Contact Us
- 0904.634.288, 024.8888.4288
- contact@dauthau.asia
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Search results do not match? Click Reset to perform a new search
Data analysis results of DauThau.info software for bid solicitors Vietnam Electricity Power Projects Management Board No2 as follows:
- Has relationships with 4 project owners.
- Has relationships with 121 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 94 contractor selection plans with a total of 332 bidding packages, of which 67 prequalification documents have not found the investment project.
- Has invited bids for 93 packages (with 108 tender notices), and conducted prequalification for 1 packages.
- There are 13 bidding packages with content that needs clarification.
- Announced the results of 118 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 41 packages with results that do not have tender notice or prequalification notice.
- There are 0 packages with results that do not have Contractor selection plan.
- There are 199 packages that have not fully posted the contractor selection results. Of these 191 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.75 contractors.
- Breakdown by bidding field: Goods 7.41%, Construction 14.81%, Consultancy 44.44%, Non-consultancy 19.44%, Mixed 11.11%, Other fields 2.79%.
- The total value according to the packages with valid contractor selection results is: 42,537,322,749,197 VND, of which the total winning bid value is: 41,623,524,801,423 VND.
- The savings rate is: 2.15%.
Data analysis results of DauThau.info software for bid solicitors Vietnam Electricity Power Projects Management Board No2 as follows:
- Has relationships with 121 contractor.
- The average number of contractors participating in each bidding package is: 1.75 contractors.
- Proportion of bidding fields: Goods 7.41%, Construction 14.81%, Consulting 44.44%, Non-consulting 19.44%, Mixed 11.11%, Other 2.79%.
- The total value according to the bidding package with valid IMP is: 42,537,322,749,197 VND, in which the total winning value is: 41,623,524,801,423 VND.
- The savings rate is: 2.15%.
This Bid solicitor is also an investor. The analysis results of data for the investor Vietnam Electricity Power Projects Management Board No2 are as follows:
- Is the investor of 0 development investment projects.
- Is the investor of 27 contractor selection plans, of which 27 were self-published, and 0 were published by other entities.
- Is the investor of 10 Tender Notices, of which 10 were self-invited, and 0 were invited by other entities.
| Evaluation criteria | Evaluation score |
|---|---|
| Experience | ??? |
| Financial capacity | ??? |
| Transparency of the investor/bidder | ??? |
| Bidding efficiency | ??? |
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the request Bidding contractor selection plan: Equipment of labor protection for forces preparing for the production of Quang Trach I Thermal Power Plant recruiting the second phase of 2024 of the investor Vietnam Electricity Power Projects Management Board No2 with 1 bidding package.
25/04/2025 09:30
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the request Plan to select contractors for the package: Cleaning services at the Management Board of Quang Trach Power Center in 2024 of the investor Vietnam Electricity Power Projects Management Board No2 with 1 bidding package.
12/12/2023 15:26
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package 49 (TV-26): Consulting on insurance program development, setting up terms of reference of insurance bidding documents, assisting in bid evaluation and contract negotiation of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 10:22
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 46 (TV-25): Verification of construction drawing design documents of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 10:07
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 45 (TV-24): Technical survey of handling toxic chemicals (OB) of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 09:59
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package 39 (XL-07): Supply of equipment, construction and installation, testing of line calibration and expansion of distribution station of the investor Vietnam Electricity Power Projects Management Board No2.
27/01/2023 11:09
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 25 (PTV-03): Construction Insurance of the investor Vietnam Electricity Power Projects Management Board No2.
31/08/2022 08:27
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 33 (TV16-Instrumentation): Planning and supervising the clearance and handling of bombs and mines and explosives on the site of Quang Trach II Thermal Power Plant of the investor Vietnam Electricity Power Projects Management Board No2.
11/08/2022 10:30
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 31 (TV13-QT1): Consultancy and verification of adjustment documents for construction investment project of Quang Trach I Thermal Power Plant of the investor Vietnam Electricity Power Projects Management Board No2.
10/08/2022 09:28
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 05 (TV-05): Consultancy on verification of technical design, verification of technical budget - Construction cost estimate of the investor Vietnam Electricity Power Projects Management Board No2.
02/08/2022 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Electricity Power Projects Management Board No2 publishes the plan Bidding contractor selection plan: Equipment of labor protection for forces preparing for the production of Quang Trach I Thermal Power Plant recruiting the second phase of 2024 with 1 bidding package .
25/04/2025 09:30
Vietnam Electricity Power Projects Management Board No2 publishes the plan Plan to select contractors for the package: Cleaning services at the Management Board of Quang Trach Power Center in 2024 with 1 bidding package .
