Data analysis results of DauThau.info software for bid solicitors Vietnam Inland Waterway Administration as follows:
- Has relationships with 97 contractor.
- Announced 1 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 136 contractor selection plans with a total of 562 bidding packages, of which 131 prequalification documents have not found the investment project.
- Has invited bids for 261 packages (with 281 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 245 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 1 packages with results that do not have tender notice or prequalification notice.
- There are 324 packages that have not fully posted the contractor selection results. Of these 311 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.54 contractors.
- Breakdown by bidding field: Goods 6.05%, Construction 22.78%, Consultancy 27.76%, Non-consultancy 43.42%, Mixed 0%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 1,798,729,371,721 VND, of which the total winning bid value is: 1,728,285,405,323 VND.
- The savings rate is: 3.92%.
Data analysis results of DauThau.info software for bid solicitors Vietnam Inland Waterway Administration as follows:
- Has relationships with 97 contractor.
- The average number of contractors participating in each bidding package is: 1.54 contractors.
- Proportion of bidding fields: Goods 6.05%, Construction 22.78%, Consulting 27.76%, Non-consulting 43.42%, Mixed 0%, Other 0%.
- The total value according to the bidding package with valid IMP is: 1,798,729,371,721 VND, in which the total winning value is: 1,728,285,405,323 VND.
- The savings rate is: 3.92%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 1 investment and development projects.
- As the owner of 101 Contractor selection plan in which 99 Contractor selection plan is self-published, and 2 Contractor selection plan is posted by other units.
- Being the investor of 281 bidding packages in which 281 packages are self-invited, and 0 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package XL.TTBHMN-04: Construction and replacement of signs in MN area 04-2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: INLAND WATERWAY MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO.14
22/10/2024 09:45
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package QLDA.TTBHMN-04: Consulting on project management for replacing and installing signs in MN area 04 - 2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: ATP CONSULTANT INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
22/10/2024 09:30
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package TVGS.TTBHMN-04: Construction supervision consultancyConstruction, replacement and installation of signs in MN area 04 - year 2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: SOUTHERN WATERWAY ROAD CONSTRUCTION CONSULTING JOINT STOCK COMPANY
22/10/2024 09:27
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TTBH-MB03-BH: Construction work: Replacing signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh Palace to Ta Bu) of the investor Vietnam Inland Waterway Administration with the form Open bidding.
17/10/2024 15:24
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TTBH-MB03.MC: Construction work: Reinforcement of signal column foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) of the investor Vietnam Inland Waterway Administration with the form Open bidding.
17/10/2024 15:24
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Plan for selecting contractors for projects: Replacement of signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh to Ta Bu); Reinforcement of signal pole foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) of the investor Vietnam Inland Waterway Administration with 2 bidding package.
17/10/2024 11:26
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Project contractor selection plan: Dredging to ensure Ong Doc river traffic (section from Km3+650 – Km6+100; Km9+100 – Km9+350; Km15+100 – Km49+500) of the investor Vietnam Inland Waterway Administration with 12 bidding package.
14/10/2024 10:33
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice XL.TTSH-SD: Clearing Cong Thon rock site km 58+000 left bank of Duong river; rocky beach km 180+400; km 182+600 Red River; Hai Boi rock beach km 194+000 and regulate and control traffic to serve construction of the investor Vietnam Inland Waterway Administration with the form Open bidding.
09/10/2024 15:03
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TVGS.TTSH-SD: Construction supervision consultancy for projects: Clearing Cong Thon rock site km 58+000 left bank of Duong river; Clearance of stone dump km 180+400; km 182+600 Red River; Clearing Hai Boi rock site km194+000 Red River of the investor Vietnam Inland Waterway Administration with the form Open bidding.
07/10/2024 15:24
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Plan for selecting contractors for construction packages of works: Clearing Cong Thon rock site km 58+000 left bank of Duong River; Clearance of rock dump km 180+400; km 182+600 Red River; Clearing Hai Boi rock site km194+000 Red River of the investor Vietnam Inland Waterway Administration with 4 bidding package.
07/10/2024 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
Vietnam Inland Waterway Administration announced the results of the bidding package TVGS.TTSH-SD: Construction supervision consultancy for projects: Clearing Cong Thon rock site km 58+000 left bank of Duong river; Clearance of stone dump km 180+400; km 182+600 Red River; Clearing Hai Boi rock site km194+000 Red River with 1 participating contractors .
25/10/2024 11:06
Vietnam Inland Waterway Administration announced the results of the bid package XL.TTBHMN-04: Construction and replacement of signs in MN area 04-2024 .
- Winning bidder: INLAND WATERWAYS MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO.12., INLAND WATERWAY MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO.14
22/10/2024 09:45
Vietnam Inland Waterway Administration announced the results of the bid package QLDA.TTBHMN-04: Consulting on project management for replacing and installing signs in MN area 04 - 2024 .
- Winning bidder: ATP CONSULTANT INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
22/10/2024 09:30
Vietnam Inland Waterway Administration announced the results of the bid package TVGS.TTBHMN-04: Construction supervision consultancyConstruction, replacement and installation of signs in MN area 04 - year 2024 .
- Winning bidder: SOUTHERN WATERWAY ROAD CONSTRUCTION CONSULTING JOINT STOCK COMPANY
22/10/2024 09:27
Vietnam Inland Waterway Administration announced the results of the bidding package XL.TTSH-SD: Clearing Cong Thon rock site km 58+000 left bank of Duong river; rocky beach km 180+400; km 182+600 Red River; Hai Boi rock beach km 194+000 and regulate and control traffic to serve construction with 1 participating contractors .
