Contact Us
- 0904.634.288, 024.8888.4288
- [email protected]
- Facebook Fanpage: http://fb.com/dauthau.info
- Messenger: http://m.me/dauthau.info
Contact Us
| No | List of product/services | Quantity | Unit | Description | Location | Specification | Note | Feature |
|---|---|---|---|---|---|---|---|---|
1 |
Indoor P3 LED screen system Hall 503, display size: 4,032m x 2,496m = 10,064m2 |
1 |
System |
A. GENERAL REQUIREMENTS: - Equipment must be 100% new, unused, manufactured from 2026 onwards, and legally circulated in the Vietnamese market. - Equipment must have complete information: Model number, brand, manufacturer, and country of origin. - All main equipment and auxiliary materials constituting the system must be technically compatible, synchronously connected, ensuring safe, stable, and conflict-free system operation. - The manufacturer of the main equipment (Indoor LED P3 Module, specialized static power converter for LED screens, signal receiving card, image processor) must meet ISO 9001 quality management standards, ISO 14001 environmental standards, and international safety certifications (CE, RoHS, FCC, or equivalent). B. CONFIGURATION REQUIREMENTS: * Indoor P3 LED screen system for Hall 503, display size: 4.032m x 2.496m = 10.064m² (including border size: 4.112m x 2.576m = 10.593m²). (Allowable error ± 1%). Detailed components include: 1. Indoor P3 LED modules: 280 panels (including 7 spare panels). 2. Dedicated LED screen electrostatic discharge (ESD) converters: 35 sets. 3. Signal receiving cards: 7 units. 4. Image processor: 1 unit. 5. Support frame: 10.593m². 6. Finished aluminum side paneling: 3m². 7. Auxiliary materials and installation/setup labor: 1 package. C. DETAILED TECHNICAL REQUIREMENTS: 1. Indoor P3 LED Module: - Pixel structure: SMD 3-in-1 technology or equivalent. - LED type: SMD 2020 or equivalent. - Pixel pitch: P3 (≤ 3mm). - Module panel resolution: ≥ 64 x 64 dots. - Number of pixels/m²: ≥ 110,000 dots. - Module panel size: Fixed 192 x 192 mm. - Module panel weight: ≤ 0.22 kg. - Module panel input voltage: DC 4.2V – 5.0V. - Module panel maximum current: ≤ 2A. - Display brightness: ≥ 600 cd/m² (nits). - Maximum power consumption of the module: ≤ 10 W. - Standard viewing angle: Horizontal ≥ 120° / Vertical ≥ 120°. - Brightness/color uniformity: ≥ 95%. - Contrast ratio: ≥ 3000:1. - Scanning standard: 1/32 Scanning, constant current. - Refresh rate: ≥ 3800 Hz. - Data cable connection: HUB75. 2. Dedicated static power converter for LED screens: - Input voltage: AC 180V ÷ 240V, frequency 50/60 Hz. - Output voltage: DC 5V. - Maximum power output: ≥ 200W. - Protection mode: Integrated output short-circuit protection. 3. Signal Receiver Card: - Control range: Maximum ≥ 325,000 pixels. - Scanning method: Supports static scanning to 1/128s scanning. - Communication method: Supports 2 Gigabit Ethernet network ports, 16-port HUB75E data output. - Voltage, power consumption: DC 4.0V ÷ 5.5V; ≤ 5W. 4. Image Processor: - Display features: Supports point-to-point display technology. - Maximum total load capacity: ≥ 1.3 million pixels. - Maximum load width: ≥ 3,800 pixels. - Maximum load height: ≥ 2,500 pixels. - Input ports: ≥ 2 HDMI 1.4 ports; ≥ 1 USB 2.0 port. - Output ports: ≥ 2 Gigabit network ports (RJ45); ≥ 1 Audio Out port (TRS 3.5mm). 5. Support frame: - Main steel frame: 30 x 60 x 1.1mm rectangular steel. - Magnetic suction frame: 20 x 40 x 1.0mm rectangular steel. - Requirements: Welds must be ground smooth and coated with anti-rust paint; surface flatness after module installation must be ≤ 0.5mm. 6. Aluminum side panel finish: - Color: Black. - Panel thickness: ≥ 3mm. - Paint coating thickness: ≥ 16µm. - Aluminum layer thickness: ≥ 0.1mm. - Core material: Flame-retardant plastic. 7. Auxiliary materials and installation labor: - Auxiliary materials include: Electrical cabinets, adhesive tape, cable ties, wall plugs, nails, screws, plugs, silicone sealant... and other auxiliary materials compatible with the system. - Labor: All costs for transportation, complete installation, and equipment configuration to ensure stable system operation are covered. D. OTHER REQUIREMENTS - Time for handover, installation, operation, and user instruction: ≤ 30 days from the effective date of the contract. - Warranty period: ≥ 24 months from the date of handover and acceptance of goods. - Location for handover, installation, operation, and user instruction: Quarter 8, Quy Nhon Bac Ward, Gia Lai Province. - Provide CO and CQ certificates upon handover of goods. - Response time to handle incidents upon request: ≤ 72 hours. |
Quy Nhon Institute of Malaria - Parasitology - Entomology (Address: Quarter 8, Quy Nhon Bac Ward, Gia Lai Province) |
|||
2 |
Indoor P3 LED screen system Meeting room 217, display size: 2,880m x 1,536m = 4,424m2 |
1 |
System |