12/12/2023 15:26
Vietnam Electricity Power Projects Management Board No2 announced the results of the bid package Package 49 (TV-26): Consulting on insurance program development, setting up terms of reference of insurance bidding documents, assisting in bid evaluation and contract negotiation .
- Winning bidder: Công ty TNHH Môi giới bảo hiểm Marsh Việt Nam
30/03/2023 10:22
Vietnam Electricity Power Projects Management Board No2 announced the results of the bid package Package No. 46 (TV-25): Verification of construction drawing design documents .
- Winning bidder: Công ty TNHH Tư vấn xây dựng Sông Đà Ucrin
30/03/2023 10:07
Vietnam Electricity Power Projects Management Board No2 announced the results of the bid package Package No. 45 (TV-24): Technical survey of handling toxic chemicals (OB) .
- Winning bidder: Trung tâm Xử lý bom, mìn và môi trường - Quân đoàn 3
30/03/2023 09:59
Vietnam Electricity Power Projects Management Board No2 announced the results of the bidding package Tender package No 07 (TB-01): Supplying the first equipment with 3 participating contractors .
01/02/2023 10:18
Vietnam Electricity Power Projects Management Board No2 announced the results of the bid package Package 39 (XL-07): Supply of equipment, construction and installation, testing of line calibration and expansion of distribution station .
- Winning bidder: CÔNG TY CỔ PHẦN TẬP ĐOÀN PC1
27/01/2023 11:09
Vietnam Electricity Power Projects Management Board No2 publishes Tender Notice Tender package No 07 (TB-01): Supplying the first equipment in the form National competitive bidding .
14/09/2022 18:55
Vietnam Electricity Power Projects Management Board No2 publishes the plan Adjustment of contents of LCA, package No. 07 (TB-01) with 1 bidding package .
14/09/2022 15:55
Vietnam Electricity Power Projects Management Board No2 announced the results of the bid package Package No. 25 (PTV-03): Construction Insurance .
31/08/2022 08:27
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the request Bidding contractor selection plan: Equipment of labor protection for forces preparing for the production of Quang Trach I Thermal Power Plant recruiting the second phase of 2024 of the investor Vietnam Electricity Power Projects Management Board No2 with 1 bidding package.
25/04/2025 09:30
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the request Plan to select contractors for the package: Cleaning services at the Management Board of Quang Trach Power Center in 2024 of the investor Vietnam Electricity Power Projects Management Board No2 with 1 bidding package.
12/12/2023 15:26
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package 49 (TV-26): Consulting on insurance program development, setting up terms of reference of insurance bidding documents, assisting in bid evaluation and contract negotiation of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 10:22
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 46 (TV-25): Verification of construction drawing design documents of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 10:07
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 45 (TV-24): Technical survey of handling toxic chemicals (OB) of the investor Vietnam Electricity Power Projects Management Board No2.
30/03/2023 09:59
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package 39 (XL-07): Supply of equipment, construction and installation, testing of line calibration and expansion of distribution station of the investor Vietnam Electricity Power Projects Management Board No2.
27/01/2023 11:09
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 25 (PTV-03): Construction Insurance of the investor Vietnam Electricity Power Projects Management Board No2.
31/08/2022 08:27
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 33 (TV16-Instrumentation): Planning and supervising the clearance and handling of bombs and mines and explosives on the site of Quang Trach II Thermal Power Plant of the investor Vietnam Electricity Power Projects Management Board No2.
11/08/2022 10:30
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 31 (TV13-QT1): Consultancy and verification of adjustment documents for construction investment project of Quang Trach I Thermal Power Plant of the investor Vietnam Electricity Power Projects Management Board No2.
10/08/2022 09:28
The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted the results of the bidding package Package No. 05 (TV-05): Consultancy on verification of technical design, verification of technical budget - Construction cost estimate of the investor Vietnam Electricity Power Projects Management Board No2.
02/08/2022 17:01
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Vietnam Electricity Power Projects Management Board No2 has posted 94 of the contractor selection plan, which contains 332 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Electricity Power Projects Management Board No2 posted 1 Prequalifying Invitation Notice. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted 108 Tender Notices in 93 bidding packages. Among these, 2 Tender Notices were self-invited, and 106 Tender Notices were invited on behalf of other investors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has posted 118 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 118 package, canceled the bid 0 package (among the bidding packages above).
- There are 41 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has a relationship with 121 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Electricity Power Projects Management Board No2 has a relationship with 21 consulting units. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The procuring entity Vietnam Electricity Power Projects Management Board No2 has a relationship with 5 investors. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
[VIDEO] Guide for Bid Solicitors to Extend the Prequalification Document Submission Date for PPP Projects