21/10/2024 10:12
Vietnam Inland Waterway Administration publishes Tender Notice TTBH-MB03-BH: Construction work: Replacing signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh Palace to Ta Bu) in the form Open bidding .
17/10/2024 15:24
Vietnam Inland Waterway Administration publishes Tender Notice TTBH-MB03.MC: Construction work: Reinforcement of signal column foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) in the form Open bidding .
17/10/2024 15:24
Vietnam Inland Waterway Administration publishes the plan Plan for selecting contractors for projects: Replacement of signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh to Ta Bu); Reinforcement of signal pole foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) with 2 bidding package .
17/10/2024 11:26
Vietnam Inland Waterway Administration publishes the plan Project contractor selection plan: Dredging to ensure Ong Doc river traffic (section from Km3+650 – Km6+100; Km9+100 – Km9+350; Km15+100 – Km49+500) with 12 bidding package .
14/10/2024 10:33
Vietnam Inland Waterway Administration announced the results of the bidding package TVGS.TTBHMN-04: Construction supervision consultancyConstruction, replacement and installation of signs in MN area 04 - year 2024 with 1 participating contractors .
11/10/2024 10:02
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package XL.TTBHMN-04: Construction and replacement of signs in MN area 04-2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: INLAND WATERWAY MANAGEMENT MAINTENANCE JOINT STOCK COMPANY NO.14
22/10/2024 09:45
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package QLDA.TTBHMN-04: Consulting on project management for replacing and installing signs in MN area 04 - 2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: ATP CONSULTANT INVESTMENT AND CONSTRUCTION JOINT STOCK COMPANY
22/10/2024 09:30
The Bid solicitor Vietnam Inland Waterway Administration has posted the results of the bidding package TVGS.TTBHMN-04: Construction supervision consultancyConstruction, replacement and installation of signs in MN area 04 - year 2024 of the investor Vietnam Inland Waterway Administration.
- Winning bidder: SOUTHERN WATERWAY ROAD CONSTRUCTION CONSULTING JOINT STOCK COMPANY
22/10/2024 09:27
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TTBH-MB03-BH: Construction work: Replacing signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh Palace to Ta Bu) of the investor Vietnam Inland Waterway Administration with the form Open bidding.
17/10/2024 15:24
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TTBH-MB03.MC: Construction work: Reinforcement of signal column foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) of the investor Vietnam Inland Waterway Administration with the form Open bidding.
17/10/2024 15:24
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Plan for selecting contractors for projects: Replacement of signals on Da River route (including Hoa Binh lake and Son La lake) (section from N3 Hong Da to downstream of Hoa Binh hydroelectric dam, section from upstream of hydroelectric dam Hoa Binh to Ta Bu); Reinforcement of signal pole foundations on Song Da route (including Hoa Binh lake and Son La lake) (section from upstream of Hoa Binh hydroelectric dam to Ta Bu) of the investor Vietnam Inland Waterway Administration with 2 bidding package.
17/10/2024 11:26
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Project contractor selection plan: Dredging to ensure Ong Doc river traffic (section from Km3+650 – Km6+100; Km9+100 – Km9+350; Km15+100 – Km49+500) of the investor Vietnam Inland Waterway Administration with 12 bidding package.
14/10/2024 10:33
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice XL.TTSH-SD: Clearing Cong Thon rock site km 58+000 left bank of Duong river; rocky beach km 180+400; km 182+600 Red River; Hai Boi rock beach km 194+000 and regulate and control traffic to serve construction of the investor Vietnam Inland Waterway Administration with the form Open bidding.
09/10/2024 15:03
Bid solicitor Vietnam Inland Waterway Administration has posted Tender Notice TVGS.TTSH-SD: Construction supervision consultancy for projects: Clearing Cong Thon rock site km 58+000 left bank of Duong river; Clearance of stone dump km 180+400; km 182+600 Red River; Clearing Hai Boi rock site km194+000 Red River of the investor Vietnam Inland Waterway Administration with the form Open bidding.
07/10/2024 15:24
The Bid solicitor Vietnam Inland Waterway Administration has posted the request Plan for selecting contractors for construction packages of works: Clearing Cong Thon rock site km 58+000 left bank of Duong River; Clearance of rock dump km 180+400; km 182+600 Red River; Clearing Hai Boi rock site km194+000 Red River of the investor Vietnam Inland Waterway Administration with 4 bidding package.
07/10/2024 14:55
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Vietnam Inland Waterway Administration has posted 136 of the contractor selection plan, which contains 562 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Vietnam Inland Waterway Administration has posted 281 Tender Notice in the 261 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vietnam Inland Waterway Administration has posted 245 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 245 package, canceled the bid 0 package (among the bidding packages above).
- There are 1 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Vietnam Inland Waterway Administration has a relationship with 97 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Inland Waterway Administration has a relationship with 2 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Inland Waterway Administration is the investor of 281 package, of which 281 package is self-invited, other units invite bid 0 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Inland Waterway Administration is the owner of 101 contractor selection plan. In which, they self-invite 99 of contractor selection plan, other units invite bids of 2 of contractor selection plan.
Summary: Investor Vietnam Inland Waterway Administration is an investor with 97 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vietnam Inland Waterway Administration is the investor of 1 development investment project develop. The data sheet has been partially hidden, to see the full information please Login or Register