D10 building .
- Winning bidder: ACK Architecture and Contruction Joint Stock Company
14/07/2025 09:12
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package Package No. 01-CPB2025: "Providing stationery and office equipment in 2025" .
- Winning bidder: CÔNG TY TNHH ÁNH DƯƠNG
11/07/2025 21:26
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package Bidding package No. 2TV-DZ500LB: Consulting in verification of feasibility study reports .
- Winning bidder: POWER ENGINEERING CONSULTING JOINT STOCK COMPANY 1
10/07/2025 16:39
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package Bidding package No. 5PTV-HB: Measuring and testing samples of electricity measurement system .
- Winning bidder: Viet Nam Metrology Institute
03/07/2025 11:05
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bidding package Bidding package No. 2TV-DZ500LB: Consulting in verification of feasibility study reports with 2 participating contractors .
28/06/2025 17:24
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 publishes the plan Repairing the office of the office, moving office equipment of the Power Project Management Board 1 at D10 Duy Tien Building - Thanh Xuan Bac Ward - Thanh Xuan District - Hanoi City with 4 bidding package .
25/06/2025 11:00
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bidding package Bidding package No. 5PTV-HB: Measuring and testing samples of electricity measurement system with 1 participating contractors .
20/06/2025 15:38
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 announced the results of the bid package 1PTV-DZ500LC: Equipment correction experiments .
- Winning bidder: NORTHERN ELECTRICAL TESTING ONE MEMBER COMPANY LIMITED
19/06/2025 16:58
The data sheet has been partially hidden, to see the full information please Login or Register
VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 publishes the plan Contractor selection plan for Package 03-CPB2025 "Sewing uniforms and labor protection equipment for officers and employees of the 1st Year 2025 Electricity Project Management Board" with 1 bidding package .
15/12/2025 16:33
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 1ms-D10: Purchase air-conditioning equipment at the office of the D10 building of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: CÔNG TY CỔ PHẦN MÔI TRƯỜNG VÀ XÂY DỰNG SỐ 18
16/07/2025 14:08
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 2xL-D10: Construction and installation of interior finishing of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: HOANG GIANG CONSTRUCTION AND ARCHITECTURE COMPANY LIMITED
16/07/2025 10:19
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package 1XL-D10: Construction and repair of headquarters at D10 building of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: ACK Architecture and Contruction Joint Stock Company
14/07/2025 09:12
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package Package No. 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
- Winning bidder: CÔNG TY TNHH ÁNH DƯƠNG
11/07/2025 21:26
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Repairing the office of the office, moving office equipment of the Power Project Management Board 1 at D10 Duy Tien Building - Thanh Xuan Bac Ward - Thanh Xuan District - Hanoi City of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 4 bidding package.
25/06/2025 11:00
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the results of the bidding package Package No. 02-CPB2025 "Equipped with laptops, printers for employees to implement at the construction site" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1.
08/05/2025 08:44
Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted Tender Notice Tender package No 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with the form Competitive Offer.
29/04/2025 16:08
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Package No. 01-CPB2025: "Providing stationery and office equipment in 2025" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 1 bidding package.
23/04/2025 14:18
The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted the request Package No. 02-CPB2025 "Equipped with laptops, printers for employees to implement at the construction site" of the investor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 with 1 bidding package.
23/04/2025 14:00
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted 13 of the contractor selection plan, which contains 18 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted 81 Tender Notices in 61 bidding packages. Among these, 3 Tender Notices were self-invited, and 78 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has posted 67 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 67 package, canceled the bid 0 package (among the bidding packages above).
- There are 8 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has a relationship with 130 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has a relationship with 29 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity VIETNAM ELECTRICITY POWER PROJECTS MANAGEMENT BOARD NO.1 has a relationship with 3 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects