Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
Data analysis results of DauThau.info software for bid solicitors Vinacomin Dak Nong Aluminium Company as follows:
- Has relationships with 88 contractor.
- Announced 0 investment development project, of which 0 projects have not yet announced the prequalification documents.
- Announced 183 contractor selection plans with a total of 189 bidding packages, of which 177 prequalification documents have not found the investment project.
- Has invited bids for 177 packages (with 200 tender notices), and conducted prequalification for 0 packages.
- Announced the results of 185 package, and canceled bids for 0 packages (among the packages mentioned above).
- There are 10 packages with results that do not have tender notice or prequalification notice.
- There are 14 packages that have not fully posted the contractor selection results. Of these 9 bidding packages have no tender notices found.
- On average, the number of contractors participating in each package is: 1.37 contractors.
- Breakdown by bidding field: Goods 14.00%, Construction 17.00%, Consultancy 0%, Non-consultancy 66.50%, Mixed 2.50%, Other fields 0%.
- The total value according to the packages with valid contractor selection results is: 2,704,772,233,032 VND, of which the total winning bid value is: 2,384,249,155,708 VND.
- The savings rate is: 11.85%.
Data analysis results of DauThau.info software for bid solicitors Vinacomin Dak Nong Aluminium Company as follows:
- Has relationships with 88 contractor.
- The average number of contractors participating in each bidding package is: 1.37 contractors.
- Proportion of bidding fields: Goods 14.00%, Construction 17.00%, Consulting 0%, Non-consulting 66.50%, Mixed 2.50%, Other 0%.
- The total value according to the bidding package with valid IMP is: 2,704,772,233,032 VND, in which the total winning value is: 2,384,249,155,708 VND.
- The savings rate is: 11.85%.
This Bid solicitor is also the investor, the analysis information is as follows:
- Is the investor of 0 investment and development projects.
- As the owner of 178 Contractor selection plan in which 178 Contractor selection plan is self-published, and 0 Contractor selection plan is posted by other units.
- Being the investor of 189 bidding packages in which 188 packages are self-invited, and 1 packages are invited by other units.
Evaluation criteria | Evaluation score |
---|---|
Experience | ??? |
Financial capacity | ??? |
Transparency of the investor/bidder | ??? |
Bidding efficiency | ??? |
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair of Main Building of Coal Gasification Plant (C01) of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CĐ 1
06/12/2022 14:28
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Crusher pads of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
14/11/2022 07:50
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of boiler No. 2 of Thermal Power Workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: Công ty cổ phần máy và vật tư thiết bị Sài Gòn
03/11/2022 10:11
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Major repair of Class I cyclone system A-13YH1S023b in Crystallization workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH THIẾT BỊ TRUNG QUỐC
27/10/2022 15:27
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Maintenance of DCS control system at Nhan Co Alumin Factory of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:50
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of J1 and J2 pipes in the Water - compressed air and environment treatment workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:43
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repairing and maintaining the top insulation of the A-08 sump tank in the Washing workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
25/10/2022 16:42
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of C02 coal storage gantry crane in the area of Coal Gasification Workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:41
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repairing, maintaining and cleaning the horizontal belt filter machine A-14YH2S001C in the Crystallization workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:40
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair of freeze dryer D-02R1S003(a b c d) in the Treatment workshop - Compressed air water and environment of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ TIẾN TUẤN BẢO LÂM
25/10/2022 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repair of Main Building of Coal Gasification Plant (C01) .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CĐ 1
06/12/2022 14:28
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Crusher pads .
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
14/11/2022 07:50
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repair and maintenance of boiler No. 2 of Thermal Power Workshop .
- Winning bidder: Công ty cổ phần máy và vật tư thiết bị Sài Gòn
03/11/2022 10:11
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Major repair of Class I cyclone system A-13YH1S023b in Crystallization workshop .
- Winning bidder: CÔNG TY TNHH THIẾT BỊ CÔNG NGHIỆP G7, CÔNG TY TNHH THIẾT BỊ TRUNG QUỐC
27/10/2022 15:27
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Maintenance of DCS control system at Nhan Co Alumin Factory .