A. GENERAL REQUIREMENTS: - Equipment must be 100% new, unused, manufactured from 2026 onwards, and legally circulated in the Vietnamese market. - Equipment must have complete information: Model number, brand, manufacturer, and country of origin. - All main equipment and auxiliary materials constituting the system must be technically compatible, synchronously connected, ensuring safe, stable, and conflict-free system operation. - The manufacturer of the main equipment (Indoor LED P3 Module, specialized static power converter for LED screens, signal receiving card, image processor) must meet ISO 9001 quality management standards, ISO 14001 environmental standards, and international safety certifications (CE, RoHS, FCC, or equivalent). B. CONFIGURATION REQUIREMENTS: * Indoor P3 LED screen system for Meeting Room 217, display size: 2.880m x 1.536m = 4.424m² (including border size: 2.960 x 1.616m = 4.783m²). (Allowable error ± 1%). Detailed components include: 1. Indoor P3 LED modules: 125 panels (including 5 spare panels). 2. Dedicated LED screen static power converters: 20 sets. 3. Signal receiving cards: 5 units. 4. Image processor: 1 unit. 5. Support frame: 4.780m². 6. Finished aluminum side paneling: 2m². 7. Auxiliary materials and installation/setup labor: 1 package. C. DETAILED TECHNICAL REQUIREMENTS: 1. Indoor P3 LED Module: - Pixel structure: SMD 3-in-1 technology or equivalent. - LED type: SMD 2020 or equivalent. - Pixel pitch: P3 (≤ 3mm). - Module panel resolution: ≥ 64 x 64 dots. - Number of pixels/m²: ≥ 110,000 dots. - Module panel size: Fixed 192 x 192 mm. - Module panel weight: ≤ 0.22 kg. - Module panel input voltage: DC 4.2V – 5.0V. - Module panel maximum current: ≤ 2A. - Display brightness: ≥ 600 cd/m² (nits). - Maximum power consumption of the module: ≤ 10 W. - Standard viewing angle: Horizontal ≥ 120° / Vertical ≥ 120°. - Brightness/color uniformity: ≥ 95%. - Contrast ratio: ≥ 3000:1. - Scanning standard: 1/32 Scanning, constant current. - Refresh rate: ≥ 3800 Hz. - Data cable connection: HUB75. 2. Dedicated static power converter for LED screens: - Input voltage: AC 180V ÷ 240V, frequency 50/60 Hz. - Output voltage: DC 5V. - Maximum power output: ≥ 200W. - Protection mode: Integrated output short-circuit protection. 3. Signal Receiver Card: - Control range: Maximum ≥ 195,000 pixels. - Scanning method: Supports static scanning to 1/128s scanning. - Communication method: Supports 2 Gigabit Ethernet network ports, 12-port HUB75E data output. - Voltage, power consumption: DC 3.8V ÷ 5.5V; ≤ 3W. 4. Image Processor: - Display features: Supports point-to-point display technology. - Maximum total load capacity: ≥ 1.3 million pixels. - Maximum horizontal load: ≥ 3,800 pixels. - Maximum vertical load: ≥ 2,500 pixels. - Input ports: ≥ 2 HDMI 1.4 ports; ≥ 1 USB 2.0 port. - Output ports: ≥ 2 Gigabit network ports (RJ45); ≥ 1 Audio Out port (TRS 3.5mm). 5. Support frame: - Main steel frame: 30 x 60 x 1.1mm rectangular steel. - Magnetic suction frame: 20 x 40 x 1.0mm rectangular steel. - Requirements: Welds must be ground smooth and coated with anti-rust paint; surface flatness after module installation must be ≤ 0.5mm. 6. Aluminum side panel finish: - Color: Black. - Panel thickness: ≥ 3mm. - Paint coating thickness: ≥ 16µm. - Aluminum layer thickness: ≥ 0.1mm. - Core material: Flame-retardant plastic. 7. Auxiliary materials and installation labor: - Auxiliary materials include: Electrical cabinets, adhesive tape, cable ties, wall plugs, nails, screws, plugs, silicone sealant... and other auxiliary materials compatible with the system. - Labor: All costs for transportation, complete installation, and equipment configuration to ensure stable system operation are covered. D. OTHER REQUIREMENTS - Time for handover, installation, operation, and user instruction: ≤ 30 days from the effective date of the contract. - Warranty period: ≥ 24 months from the date of handover and acceptance of goods. - Location for handover, installation, operation, and user instruction: Quarter 8, Quy Nhon Bac Ward, Gia Lai Province. - Provide CO and CQ certificates upon handover of goods. - Response time to handle incidents upon request: ≤ 72 hours. |
Quy Nhon Institute of Malaria - Parasitology - Entomology (Address: Quarter 8, Quy Nhon Bac Ward, Gia Lai Province) |
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Select columns to display
If you are still not our member, please sign up.You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!
Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.
Detailed instructions on how to deposit money and redeem points on DauThau.info
When does contract negotiation fail?
[VIDEO] Guide for bid solicitors to Extend the Bid Submission Deadline
[VIDEO] Guide to Evaluating Bid Documents on the New National Bidding Network System
[VIDEO] Guide to Posting Tender Notices for PPP Projects
[VIDEO] Guide to Posting Prequalification Notices for PPP Projects
[VIDEO] Guide to Responding to Clarification Requests for e-HSMST (E-Prequalification Invitation Documents) of PPP Projects on the New National Bidding Network System
[VIDEO] Guide to Uploading the Shortlist for PPP Projects
Similar goods purchased by Investor Institute of Malariology Parasitology and Entomology Quy Nhon:
No similar goods purchased by the Investor were found.
Similar goods purchased by other Investor excluding Institute of Malariology Parasitology and Entomology Quy Nhon:
No similar goods have been found that other Investor have purchased.
Similar goods for which the bidding results of the Ministry of Health have been announced:
No similar goods have been found in the bidding results of the Ministry of Health.