- Winning bidder: CÔNG TY TNHH KỸ THUẬT CÔNG NGHỆ ĐIỆN TỰ ĐỘNG BIỂN ĐÔNG
25/10/2022 16:50
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repair and maintenance of J1 and J2 pipes in the Water - compressed air and environment treatment workshop .
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CĐ 1
25/10/2022 16:43
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repairing and maintaining the top insulation of the A-08 sump tank in the Washing workshop .
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
25/10/2022 16:42
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repair and maintenance of C02 coal storage gantry crane in the area of Coal Gasification Workshop .
- Winning bidder: Công ty Cổ phần Công nghệ Tự động hóa Sao Việt
25/10/2022 16:41
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repairing, maintaining and cleaning the horizontal belt filter machine A-14YH2S001C in the Crystallization workshop .
- Winning bidder: Công ty cổ phần máy và vật tư thiết bị Sài Gòn
25/10/2022 16:40
Vinacomin Dak Nong Aluminium Company announced the results of the bid package Repair of freeze dryer D-02R1S003(a b c d) in the Treatment workshop - Compressed air water and environment .
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ TIẾN TUẤN BẢO LÂM
25/10/2022 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair of Main Building of Coal Gasification Plant (C01) of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH MỘT THÀNH VIÊN CĐ 1
06/12/2022 14:28
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Crusher pads of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
14/11/2022 07:50
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of boiler No. 2 of Thermal Power Workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: Công ty cổ phần máy và vật tư thiết bị Sài Gòn
03/11/2022 10:11
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Major repair of Class I cyclone system A-13YH1S023b in Crystallization workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH THIẾT BỊ TRUNG QUỐC
27/10/2022 15:27
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Maintenance of DCS control system at Nhan Co Alumin Factory of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:50
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of J1 and J2 pipes in the Water - compressed air and environment treatment workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:43
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repairing and maintaining the top insulation of the A-08 sump tank in the Washing workshop of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH CƠ KHÍ ĐÚC TOÀN THẮNG
25/10/2022 16:42
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair and maintenance of C02 coal storage gantry crane in the area of Coal Gasification Workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:41
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repairing, maintaining and cleaning the horizontal belt filter machine A-14YH2S001C in the Crystallization workshop of the investor Vinacomin Dak Nong Aluminium Company.
25/10/2022 16:40
The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted the results of the bidding package Repair of freeze dryer D-02R1S003(a b c d) in the Treatment workshop - Compressed air water and environment of the investor Vinacomin Dak Nong Aluminium Company.
- Winning bidder: CÔNG TY TNHH THƯƠNG MẠI DỊCH VỤ TIẾN TUẤN BẢO LÂM
25/10/2022 16:38
The data sheet has been partially hidden, to see the full information please Login or Register
To receive this bid solicitor's earliest contractor selection plan by email, please create register for the VIP2 package.
Summary: The bid solicitor’s Vinacomin Dak Nong Aluminium Company has posted 183 of the contractor selection plan, which contains 189 of the bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
To receive the earliest Tender Notice of this Bid solicitor via email, please register for the VIP1 package.
Summary: The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted 200 Tender Notice in the 177 bidding package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: The Bid solicitor Vinacomin Dak Nong Aluminium Company has posted 185 contractor selection result in which:The data sheet has been partially hidden, to see the full information please Login or Register
- Published the results of the 185 package, canceled the bid 0 package (among the bidding packages above).
- There are 10 packages with no results found tender notice, Prequalifying Invitation Notice.
Summary: The Bid solicitor Vinacomin Dak Nong Aluminium Company has a relationship with 88 contractors. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vinacomin Dak Nong Aluminium Company has a relationship with 1 soliciting party. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vinacomin Dak Nong Aluminium Company is the investor of 189 package, of which 188 package is self-invited, other units invite bid 1 package. The data sheet has been partially hidden, to see the full information please Login or Register
Summary: Investor Vinacomin Dak Nong Aluminium Company is the owner of 178 contractor selection plan. In which, they self-invite 178 of contractor selection plan, other units invite bids of 0 of contractor selection plan.
Summary: Investor Vinacomin Dak Nong Aluminium Company is an investor with 87 contractor. The data sheet has been partially hidden, to see the full information please Login or Register
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Security Code